ROYAL PALM PHASE - 1

By SIDDHI DEVELOPERS

RG-MH-06152 · RERA P51700052162 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 37%
75 of 95Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

ROYAL PALM PHASE - 1 is a Others project by SIDDHI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700052162 on 27 Jul 2023. Possession is promised by 30 Jun 2027. 20 of the 95 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameROYAL PALM PHASE - 1
  • TypeOthers
  • Location
    • NA
    • WASHIND
    • Washind (CT)
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052162
  • ReraGenie IDRG-MH-06152

Builder

  • NameSIDDHI DEVELOPERS
  • Entity typePartnership
  • PartnersGOPAL SINGH MAGAN SINGH GOAR, DAULAT LAXMAN SASE, MAHESH KUMAR GADIA, VIKAS YADAV PATIL
  • Other registrations9 more →
  • Completed5 of 10
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2023PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jul 2023
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed75 files

Current status

21%20 of 95 units booked
26.3%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA8728230
BUILDING 2NA8756965

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 37%.

BUILDING 139%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 232%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure37%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed188

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots188
Closed/Covered188
BuildingClosed/CoveredTotal
BUILDING 19494
BUILDING 29494

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,120 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jul 2025
LandownerVillageDistrict
BALU UNDRUBHIORWashind (CT)Thane

Approvals and building plan

Sanctioning authorityDISTRICT MAGISTRATE OFFICE THANE
Permissible FSI4778.63
Proposed, not sanctioned4,779 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTITWALA
Estimated costRs 10.58 cr
Cost incurredRs 2.79 cr
Work done26.33%
BuildingWingEstimatedIncurred
BUILDING 2NARs 6.64 crRs 1.52 cr
BUILDING 1NARs 3.16 crRs 1.27 cr
-NARs 77.53 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKARAN SHARMA
EngineerJAI M TALREJA
EngineerDHIRAJ SAKHARAM TARMAL
Chartered AccountantCA MULRAJ GALA
Chartered AccountantRAUNAK KHAN & ASSOCIATES
PartnerRole in project
SIDDHI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_MAECH 26_SIDDHI DEVELOPERS.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2_MAECH 26_SIDDHI DEVELOPERS.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3_ MARCH 26_ SIDDHI DEVELOPERS.pdf24 Apr 2026
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ ROYAL PALM PHASE 1.pdf21 Jan 2026
Form 5 (FY 2023-2024)File: FORM 5_ MARCH 24_ ROYAL PALM PHASE 1.pdf21 Jan 2026
Withdrawal Update Form 1File: FORM 1_DEC 25_SIDDHI DEVELOPERS.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2_DEC 25_SIDDHI DEVELOPERS.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3_DEC 25_SIDDHI DEVELOPERS.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1_SEP 25_SIDDHI DEVELOPERS.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2_SEP 25_SIDDHI DEVELOPERS.pdf16 Oct 2025
Withdrawal Update Form 3File: FORM 3_SIDDHI DEV _SEP 25 SIGN.pdf16 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A-2025-Siddhi Developers.pdf16 Oct 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ SIDDHI DEVELOPERS.pdf22 Jul 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ SIDDHI DEVELOPERS.pdf22 Jul 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ SIDDHI DEVELOPERS.pdf22 Jul 2025
Form 1File: FORM 1_ JUNE 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 2File: FORM 2_ JUNE 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 3File: FORM 3_ JUNE 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 1File: FORM 1_ SEP 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 2File: FORM 2_ SEP 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 3File: FORM 3_ SEP 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 1File: FORM 1_ DEC 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 2File: FORM 2_ DEC 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 3File: FORM 3 DEC-2024 SIDDHI DEVELOPERS.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ DEC 24_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 1File: FORM 1_ MARCH 25_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 2File: FORM 2_ MRCH 25_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Form 3File: FORM 3_ MARCH 25_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Withdrawal Update Form 1File: FORM 1_ MARCH 25_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Withdrawal Update Form 2File: FORM 2_ MRCH 25_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Withdrawal Update Form 3File: FORM 3_ MARCH 25_ SIDDHI DEVELOPERS.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ROYAL PALM PHASE 1_MAR 24.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ROYAL PALM PHASE 1_MAR 24_compressed.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ROYAL PALM PHASE 1_MAR 24.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ROYAL PALM PHASE 1_MAR 24_compressed.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-ROYAL PALM PHASE 1_23 24.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-ROYAL PALM PHASE 1_MAR 24.pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-ROYAL PALM PHASE 1_MAR 24_compressed.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: bldg 1 sept 2023001.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: BLDG 2 SEP.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: bldg 1 dec 2023001.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: BLDG 2 DEC.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ROYAL PALM PHASE 1_DEC 23.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ROYAL PALM PHASE 1_DEC 23.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-ROYAL PALM PHASE 1_DEC 23_compressed.pdf2 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: GOPAL_merged_compressed.pdf27 Jun 2023
Layout approvalFile: 5 Copy of Layout Approval (in case of layout).pdf17 Jun 2023
Building plan approvalFile: 6 Building Plan Approval 1.pdf17 Jun 2023
Building plan approvalFile: 6 Building Plan Approval 2.pdf17 Jun 2023
PAN CardFile: 1 PAN Card.pdf17 Jun 2023
Copy of the legal title reportFile: 2 Copy of the legal title report.pdf17 Jun 2023
Details of encumbrances concerned to FinanceFile: 3 a Details of encumbrances concerned to Finance.pdf17 Jun 2023
Details of encumbrances concerned to FinanceFile: 4 b Details of encumbrances concerned to Legal.pdf17 Jun 2023
Details of encumbrances concerned to LegalFile: 3 a Details of encumbrances concerned to Finance.pdf17 Jun 2023
Details of encumbrances concerned to LegalFile: 4 b Details of encumbrances concerned to Legal.pdf17 Jun 2023
Copy of Layout Approval (in case of layout)File: 5 Copy of Layout Approval (in case of layout).pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval 1.pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval 2.pdf17 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificate- 1_compressed.pdf17 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificate- 2_compressed.pdf17 Jun 2023
Declaration about Commencement CertificateFile: cc .pdf17 Jun 2023
Declaration in FORM BFile: 9 Declaration in FORM B.pdf17 Jun 2023
CERSAI detailsFile: 12 CERSAI details.pdf17 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf17 Jun 2023
Proforma of Agreement for saleFile: 15 Proforma of Agreement for sale.pdf17 Jun 2023
Proforma of Allotment letterFile: 16 Proforma of Allotment letter.pdf17 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 17 Separate Bank Account details including no encumbrances on the Bank Account or no escro17 Jun 2023
Deviation Report with respect to Allotment letterFile: 18 Deviation Report with respect to Allotment letter.pdf17 Jun 2023
Deviation Report with respect to model copy of AgreementFile: 7 draft - deviation.pdf17 Jun 2023

How this compares with Thane

21%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROYAL PALM PHASE - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WASHIND7,600+ in Thane

2 kmROYAL PALM PHASE - 1Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: SIDDHI DEVELOPERS

SIDDHI DEVELOPERS has 10 registrations on MahaRERA, including SIDDHI COMPLEX and Pragati Residency. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ROYAL PALM PHASE - 1 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROYAL PALM PHASE - 1?

The registered promoter entity is SIDDHI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROYAL PALM PHASE - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROYAL PALM PHASE - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROYAL PALM PHASE - 1?

The professionals named in the filing: Architect: KARAN SHARMA; Engineer: JAI M TALREJA; Engineer: DHIRAJ SAKHARAM TARMAL; Chartered Accountant: CA MULRAJ GALA; Chartered Accountant: RAUNAK KHAN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROYAL PALM PHASE - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROYAL PALM PHASE - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROYAL PALM PHASE - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.