Home / Browse projects / Mumbai Suburban, Maharashtra / ROSE BLOSSOM CHSL

Registered No litigation declared Residential / Group Housing project

ROSE BLOSSOM CHSL

By VINI DEVELOPERS

RG-MH-05363 · RERA P51800053800 · Last updated on MahaRERA portal: 25 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 4 months from the original
6 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
36 of 55Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

ROSE BLOSSOM CHSL is a Residential / Group Housing project by VINI DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053800 on 1 Dec 2023. Possession is promised by 1 Dec 2026. The completion date has moved by 4 months from the original filing. 19 of the 55 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameROSE BLOSSOM CHSL
  • TypeResidential / Group Housing
  • Location
    • NATWAR NAGAR
    • JOGESHWARI EAST
    • Mogra
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800053800
  • ReraGenie IDRG-MH-05363

Builder

  • NameVINI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAUFV4553F1ZN
  • PartnersPRITESH DAMJI SAVLA, Virja Realties Private Limited
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023First promiseAug 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Dec 2023
  • Promised completion1 Dec 2026
  • Revised completionRevised to 1 Dec 2026 (originally 1 Aug 2026)
  • Buildings2 building records
  • Documents filed77 files

Current status

35%19 of 55 units booked

Figures as on 25 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROSE BLOSSOM CHSL, Wing BNA101033033
Rose Blossom CHSL Wing ANA2216622

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

ROSE BLOSSOM CHSL, Wing B78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Rose Blossom CHSL Wing A77%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 25 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered31
BuildingClosed/CoveredTotal
ROSE BLOSSOM CHSL, Wing B3030
Rose Blossom CHSL Wing A11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area959 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Declared on9 Jun 2025
LandownerVillageDistrict
Rose Blossom CHSLMograMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2830.11
Proposed, not sanctioned1,893 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUNCITY THEATRE VILE PARLE EAST MUMBAI - 400057

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUB ARCHITECTS
EngineerSSPA CONSULTANT ENGINEERS
EngineerMOHAN MANEKAR
Chartered AccountantVivek Jayesh thar
Chartered AccountantAjay Jhanwar & Co
PartnerRole in project
VINI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51800053800/WarAug 2026 → Dec 2026

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Sep 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Sep 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2026

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: FULL CC ROSE BLOSSOM CHSL.pdf25 Sep 2026
Building plan approvalFile: bulding Approved Plan Final.pdf25 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf25 Sep 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Sep 2026
Withdrawal Update Form 3File: Form 3 signed..pdf25 Sep 2026
Form 2A (FY 2025-2026)File: form2A25-26.pdf21 Aug 2026
Withdrawal Update Form 1File: Form1.pdf24 Jun 2026
Withdrawal Update Form 2File: form2March 2026.pdf24 Jun 2026
Withdrawal Update Form 3File: SIGNED FORM 3 MAR 26.pdf24 Jun 2026
Withdrawal Update Form 1File: Form1 Final.pdf18 Apr 2026
Withdrawal Update Form 1File: Form1.pdf18 Apr 2026
Withdrawal Update Form 2File: FORM - 2 engineer certificate Rose Blossom Chsl 30-09-20251.pdf18 Apr 2026
Withdrawal Update Form 2File: Form2.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 September 2025 Rose Blossom.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf18 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A Rose Blossom CHSL March 2025.pdf6 Nov 2025
Form 1File: FORM 1 - ARCHITECT CERTIFICATE FOR June 2025 DIGI SIGN.pdf1 Oct 2025
Form 2File: Form2 (1).pdf1 Oct 2025
Form 3File: Form 3 (1).pdf1 Oct 2025
Disclosure of Sold and Booked InventoryFile: disclosure (1).pdf1 Oct 2025
Form 1File: FORM1.pdf31 Jul 2025
Form 2File: Form2.pdf31 Jul 2025
Form 3File: FORM 3.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sold unsold.pdf31 Jul 2025
Form 1File: FORM1.pdf21 Jul 2025
Form 2File: FORM 2.pdf21 Jul 2025
Form 3File: FORM 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: disclosure inventory.pdf21 Jul 2025
Form 1File: Form1.pdf23 Jun 2025
Form 2File: Form2.pdf23 Jun 2025
Form 3File: Form 3.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf23 Jun 2025
Form 1File: Form 1 Rose Blossom 30-06-2024.pdf12 Jun 2025
Form 2File: Form 2 Engineer Certificate Rose Blossom CHSL new.pdf12 Jun 2025
Form 3File: FORM 3 Signed.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: disclosure sold unsold.pdf12 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rose Blossom lFORM 1 - ARCHITECT CERTIFICATE 31-03-2024 DIG SIGNED.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rose Blossom 30-06-2024.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ROSE BLOSSOM CHSL 30-06-2024.pdf30 Nov 2024
Building plan approvalFile: Amende IOD Rose Blosom.pdf17 Oct 2024
Building plan approvalFile: Drawing (5)_compressed.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Amende IOD Rose Blosom.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing (5)_compressed.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Form 2.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - ROSE BLOSSOM CHSL.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY ROSE BLOSSOM.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: vini form 3 Dec23_compressed.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 vini March 2024_compressed.pdf12 Jul 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCMENT CERTIFICATE.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 F-1_c.pdf27 Oct 2023
Other - TechnicalFile: Highligh layout Plan F.pdf27 Oct 2023
Other - TechnicalFile: declaration of area.pdf27 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 2368801_FirstCC_signed (1).pdf25 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int.pdf11 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumberance to fin.pdf15 Sep 2023
Details of encumbrances concerned to FinanceFile: Encummberace Legal.pdf15 Sep 2023
Details of encumbrances concerned to LegalFile: Encumberance to fin.pdf15 Sep 2023
Details of encumbrances concerned to LegalFile: Encummberace Legal.pdf15 Sep 2023
Proforma of Agreement for saleFile: Agreement for sale -Rose Blossom.pdf15 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report for AFS F.pdf15 Sep 2023
Proforma of Allotment letterFile: Allotment Letter - Rose Blossom CHSL.pdf12 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form - 1 architect certificate ROSEBLOSSOM CHSL.pdf11 Aug 2023
Proforma of Agreement for saleFile: Agreement 1-18.pdf11 Aug 2023
Proforma of Agreement for saleFile: Agreement 19-36.pdf11 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SITE ENGINEER CERTIFICATE FOR RERA.pdf9 Aug 2023
Proforma of Allotment letterFile: Allotment Letter - Rose Blossom CHSL.pdf9 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.pdf9 Aug 2023
Declaration in FORM BFile: Form B_compressed.pdf7 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration - roseblossom.pdf7 Aug 2023
CERSAI detailsFile: LETTER OF UNDERTAKING CERSAi.pdf26 Jun 2023
Layout approvalFile: APRROVED IOD DRAWING.pdf4 Apr 2023
Building plan approvalFile: APPROVED IOD LETTER.pdf4 Apr 2023
PAN CardFile: Vini Developers partnership Pan Card.pdf4 Apr 2023
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf4 Apr 2023
Copy of Layout Approval (in case of layout)File: APRROVED IOD DRAWING.pdf4 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: APPROVED IOD LETTER.pdf4 Apr 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
RAMKUTIR CHSNATWAR NAGAR ROADNO .03 VILLAGE ISMALIA JOGESHWARI EAST14CompletedAug 2009Late, Nov 2013

How this compares with Mumbai Suburban

35%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROSE BLOSSOM CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI EAST6,700+ in Mumbai Suburban

2 kmROSE BLOSSOM CHSLCompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: VINI DEVELOPERS

VINI DEVELOPERS has 1 registration on MahaRERA, including ROSE BLOSSOM CHSL. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ROSE BLOSSOM CHSL is delayed beyond 1 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROSE BLOSSOM CHSL?

The registered promoter entity is VINI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAUFV4553F1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROSE BLOSSOM CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROSE BLOSSOM CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROSE BLOSSOM CHSL?

The professionals named in the filing: Architect: UB ARCHITECTS; Engineer: SSPA CONSULTANT ENGINEERS; Engineer: MOHAN MANEKAR; Chartered Accountant: Vivek Jayesh thar; Chartered Accountant: Ajay Jhanwar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROSE BLOSSOM CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROSE BLOSSOM CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROSE BLOSSOM CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.