Home / Browse projects / Pune, Maharashtra / ROHAN HARITA PHASE 1

Registered No litigation declared Residential / Group Housing project

ROHAN HARITA PHASE 1

By ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED

RG-MH-83287 · RERA P52100052972 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 86.00 crore secured on the land, in favour of Aditya Birla Finance Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
17 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 95%
39 of 499Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 156 documents Report an error

ROHAN HARITA PHASE 1 is a Residential / Group Housing project by ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100052972 on 6 Oct 2023. Possession is promised by 31 Dec 2027. 460 of the 499 units on this registration are recorded sold or booked, and 17 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameROHAN HARITA PHASE 1
  • TypeResidential / Group Housing
  • Location
    • -
    • TATHAWADE
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052972
  • ReraGenie IDRG-MH-83287

Builder

  • NameROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202PN2001PTC016352
  • GSTIN27AABCR8171R1ZL
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsSANJAY KHUSHALCHAND LUNKAD, DEEPAK KACHARDAS BHATEWARA, MILIND KHUSHALCHAND LUNKAD, SUHAS KHUSHALCHAND LUNKAD
  • Other registrations27 more →
  • Completed15 of 28
  • Declared earlier projects15 →

Key dates

this monthRegisteredOct 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed156 files

Current status

92%460 of 499 units booked
53.0%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA32261140114
WING DNA38321600160
WING ENA25191060106
WING FNA32261190119

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

WING C48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING E46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING F46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed2018

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,018
Closed/Covered2,014
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
WING C5290529
WING D6140614
WING E3354339
WING F5360536

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,411 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Limited
Secured amountRs 86.00 crore
Declared on14 Mar 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI102063.94
Proposed, not sanctioned57,064 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1194/8, Ramchandra Sabhamandap, Ghole Road , Shivaji Nagar, Pune, Pune, Maharashtra, 411005
Estimated costRs 220.47 cr
Cost incurredRs 116.88 cr
Work done53.01%
BuildingWingEstimatedIncurred
WING DNARs 81.25 crRs 44.71 cr
WING CNARs 53.21 crRs 31.41 cr
WING FNARs 48.15 crRs 26.60 cr
WING ENARs 23.87 crRs 14.15 cr
-NARs 13.99 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s Ankur Associates
EngineerMr. Jitendra kumar Jain
EngineerMahesh Balurgi
EngineerPratik Deepak Bhatewara
Chartered AccountantMahendrakumar Golesha
Chartered AccountantKhandelwal Jain & Associates
PartnerRole in project
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600088Ram GawaliROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED23/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed156

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 156 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Rohan harita Phase 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Rohan Harita Phase 1.pdf20 Apr 2026
Withdrawal Update Form 3File: Rohan Harita Phase 1.pdf20 Apr 2026
Withdrawal Update Form 1File: Rohan Harita Phase 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Rohan Harita Phase 1.pdf20 Jan 2026
Withdrawal Update Form 3File: Rohan Harita Phase 1.pdf20 Jan 2026
Withdrawal Update Form 1File: Rohan Harita Phase 1.pdf18 Oct 2025
Withdrawal Update Form 2File: Rohan Harita Phase 1.pdf18 Oct 2025
Withdrawal Update Form 3File: Rohan Harita Phase 1.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Harita Phase 1.pdf11 Sep 2025
Form 2A (FY 2024-2025)File: Rohan Harita Phase 1.pdf24 Jul 2025
Withdrawal Update Form 1File: Rohan Harita Phase 1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Harita Phase 1 June 25.pdf19 Jul 2025
Withdrawal Update Form 3File: Rohan Harita Phase 1.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rohan Harita Phase 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rohan Harita Phase 1.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rohan Harita Phase 1.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Rohan Harita Phase 1.pdf19 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Harita Phase 1.pdf21 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Harita Phase 1.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Harita Phase 1 Dec 24 Revised.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Harita Phase 1 Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Harita Phase 1 Dec 24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inv Update Harita Ph 1 Dec 24.pdf20 Jan 2025
Layout approvalFile: Harita Sanction Plan final.pdf13 Dec 2024
Copy of Layout Approval (in case of layout)File: Harita Sanction Plan final.pdf13 Dec 2024
Declaration about Commencement CertificateFile: Declaration Rohan Harita Phase 1.pdf13 Dec 2024
Building plan approvalFile: 2 (2).pdf10 Dec 2024
Building plan approvalFile: 3.pdf10 Dec 2024
Building plan approvalFile: 4.pdf10 Dec 2024
Building plan approvalFile: 5 (1).pdf10 Dec 2024
Building plan approvalFile: 14.pdf10 Dec 2024
Building plan approvalFile: 15.pdf10 Dec 2024
Building plan approvalFile: 16.pdf10 Dec 2024
Building plan approvalFile: 17.pdf10 Dec 2024
Building plan approvalFile: 18.pdf10 Dec 2024
Building plan approvalFile: 19.pdf10 Dec 2024
Building plan approvalFile: 20.pdf10 Dec 2024
Building plan approvalFile: 21.pdf10 Dec 2024
Building plan approvalFile: 22.pdf10 Dec 2024
Building plan approvalFile: 23.pdf10 Dec 2024
Building plan approvalFile: 24.pdf10 Dec 2024
Building plan approvalFile: 25.pdf10 Dec 2024
Building plan approvalFile: 26.pdf10 Dec 2024
Building plan approvalFile: 27.pdf10 Dec 2024
Building plan approvalFile: 28.pdf10 Dec 2024
Building plan approvalFile: 29.pdf10 Dec 2024
Building plan approvalFile: 30.pdf10 Dec 2024
Building plan approvalFile: 31.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Rohan Harita final.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 22.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 19.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 23.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 24.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 25.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 26.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 27.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 28.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 29.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 30.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 31.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 21.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 20.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 18.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 17.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 16.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 15.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 14.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 (1).pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 (2).pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Harita.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rohan Harita.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Harita.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Harita.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Harita Phase 1 FY 23-24.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rohan Harita Jun 24.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rohan Harita.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Rohan Harita.pdf20 Jul 2024

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ROHAN LEHER IIIS NO 60-1 60-2P 60-2-1 60-3P BANER Pune-411045206CompletedJun 2021Jun 2021
ROHAN LEHER 2 WING ASNo 53-5 53-6 P 54-1 P 54-12 Baner Pune 41104544CompletedSep 2019Sep 2019
ROHAN ABHILASHA BUILDING FGAT NO 1458 1459 1460 P 1461 1462 1463 1464 1465 WAGHOLI Pune- 412207330CompletedJun 2019Jun 2019
ROHAN LEHER 2 WING B C DESNo 53-5 53-6 P 54-1 P 54-12 Baner Pune 41104537CompletedSep 2018Sep 2018
ROHAN KRITIKA WINGS A CCTS 538 A PARVATI PUNE CITY 411005103CompletedSep 2018Late, Dec 2018
ROHAN ABHILASHA BUILDING CCTS 538 A PARVATI Pune103CompletedSep 2018Sep 2018
ROHAN ABHILASHA BUILDING EGAT NO 1458 1459 1460 P 1461 1462 1463 1464 1465 WAGHOLI Pune- 412207330CompletedJun 2018Jun 2018
ROHAN ABHILASHA BUILDING AGAT NO 1458 1459 1460P 1461 1462 1463 1464 1465 WAGHOLI Pune-41220784CompletedNov 2017Nov 2017
ROHAN LEHER 2 WING F G H I JSNO 53-5 53-6P 54-12 54-1P BANER PUNE-41104550CompletedJun 2017Jun 2017
ROHAN ISHAN WING A 5 TO 11 FLOORSNO 9-2 9-3 BAVDHAN BK TALUKA MULSHI PUNE 41102141CompletedJun 2017Jun 2017

How this compares with Pune

92%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROHAN HARITA PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TATHAWADE13,700+ in Pune

2 kmROHAN HARITA PHASE 1Completed 105Lapsed / revoked 32Other 107Dot size: filed unitsN

Filed coordinates, straight-line distance. 244 registered projects within 2 km.

Builder: ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED

ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED has 28 registrations on MahaRERA, including ROHAN KRITIKA WINGS A C and ROHAN LEHER 2 WING A. Its filings disclose 15 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ROHAN HARITA PHASE 1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROHAN HARITA PHASE 1?

The registered promoter entity is ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202PN2001PTC016352 and GSTIN 27AABCR8171R1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROHAN HARITA PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ROHAN HARITA PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ROHAN HARITA PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROHAN HARITA PHASE 1?

The professionals named in the filing: Architect: M/s Ankur Associates; Engineer: Mr. Jitendra kumar Jain; Engineer: Mahesh Balurgi; Engineer: Pratik Deepak Bhatewara; Chartered Accountant: Mahendrakumar Golesha; Chartered Accountant: Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROHAN HARITA PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROHAN HARITA PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROHAN HARITA PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.