ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ROYAL COURT

Registered No litigation declared Residential / Group Housing project

ROYAL COURT

By SHRI ANAND VENKATESHWARA ASSOCIATES

RG-MH-23348 · RERA P52100078656 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 70%
6 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

ROYAL COURT is a Residential / Group Housing project by SHRI ANAND VENKATESHWARA ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100078656 on 1 Jan 2025. Possession is promised by 31 Dec 2026. 29 of the 35 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameROYAL COURT
  • TypeResidential / Group Housing
  • Location
    • THERGAON
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078656
  • ReraGenie IDRG-MH-23348

Builder

  • NameSHRI ANAND VENKATESHWARA ASSOCIATES
  • Entity typePartnership
  • PartnersMOHANLAL KANHAIYALAL SANCHETI, SHRIRANG CHANDU BARNE

Key dates

this monthRegisteredJan 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jan 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

83%29 of 35 units booked
86.6%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D WINGNA6635035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 70%.

D WING: 97% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Closed/Covered1
Open Space36

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,162 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHICHWAD MUNICIPAL CORPORATION
Permissible FSI3495.79
Proposed, not sanctioned3,496 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchATHARVA, CTS 4565, RATNADEEP COLONY, WAKAD ROAD, NEAR DANGE CHOWK, THERGAON, PUNE-411033
Estimated costRs 13.04 cr
Cost incurredRs 11.30 cr
Work done86.64%
BuildingWingEstimatedIncurred
D WINGNARs 11.04 crRs 9.60 cr
-NARs 2.00 crRs 1.70 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIP Associates
EngineerPratik Jain
EngineerAvinash Hole
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
SHRI ANAND VENKATESHWARA ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1 Final.pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2 Final.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 Final.pdf12 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf20 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf20 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf20 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf20 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf20 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: RERA Form 5 UPLOAD.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1 Final.pdf29 Jul 2025
Withdrawal Update Form 2File: Form 2 Final.pdf29 Jul 2025
Withdrawal Update Form 3File: Form 3 Final.pdf29 Jul 2025
Form 1File: Form 1.pdf13 Jul 2025
Form 2File: Form 2.pdf13 Jul 2025
Form 3File: Form 3 Final.pdf13 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclose Sold Invetory.pdf13 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclose Sold Invetory.pdf18 Apr 2025
Other - LegalFile: Declaration.pdf20 Dec 2024
Other - LegalFile: Consent Revised.pdf20 Dec 2024
Other - LegalFile: OC.pdf20 Dec 2024
Other - FinanceFile: OC.pdf20 Dec 2024
Other - FinanceFile: Consent Revised.pdf20 Dec 2024
Other - FinanceFile: Declaration.pdf20 Dec 2024
Other - TechnicalFile: Declaration.pdf20 Dec 2024
Other - TechnicalFile: Consent Revised.pdf20 Dec 2024
Other - TechnicalFile: Completion Certificate -D Wing.pdf13 Dec 2024
Proforma of Agreement for saleFile: Agreement To Sale.pdf13 Dec 2024
Other - TechnicalFile: Declaration Cum Undertaking.pdf2 Dec 2024
Other - TechnicalFile: CC Mail.pdf2 Dec 2024
Copy of the legal title reportFile: Legal Title.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf28 Nov 2024
Building plan approvalFile: Building 08.pdf23 Nov 2024
Building plan approvalFile: Building 07.pdf23 Nov 2024
Building plan approvalFile: Building 06.pdf23 Nov 2024
Building plan approvalFile: Building 05.pdf23 Nov 2024
Building plan approvalFile: Building 04.pdf23 Nov 2024
Building plan approvalFile: Building 03.pdf23 Nov 2024
Building plan approvalFile: Building 02.pdf23 Nov 2024
Building plan approvalFile: Building 01.pdf23 Nov 2024
Layout approvalFile: Sanction Plan_11zon.pdf23 Nov 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan_11zon.pdf23 Nov 2024
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf23 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 01.pdf23 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 02.pdf23 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 03.pdf23 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 04.pdf23 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 05.pdf23 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 06.pdf23 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 07.pdf23 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 08.pdf23 Nov 2024
Other - LegalFile: 7'12.pdf23 Nov 2024
Other - LegalFile: थेरगांव_23_2_1_11_Satbara (1).pdf23 Nov 2024
PAN CardFile: Firm PAN.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Nov 2024
Other - TechnicalFile: Plot Decalartion.pdf22 Nov 2024
Details of encumbrances concerned to FinanceFile: No Financial Encumbrances.pdf18 Nov 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf18 Nov 2024
Declaration in FORM BFile: Form B Promoter.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement_compressed.pdf18 Nov 2024
Other - LegalFile: Purchase Deed.pdf18 Nov 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf18 Nov 2024
CERSAI detailsFile: CERSAI REPORT.pdf18 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format -A -Declaration about Separate Bank Account for Real Estate Projects.pdf18 Nov 2024
Deviation Report with respect to Allotment letterFile: No Deviation With Respect to Allotment Letter.pdf18 Nov 2024
Details of encumbrances concerned to LegalFile: No Financial Encumbrances.pdf18 Nov 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf18 Nov 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation With Respect to Model Copy of Agreement.pdf18 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration Of Barne.pdf18 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration Of Sancheti.pdf18 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf18 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclouser Of secured.pdf18 Nov 2024

How this compares with Pune

83%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROYAL COURT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THERGAON13,700+ in Pune

2 kmROYAL COURTCompleted 111Lapsed / revoked 53Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 215 registered projects within 2 km.

Builder: SHRI ANAND VENKATESHWARA ASSOCIATES

SHRI ANAND VENKATESHWARA ASSOCIATES has 1 registration on MahaRERA, including ROYAL COURT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ROYAL COURT is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROYAL COURT?

The registered promoter entity is SHRI ANAND VENKATESHWARA ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROYAL COURT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROYAL COURT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROYAL COURT?

The professionals named in the filing: Architect: IP Associates; Engineer: Pratik Jain; Engineer: Avinash Hole; Chartered Accountant: PGMJ & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROYAL COURT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROYAL COURT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROYAL COURT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.