ROHAN NIDITA PHASE 2

By Rohan & Atul Enterprises

RG-MH-19210 · RERA P52100078282 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
27 of 214Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

ROHAN NIDITA PHASE 2 is a Residential / Group Housing project by Rohan & Atul Enterprises in Pune, Maharashtra, registered with MahaRERA as P52100078282 on 4 Dec 2024. Possession is promised by 31 Dec 2028. 187 of the 214 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameROHAN NIDITA PHASE 2
  • TypeResidential / Group Housing
  • Location
    • -
    • HINJAWADI
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078282
  • ReraGenie IDRG-MH-19210

Builder

  • NameRohan & Atul Enterprises
  • Entity typeOthers
  • GSTIN27AAAAR4493F1ZE
  • Named personsRohan Housing Private Ltd, Hemraj Shankarlal Mundada, Kala Hemraj Mundada, Rahul Hemraj Mundada, Atul Hemraj Mundada
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed102 files

Current status

87%187 of 214 units booked
59.8%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C - WINGNA252282082
D - WINGNA25221320132

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

C - WING44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D - WING39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed432

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots432
Closed/Covered432
BuildingClosed/CoveredTotal
C - WING234234
D - WING198198

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,296 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Dec 2025

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI31907.93
Proposed, not sanctioned25,908 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APARTMENT SGROUND FLOOR,PLOT NO 3, CTS NO 870 BHANDARKAR ROAD PUNE MAHARASHTRA 411004
Estimated costRs 78.05 cr
Cost incurredRs 46.70 cr
Work done59.83%
BuildingWingEstimatedIncurred
D - WINGNARs 34.23 crRs 22.05 cr
C - WINGNARs 32.32 crRs 24.65 cr
-NARs 11.50 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkur Associates
EngineerJitendra Kumar Jain
EngineerMahesh Balurgi
EngineerPratik Deepak Bhatewara
Chartered AccountantKhandelwal Jain & Associates
Chartered AccountantGolesha & Company
PartnerRole in project
Rohan & Atul Enterprises-

Litigation declared1

CaseCourtStatus
390/2024CIVIL JUDGE SENIOR DIVISIONPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Rohan Nidita Phase 2.pdf20 Apr 2026
Withdrawal Update Form 2File: Rohan Nidita Phase 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Rohan Nidita Phase 2.pdf20 Apr 2026
Withdrawal Update Form 1File: Rohan Nidita Phase 2.pdf20 Jan 2026
Withdrawal Update Form 2File: Rohan Nidita Phase 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Rohan Nidita Phase 2.pdf20 Jan 2026
Withdrawal Update Form 1File: Rohan Nidita Phase 2.pdf18 Oct 2025
Withdrawal Update Form 2File: Rohan Nidita Phase 2.pdf18 Oct 2025
Withdrawal Update Form 3File: Rohan Nidita Phase 2.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Nidita Phase 2.pdf11 Sep 2025
Form 2A (FY 2024-2025)File: Rohan Nidita Phase 2.pdf24 Jul 2025
Withdrawal Update Form 1File: Rohan Nidita Phase 2.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Nidita Phase 2 June 25.pdf19 Jul 2025
Withdrawal Update Form 3File: Rohan Nidita Phase 2.pdf19 Jul 2025
Details of encumbrances concerned to FinanceFile: Bajaj Financial Encumbrance.pdf9 May 2025
Details of encumbrances concerned to LegalFile: Bajaj Financial Encumbrance.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rohan Nidita Phase 2.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rohan Nidita Phase 2.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rohan Nidita Phase 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Rohan Nidita Phase 2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Nidita Phase 2 Dec 24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Nidita Phase 2 Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Nidita Phase 2 Dec 24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inv Update Nidita Phase 2 Dec 24.pdf20 Jan 2025
CERSAI detailsFile: Declaration of Cersai Report.pdf30 Nov 2024
Copy of the legal title reportFile: Clarification of Ownership.pdf29 Nov 2024
CERSAI detailsFile: ilovepdf_merged (7).pdf29 Nov 2024
CERSAI detailsFile: H402CFC0932872 CERSAI_Search_Report_Security_Interest_Id_Based_Search_29_11_2024_13_34_50_29 Nov 2024
Other - LegalFile: 43-44-अ-1-प्लॉट-अ__हिंजवडी__मुळ्शी (1).pdf25 Nov 2024
Other - LegalFile: RHPL 43_44_अ_2_प्लॉट_ब.PDF25 Nov 2024
Other - LegalFile: RHPL_MOA_merged.pdf25 Nov 2024
Other - LegalFile: RERA declaration.pdf18 Nov 2024
Other - FinanceFile: 2 CERSAI details (1).pdf18 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other organizations Suhas Lunkad.pdf13 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other organizations Milind Lunkad.pdf13 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other organizations Deepak Bhatewara.pdf13 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification - ROHAN NIDITA PHASE 2.pdf11 Nov 2024
Layout approvalFile: Highlighted - Layout.pdf7 Nov 2024
Copy of the legal title reportFile: Revised TSR.pdf7 Nov 2024
Details of encumbrances concerned to FinanceFile: M Deed No 27151-2022 - 35 Crs.pdf7 Nov 2024
Details of encumbrances concerned to FinanceFile: M Deed No 5448-2024 - 45 Crs.pdf7 Nov 2024
Copy of Layout Approval (in case of layout)File: Highlighted - Layout.pdf7 Nov 2024
Proforma of Allotment letterFile: Proforma Allotment Letter (1).pdf7 Nov 2024
Declaration in FORM BFile: Form B Rohan and Atul Enterprises edited.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert_11zon.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert - Nidita Phase 2.pdf7 Nov 2024
Other - LegalFile: हिंजवडी_43_44_अ_6_Satbara.pdf7 Nov 2024
Other - LegalFile: हिंजवडी_43_44_अ_5_Satbara.pdf7 Nov 2024
Other - LegalFile: हिंजवडी_43_44_अ_4_Satbara.pdf7 Nov 2024
Other - LegalFile: हिंजवडी_43_44_अ_3_Satbara.pdf7 Nov 2024
Other - LegalFile: Rohan Atul Enterprises Part Deed_rotated.pdf7 Nov 2024
Other - LegalFile: हिंजवडी_43_44_अ_7_Satbara.pdf7 Nov 2024
Other - LegalFile: हिंजवडी_43_44_अ_8_Satbara.pdf7 Nov 2024
Other - LegalFile: ASHWIN LUNKAD AUTHORITY LETTER.pdf7 Nov 2024
CERSAI detailsFile: CERSAI REPORT 35CR.pdf7 Nov 2024
CERSAI detailsFile: Declaration for cersai 45 crs loan.pdf7 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Bank Account.pdf7 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation letter to proforma allotment letter.pdf7 Nov 2024
Details of encumbrances concerned to LegalFile: M Deed No 5448-2024 - 45 Crs.pdf7 Nov 2024
Details of encumbrances concerned to LegalFile: M Deed No 27151-2022 - 35 Crs.pdf7 Nov 2024
Other - TechnicalFile: Ann A - Declaration cum undertaking-output.pdf7 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation to AFS Nidita Phase 2 (1).pdf7 Nov 2024
Proforma of Agreement for saleFile: AFS Nidhita II RERA_revised.pdf7 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Bank Acc - Nidita Phase 2.pdf7 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Secured unsecured with CA declaration.pdf7 Nov 2024
Building plan approvalFile: Sheet No 20.pdf5 Nov 2024
Building plan approvalFile: Sheet No 19.pdf5 Nov 2024
Building plan approvalFile: Sheet No 18.pdf5 Nov 2024
Building plan approvalFile: Sheet No 17.pdf5 Nov 2024
Building plan approvalFile: Sheet No 16.pdf5 Nov 2024
Building plan approvalFile: Sheet No 15.pdf5 Nov 2024
Building plan approvalFile: Sheet No 14.pdf5 Nov 2024
Building plan approvalFile: Sheet No 13.pdf5 Nov 2024
Building plan approvalFile: Sheet No 12.pdf5 Nov 2024
Building plan approvalFile: Sheet No 11.pdf5 Nov 2024
Building plan approvalFile: Sheet No 02.pdf5 Nov 2024
Layout approvalFile: Sheet No 01.pdf5 Nov 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf5 Nov 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf5 Nov 2024
Copy of Layout Approval (in case of layout)File: Sheet No 01.pdf5 Nov 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Rohan IpsitaSurvey No 38 Sakhare Vasti Road Hinjewadi Pune 411057171CompletedSep 2023Jun 2022

How this compares with Pune

87%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROHAN NIDITA PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HINJAWADI13,700+ in Pune

2 kmROHAN NIDITA PHASE 2Completed 75Lapsed / revoked 32Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: Rohan & Atul Enterprises

Rohan & Atul Enterprises has 4 registrations on MahaRERA, including ROHAN IPSITA and Rohan Ananya. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ROHAN NIDITA PHASE 2 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROHAN NIDITA PHASE 2?

The registered promoter entity is Rohan & Atul Enterprises, an others as per the filing. Its GSTIN 27AAAAR4493F1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROHAN NIDITA PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROHAN NIDITA PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROHAN NIDITA PHASE 2?

The professionals named in the filing: Architect: Ankur Associates; Engineer: Jitendra Kumar Jain; Engineer: Mahesh Balurgi; Engineer: Pratik Deepak Bhatewara; Chartered Accountant: Khandelwal Jain & Associates; Chartered Accountant: Golesha & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROHAN NIDITA PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROHAN NIDITA PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROHAN NIDITA PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.