Home / Browse projects / Pune, Maharashtra / RKL Anand ph1

Completed No litigation declared Others project

RKL Anand ph1

By LUNKAD GRUH NIRMAN COMPANY

RG-MH-15216 · RERA P52100023493 · Last updated on MahaRERA portal: 1 Aug 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 0%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

RKL Anand ph1 is a Others project by LUNKAD GRUH NIRMAN COMPANY in Pune, Maharashtra, registered with MahaRERA as P52100023493 on 18 Dec 2019. The registration is recorded completed; possession was promised by 30 Jun 2023.

At a glance

Project

  • NameRKL Anand ph1
  • TypeOthers
  • Location
    • Mumbai Banglore Highway
    • Tathawade
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023493
  • ReraGenie IDRG-MH-15216

Builder

  • NameLUNKAD GRUH NIRMAN COMPANY
  • Entity typePartnership
  • PartnersSANJAY DHANRAJ GATAGAT, AKASH RAVINDRA LUNKAD
  • Other registrations4 more →
  • Completed5 of 5
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2019PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Dec 2019
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RKL ANAND PH 1NA130000
CLUB HOUSENA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.

RKL ANAND PH 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CLUB HOUSE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered40
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,563 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5501.17
Proposed, not sanctioned4,510 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDange chowk Thergoan Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKhire Bhide ass
EngineerGaurav Katariya
Chartered AccountantAMP asso
PartnerRole in project
LUNKAD GRUH NIRMAN COMPANY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Nov 2022

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Home Buyer /Allottee Grievance Redressal CellFile: ph 1.pdf1 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 LGNC_Phase I_ 2022-23.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RKL ANAND PH I.pdf28 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: society rkl anand ph 1.pdf7 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 RKL ANAND PH 1 (1).pdf31 Jan 2023
Architect’s Certificate on Completion of Project (Form 4)File: RKL Anand ph 1 form 4 New.pdf17 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement JUNE 21.pdf12 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 5 RKL Anand Phase I 21 22.pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 RKL Anand Phase I 21 22.pdf12 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC.pdf15 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate (1).pdf23 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 126 form 1 DEC 2021 - Copy.pdf7 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QAC FORM 2A Dec 21.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RKL Anand Phase 1 FORM 3 DEC 21_compressed.pdf7 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 126 form 1 DEC 2021.pdf3 Jan 2022
Proforma of Allotment letterFile: RKL ANANAD Agreement.pdf13 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form - 5 - Anand 21.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QAC FORM 2A sep 21.pdf25 Sep 2021
Disclosure of sold/ booked inventoryFile: RKL Anand Phase I DISCLOSURE OF SOLD BOOKED INVENTORY (2).pdf17 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 126 form 2 (ph 1 ) Augst 21.pdf4 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SEP 21.pdf4 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aug 21 FORM-1.pdf28 Aug 2021
Building plan approvalFile: 1 2 4.pdf12 Aug 2021
Building plan approvalFile: 3 5 9.pdf12 Aug 2021
Building plan approvalFile: 6 8.pdf12 Aug 2021
Building plan approvalFile: 7.pdf12 Aug 2021
Building plan approvalFile: 10.pdf12 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 1 2 4.pdf12 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 3 5 9.pdf12 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 6 8.pdf12 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf12 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf12 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - RKL Anand -1920.pdf12 Aug 2021
Declaration about Commencement CertificateFile: RKL ANAND Format D.pdf16 Jul 2021
Disclosure of sold/ booked inventoryFile: RKL Anand Phase I DISCLOSURE OF SOLD BOOKED INVENTORY.pdf1 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QAC FORM 2A March 2021.pdf22 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 126 QAC FORM 2A Dec 2020 - Copy.pdf30 Dec 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QAC FORM 2A sep 2020 - Copy.pdf22 Sep 2020
Building plan approvalFile: 1st 2nd 4th floor.pdf12 Sep 2020
Building plan approvalFile: 3rd 5th 9th.pdf12 Sep 2020
Building plan approvalFile: 6th 8th 7th.pdf12 Sep 2020
Building plan approvalFile: 10th.pdf12 Sep 2020
Layout approvalFile: layout aug 2020 (1).pdf12 Sep 2020
Copy of Layout Approval (in case of layout)File: layout aug 2020 (1).pdf12 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: 1st 2nd 4th floor.pdf12 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: 3rd 5th 9th.pdf12 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: 6th 8th 7th.pdf12 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: 10th.pdf12 Sep 2020
Proforma of Allotment letterFile: rkl anand shop AGREEMENT DRAFT 2 sep 2020.pdf2 Sep 2020
Proforma of Allotment letterFile: Draft - RKL - Anand 1.pdf9 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March QAC FORM 2A RERA FORMATE for A 123 March 2020.pdf1 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: rkl anand form 2 A dec 2019.pdf14 Feb 2020
Details of encumbrancesFile: Non Encumbrance Certificate.pdf11 Dec 2019
Copy of the legal title reportFile: Rkl Anand phase I title certificate_Page 01 (2).pdf27 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect letter RKL anand.pdf18 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 126 form 2 (ph 1 ).pdf18 Nov 2019
Building plan approvalFile: floor plan 3.pdf14 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: floor plan 3.pdf14 Nov 2019
Proforma of Allotment letterFile: Allotment letter (2 files merged).pdf14 Nov 2019
Building plan approvalFile: floor plan 1.pdf13 Nov 2019
Layout approvalFile: layout.pdf13 Nov 2019
PAN CardFile: LGNC-PAN.pdf13 Nov 2019
Details of encumbrancesFile: non Enc Certificate.pdf13 Nov 2019
Copy of Layout Approval (in case of layout)File: layout.pdf13 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: floor plan 1.pdf13 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: commencement.pdf13 Nov 2019
Declaration in FORM BFile: Form B New.pdf13 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - RKL Anand- 251019.pdf13 Nov 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Amrutdhara C AND D1-D2123 Near sai mandir wadmukhwadi pcmc312CompletedDec 2017Sep 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RKL Anand ph1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tathawade13,700+ in Pune

2 kmRKL Anand ph1Completed 115Lapsed / revoked 117Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: LUNKAD GRUH NIRMAN COMPANY

Lunkad Gruh Nirman Company has 5 registrations on MahaRERA, including Amrutdhara C and D1-D2 and AMRUTDHARA B BUILDING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RKL Anand ph1 is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RKL Anand ph1?

The registered promoter entity is LUNKAD GRUH NIRMAN COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RKL Anand ph1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RKL Anand ph1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RKL Anand ph1?

The professionals named in the filing: Architect: Khire Bhide ass; Engineer: Gaurav Katariya; Chartered Accountant: AMP asso. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RKL Anand ph1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RKL Anand ph1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RKL Anand ph1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.