ROSE VILLA

By KEYSTONE CREATION

RG-MH-05428 · RERA P51700051844 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 75%
32 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

ROSE VILLA is a Residential / Group Housing project by KEYSTONE CREATION in Thane, Maharashtra, registered with MahaRERA as P51700051844 on 7 Jul 2023. Possession is promised by 31 Dec 2027. 3 of the 35 units on this registration are recorded sold or booked, and 3 of 44 construction stages are filed complete.

At a glance

Project

  • NameROSE VILLA
  • TypeResidential / Group Housing
  • Location
    • NEXT TO ROYAL FLORA
    • PALE
    • AMBERNATH
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051844
  • ReraGenie IDRG-MH-05428

Builder

  • NameKEYSTONE CREATION
  • Entity typePartnership
  • PartnersMR ASHOK JAGNARAYAN SONAR, MR DILIPKUMAR KHUSHALDAS DEWANI, MR NARAYAINDAS HERANAND NANJANI, MR SUNIL WAMAN CHOUDHARI, MR GUNWANTKUMAR SOHANLAL KHERODIYA
  • Declared earlier projects5 →

Key dates

this monthRegisteredJul 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jul 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed87 files

Current status

9%3 of 35 units booked
28.7%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA8814014
BUNGLOWS PHASE 1 AND SHOPNA22617
BUNGLOW PHASE 2NA22707
BUNGLOW PHASE 3NA22707

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 75%.

BUILDING NO 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGLOWS PHASE 1 AND SHOP39%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGLOW PHASE 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGLOW PHASE 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes0%
Street LightingYes15%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered1
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1123
BUNGLOWS PHASE 1 AND SHOP022
BUNGLOW PHASE 2022
BUNGLOW PHASE 3022

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,500 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jan 2026

Approvals and building plan

Sanctioning authorityAmbarnath Muncipal Planning Authority
Permissible FSI6550.48
Proposed, not sanctioned6,550 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHARDDA COMPLEX AMBERNATH 421501
Estimated costRs 14.00 cr
Cost incurredRs 4.02 cr
Work done28.7%
BuildingWingEstimatedIncurred
BUNGLOW PHASE 3NARs 13.00 crRs 3.77 cr
-NARs 1.00 crRs 25.31 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAVINDRA G. PAWAR
EngineerRAVINDRA G. PAWAR
EngineerHITESH VIJAY NIKAM
Chartered AccountantVIKAS KAMRA & CO. CHARTERED ACCOUNTANTS
Chartered AccountantRahul Balu Bhadange
Chartered AccountantNarendra Prajapati
PartnerRole in project
KEYSTONE CREATION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 ROSE VILA BY KS MARCH 26.pdf9 May 2026
Withdrawal Update Form 2File: form 2 ROSE VILA BY KS MARCH 26.pdf9 May 2026
Withdrawal Update Form 3File: Form 3 March 26.pdf9 May 2026
Withdrawal Update Form 1File: form 1 ROSE VILA BY KS Dec 25.pdf21 Jan 2026
Withdrawal Update Form 2File: form 2 ROSE VILA BY KS DEC 25.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 (1).pdf21 Jan 2026
Withdrawal Update Form 1File: form 1 30 09 2025.pdf28 Oct 2025
Withdrawal Update Form 2File: form 2 30 09 2025.pdf28 Oct 2025
Withdrawal Update Form 3File: Form 3 30 09 2025_compressed.pdf28 Oct 2025
Form 2A (FY 2023-2024)File: FORM2A 15.04.2024.pdf2 Aug 2025
Form 2A (FY 2024-2025)File: FORM 2A 15.04.2025.pdf2 Aug 2025
Form 1File: form 1 ROSE VILA BY KS JUNE 25.pdf28 Jul 2025
Form 2File: form 2 ROSE VILA BY KS JUN 25.pdf28 Jul 2025
Form 3File: form 3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory June 25.pdf28 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf28 Jul 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf28 Jul 2025
Form 1File: form 1 ROSE VILA BY KS JUNE 24.pdf18 Jul 2025
Form 2File: form 2 ROSE VILA BY KS JUNE 24.pdf18 Jul 2025
Form 3File: Form 3 June 24.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory June 24.pdf18 Jul 2025
Form 1File: form 1 ROSE VILA BY KS SEPT 24.pdf18 Jul 2025
Form 2File: form 2 ROSE VILA BY KS SEP 24.pdf18 Jul 2025
Form 3File: Form 3 Sept 24.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Sept 24.pdf18 Jul 2025
Form 2File: form 2 ROSE VILA BY KS DEC 24.pdf18 Jul 2025
Form 3File: Form 3 Dec 24.pdf18 Jul 2025
Form 1File: form 1 ROSE VILA BY KS DEC 24.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventor Dec 24.pdf18 Jul 2025
Form 1File: form 1 ROSE VILA BY KS MAR 25.pdf18 Jul 2025
Form 2File: form 2 ROSE VILA BY KS March 25.pdf18 Jul 2025
Form 3File: Form 3 March 25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory March 25.pdf18 Jul 2025
Form 1File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf18 Jul 2025
Form 2File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf18 Jul 2025
Form 3File: 2 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Sept 23.pdf18 Jul 2025
Form 1File: Form 1.pdf18 Jul 2025
Form 2File: Form 2.pdf18 Jul 2025
Form 3File: 4 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory March 24.pdf18 Jul 2025
Form 1File: form-1 dec 23.pdf18 Jul 2025
Form 2File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf18 Jul 2025
Form 3File: 3 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Dec 23.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 sept 23.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-2 dec 23.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 march 24.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 sept 23.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 dec 23.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 march 24.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 KS 30 sept 23 udin signed.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 dec 23 udin signed.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 KS 31 march 24 udin signed.pdf26 Jul 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf4 Jul 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf4 Jul 2023
Details of encumbrances concerned to FinanceFile: GetUserDocumentFileContent (17).pdf3 Jul 2023
Details of encumbrances concerned to LegalFile: GetUserDocumentFileContent (17).pdf3 Jul 2023
Copy of the legal title reportFile: Copy of the legal title report (2).pdf14 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf14 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Keystone Annexure A .pdf12 Jun 2023
Proforma of Agreement for saleFile: AFS REV AS PER RERA.pdf1 Jun 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT FOR KS.pdf1 Jun 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal KS.pdf27 May 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal KS.pdf27 May 2023
Other - FinanceFile: KS FINANCE.pdf27 May 2023
Other - FinanceFile: KS FINANCE.pdf27 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ilovepdf_merged (3).pdf22 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 rv.pdf20 May 2023
Proforma of Allotment letterFile: allotment letter keystone.pdf5 May 2023
Declaration in FORM BFile: Keystone affidavit for Rera .pdf15 Apr 2023
Layout approvalFile: MYSCAN_20230414_0003_compressed.pdf14 Apr 2023
Building plan approvalFile: MYSCAN_20230414_0003_compressed.pdf14 Apr 2023
Building plan approvalFile: MYSCAN_20230414_0002_compressed.pdf14 Apr 2023
Building plan approvalFile: MYSCAN_20230414_0001_compressed.pdf14 Apr 2023
Building plan approvalFile: MYSCAN_20230414_0001_compressed.pdf14 Apr 2023
Copy of Layout Approval (in case of layout)File: MYSCAN_20230414_0003_compressed.pdf14 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230414_0003_compressed.pdf14 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230414_0002_compressed.pdf14 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230414_0001_compressed.pdf14 Apr 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
RELIANCE GOLDS NO 58 1 4 S NO 59 1 NEAR RELIANCE RESIDENCY PALE AMBERNATH EAST152OngoingFeb 2025Late, Feb 2028
RAJ INAAYAS NO 49 2 B AT AMBARNATH THANE 42150134CompletedDec 2023Dec 2023
SAI ENCLAVESURVEY NO 57 HISSA NO 1 AND 2 AT AMBERNATH THANE 421501103CompletedDec 2023Dec 2023
LOTUS PARKS NO 84 2 A PLOT NO 02 03 AT SHAHAPUR THANE 42160124CompletedDec 2022Aug 2021
Royal Flora-Phase ISURVEY NO 39 HISSA NO 3A P AND 3H P PLOT NO 2 AND 3 AT AMBERNATH THANE 421506271CompletedMay 2022Late, Nov 2022

How this compares with Thane

9%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROSE VILLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALE, AMBERNATH7,600+ in Thane

2 kmROSE VILLACompleted 107Lapsed / revoked 35Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 214 registered projects within 2 km.

Builder: KEYSTONE CREATION

KEYSTONE CREATION has 1 registration on MahaRERA, including ROSE VILLA. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ROSE VILLA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROSE VILLA?

The registered promoter entity is KEYSTONE CREATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROSE VILLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROSE VILLA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROSE VILLA?

The professionals named in the filing: Architect: RAVINDRA G. PAWAR; Engineer: RAVINDRA G. PAWAR; Engineer: HITESH VIJAY NIKAM; Chartered Accountant: VIKAS KAMRA & CO. CHARTERED ACCOUNTANTS; Chartered Accountant: Rahul Balu Bhadange; Chartered Accountant: Narendra Prajapati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROSE VILLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROSE VILLA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROSE VILLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.