Registration lapsed No litigation declared Residential / Group Housing project

ROSE NAGAR

By GAYASUDDIN RIYAZUDDIN KHAN

RG-MH-30152 · RERA P51700030263 · Last updated on MahaRERA portal: 2 Mar 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
6 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

ROSE NAGAR is a Residential / Group Housing project by GAYASUDDIN RIYAZUDDIN KHAN in Thane, Maharashtra, registered with MahaRERA as P51700030263 on 10 Aug 2021. Possession was promised by 30 Jun 2024 and is now 28 months past that date.

At a glance

Project

  • NameROSE NAGAR
  • TypeResidential / Group Housing
  • Location
    • KAUSA
    • MUMBRA
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700030263
  • ReraGenie IDRG-MH-30152

Builder

  • NameGAYASUDDIN RIYAZUDDIN KHAN
  • Entity typeIndividual
  • Other registrations6 more →
  • Completed3 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

28 months past promisethis monthRegisteredAug 2021PromisedJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Aug 2021
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C1NA80000
C2NA80000
BUNGLOWNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 2 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

C127%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C227%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGLOW0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered32
Open Space78
BuildingClosed/CoveredOpen SpaceTotal
C1112536
C2184967
BUNGLOW347

Land and ownership13

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,330 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
LandownerVillageDistrict
ALTAF HUSSAIN ISMAIL THIMMumbai CityMumbai City
IQBAL HUSSAIN JAMALUDDIN THIMMumbai CityMumbai City
RAFIQ HUSSAIN LATIF THIMMumbai CityMumbai City
MOHAMMED HUSSAIN JAMALUDDIN THIMMumbai CityMumbai City
FAROOKH HUSSAIN LATIF THIMMumbai CityMumbai City
ALLAUDDIN YAKUB TANWARMumbai CityMumbai City
MOHAMMED SALIM IDU LASHAKARIAMumbai CityMumbai City
MOHAMMED SALIM YASIN LASHAKARIAMumbai CityMumbai City
ABDUL RAUF ABDUL KARIM BARUDGARMumbai CityMumbai City
ABDUL AZIZ ABDUL KARIM BARUDGARMumbai CityMumbai City
MOHAMMED ISMAIL KHANMumbai CityMumbai City
AHMED HUSSAIN JAMALUDDIN THIMMumbai CityMumbai City
ANWAR YASIN TANWARMumbai CityMumbai City

Approvals and building plan

Permissible FSI7248.94
Proposed, not sanctioned7,249 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, RAVI CO-OP SOC AMRUT NAGAR MUMBRA THANE - 400612

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRIGHT ANGLE
EngineerSS CONS
Chartered AccountantA S SUTERWALA AND CO
Chartered AccountantSHABBAR & ASSOCIATES
PartnerRole in project
GAYASUDDIN RIYAZUDDIN KHAN-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jan 2024

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 22-23-Q3.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 22-23-Q4.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 23-24-Q1.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 23-24-Q2.pdf2 Mar 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance Legal.pdf1 Mar 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance Legal.pdf1 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QA Declaration FY 19-20.pdf1 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Declaration FY 20-21.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 21-22- Q4.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 22-23- Q1.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 22-23- Q2.pdf1 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Audit Declaration FY 17-18.pdf1 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Audit Declaration FY 18-19.pdf1 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Audit Declaration FY 19-20.pdf1 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Audit Declaration FY 20-21.pdf1 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Audit Report FY 22-23.pdf1 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf1 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf1 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement For Sale.pdf1 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf24 Feb 2024
Proforma of Agreement for saleFile: Sale Agreement.pdf24 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GRBD- Form 5.pdf8 Dec 2022
Layout approvalFile: Layout Upload.pdf3 Aug 2021
Building plan approvalFile: building C1.pdf3 Aug 2021
Building plan approvalFile: building C2.pdf3 Aug 2021
Building plan approvalFile: Building Bungalow.pdf3 Aug 2021
Copy of Layout Approval (in case of layout)File: Layout Upload.pdf3 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: building C1.pdf3 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: building C2.pdf3 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Bungalow.pdf3 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Upload.pdf3 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Upload.pdf3 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Upload.pdf3 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Upload.pdf3 Aug 2021
Proforma of Allotment letterFile: Allotment Letter.pdf3 Aug 2021
Proforma of Allotment letterFile: Sale Agreement.pdf3 Aug 2021
Copy of the legal title reportFile: Title Certificate Upload.pdf31 Jul 2021
Declaration about Commencement CertificateFile: Declaration CC.pdf26 Jul 2021
PAN CardFile: Pan Card.pdf23 Jun 2021
Details of encumbrancesFile: Non Encumbrance.pdf23 Jun 2021
Declaration in FORM BFile: Declaration Form B.pdf23 Jun 2021
OtherFile: 1 attachment.pdf23 Jun 2021
OtherFile: 2 attachment.pdf23 Jun 2021
OtherFile: 3 attachment.pdf23 Jun 2021
OtherFile: 4 attachment.pdf23 Jun 2021
OtherFile: 5 attachment.pdf23 Jun 2021
OtherFile: 6 attachment.pdf23 Jun 2021
OtherFile: 7 attachment.pdf23 Jun 2021
OtherFile: 8 attachment.pdf23 Jun 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MOUNTAIN VALLEYSURVEY NO 87-1 NEAR MEMON COLONY KHADI MACHINE ROAD MUMBRA THANE 4006123CompletedApr 2020Apr 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROSE NAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBRA7,600+ in Thane

2 kmROSE NAGARCompleted 16Lapsed / revoked 6Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: GAYASUDDIN RIYAZUDDIN KHAN

Gayasuddin Riyazuddin Khan has 7 registrations on MahaRERA, including Mountain Valley and UNIVERSE I PHASE I. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that ROSE NAGAR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ROSE NAGAR is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROSE NAGAR?

The registered promoter entity is GAYASUDDIN RIYAZUDDIN KHAN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROSE NAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROSE NAGAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROSE NAGAR?

The professionals named in the filing: Architect: RIGHT ANGLE; Engineer: SS CONS; Chartered Accountant: A S SUTERWALA AND CO; Chartered Accountant: SHABBAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROSE NAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROSE NAGAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROSE NAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.