Home / Browse projects / Pune, Maharashtra / RKL Anand ph2 A building
RKL Anand ph2 A building
RG-MH-89938 · RERA P52100048356 · Last updated on MahaRERA portal: 24 Jun 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RKL Anand ph2 A building is a Others project by LUNKAD GRUH NIRMAN COMPANY in Pune, Maharashtra, registered with MahaRERA as P52100048356 on 27 Dec 2022. The registration is recorded completed; possession was promised by 30 Dec 2025.
At a glance
Project
- NameRKL Anand ph2 A building
- TypeOthers
- Location
- Mumbai Banglore Highway
- Tathawade
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411033
- Pincode411033
- RERA no.P52100048356
- ReraGenie IDRG-MH-89938
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Dec 2022
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed79 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rkl Anand ph 2 A building | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Rkl Anand ph 2 A building: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed73
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUBH ARCHITECT |
| Engineer | SUNIL MUTALIK AND ASS |
| Chartered Accountant | Prashant Mane and ass |
| Chartered Accountant | S S Jain & Company |
| Partner | Role in project |
|---|---|
| LUNKAD GRUH NIRMAN COMPANY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Apr 2025
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Rkl Anand 2 society registration.pdf | 24 Jun 2025 |
| Other - TechnicalFile: Basement parking tatwade ph ll-Model (3 files merged).pdf | 24 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RKL Anand Phase 2.pdf | 26 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 rkl anand phase 2.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RKL ANAnd Phase 2.pdf | 26 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RKL ANAND PHASE 2 COMPLETION.pdf | 26 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: 2 Deviation Report with respect to DRAFT AGREEMENT.pdf | 25 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: Deviaton RKL ANAND 2.pdf | 23 Jan 2025 |
| Proforma of Agreement for saleFile: Agreement draft_RKL ANAND PH 2.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 RKL Anand Phase II.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - converted.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: RKL ANAND PH 2_SALE REPORT.pdf | 18 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Rkl Anand ph 2 Dec 24.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKL Anand Ph 2.pdf | 13 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RKL Anand Ph 2.pdf | 13 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 RKL Anand Ph 2.pdf | 13 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sept 24 rkl anand 2.pdf | 2 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 rkl anand 2 sept 24.pdf | 2 Nov 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: ph2.pdf | 1 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed 126.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed 126.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed 126.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Rkl Anand ph 2 MARCH 24 (1).pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed RKL Anand Ph II.PDF | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed RKL Anand Ph II.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed RKL Anand Ph II.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Rkl Anand ph 2 MARCH 24.pdf | 19 Apr 2024 |
| Proforma of Agreement for saleFile: RKL ANAND 2 DRAFT AGREEMENT.pdf | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed (1).pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed (1).pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed (1).pdf | 19 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Rkl Anand ph 2 Dec 23.pdf | 5 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 21 dec 23.pdf | 21 Dec 2023 |
| Other - TechnicalFile: Lunkad Gruhnirman Company COMM NOV 23.pdf | 1 Dec 2023 |
| Declaration about Commencement CertificateFile: Declaration certificate_RKL ANAND PH 2.pdf | 23 Nov 2023 |
| Proforma of Agreement for saleFile: RKL ANAND PH II SOURCE AGREEMENT (1).pdf | 23 Nov 2023 |
| Layout approvalFile: LAYOUT.pdf | 17 Nov 2023 |
| Building plan approvalFile: TYPICAL FLOOR PLAN.pdf | 17 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: TYPICAL FLOOR PLAN.pdf | 17 Nov 2023 |
| Declaration about Commencement CertificateFile: COMMENCEMENT 8 NOV 23.pdf | 17 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (1).pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (1).pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 LGNC_Phase II_ 2022-23.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD (2).pdf | 7 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RKL ANAND PH 2 June 23 (1).pdf | 3 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Rkl Anand ph 2 June 23.pdf | 3 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RKL ANAND PH 2 June 23 (2).pdf | 3 Jul 2023 |
| Declaration about Commencement CertificateFile: DECLARATION abt cc 126,127.pdf | 10 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 RKL ANAND PH 2.pdf | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKL Anand Phase II 17 FEB 2023.pdf | 9 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Rkl Anand disclosure of interest.pdf | 3 Mar 2023 |
| Layout approvalFile: Layout plan.pdf | 24 Jan 2023 |
| Building plan approvalFile: Floor plan.pdf | 24 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Layout plan.pdf | 24 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Floor plan.pdf | 24 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 0 RKL ANAND PH II COMENCEMENT.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A 21-22 Rkl Anand ph 1 (1).pdf | 18 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A for seperate bank Account.pdf | 29 Nov 2022 |
| Proforma of Agreement for saleFile: RKL ANANAD phase II DRAFT AGREEMENT 7 Nov 22.pdf | 7 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Non Encumbrance (3).pdf | 11 Oct 2022 |
| Proforma of Allotment letterFile: Allotment letter and agreement 11 oct.pdf | 11 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: DRAFT AGREE DEVIATION REPORT 11 oct.pdf | 11 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf | 3 Oct 2022 |
| CERSAI detailsFile: CERSAI Latest.pdf | 10 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: signed allotment deviation report.pdf | 23 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrance Certificate Finance.pdf | 17 Aug 2022 |
| Copy of the legal title reportFile: RKL ANAND PH 2 SEARCH REPORT upload.pdf | 16 Aug 2022 |
| Copy of the legal title reportFile: FORM A LEGAL TITLE REPORT_compressed.pdf | 10 Jun 2022 |
| Layout approvalFile: lAYOUT_compressed.pdf | 20 May 2022 |
| Building plan approvalFile: fLOOR PLAN_compressed.pdf | 20 May 2022 |
| PAN CardFile: 1 PAN Card (1).pdf | 20 May 2022 |
| Copy of Layout Approval (in case of layout)File: lAYOUT_compressed.pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: fLOOR PLAN_compressed.pdf | 20 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: R K L ANAND P-II COMMENCEMENT_compressed.pdf | 20 May 2022 |
| Declaration about Commencement CertificateFile: decl cc.pdf | 20 May 2022 |
| Declaration in FORM BFile: RKL ANAND PH II FORM B (1)_compressed.pdf | 20 May 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Amrutdhara C AND D1-D2 | 123 Near sai mandir wadmukhwadi pcmc | 312 | Completed | Dec 2017 | Sep 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
Keep RKL Anand ph2 A building on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tathawade13,700+ in Pune
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: LUNKAD GRUH NIRMAN COMPANY
Lunkad Gruh Nirman Company has 5 registrations on MahaRERA, including Amrutdhara C and D1-D2 and AMRUTDHARA B BUILDING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if RKL Anand ph2 A building is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RKL Anand ph2 A building?
The registered promoter entity is LUNKAD GRUH NIRMAN COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RKL Anand ph2 A building?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RKL Anand ph2 A building?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RKL Anand ph2 A building?
The professionals named in the filing: Architect: SUBH ARCHITECT; Engineer: SUNIL MUTALIK AND ASS; Chartered Accountant: Prashant Mane and ass; Chartered Accountant: S S Jain & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RKL Anand ph2 A building?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback