ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Rivera Residence Phase 1

Registered No litigation declared Residential / Group Housing project

Rivera Residence Phase 1

By M/s High Yield Fortune Pvt Ltd

RG-MH-31295 · RERA P52100079629 · Last updated on MahaRERA portal: 7 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
24 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Rivera Residence Phase 1 is a Residential / Group Housing project by M/s High Yield Fortune Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100079629 on 17 Mar 2025. Possession is promised by 31 Dec 2029. 0 of the 24 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameRivera Residence Phase 1
  • TypeResidential / Group Housing
  • Location
    • Ravade
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079629
  • ReraGenie IDRG-MH-31295

Builder

  • NameM/s High Yield Fortune Pvt Ltd
  • Entity typeCompany
  • DirectorRupesh Vilas Chavan
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Mar 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Current status

0%0 of 24 units booked
5.2%Work done, per cost certificate

Figures as on 7 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building - 05 JNA3324024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Building - 05 J: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities19

As on 7 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Swimming poolYes0%
ParkingYes0%
Entrance GateYes26%
Compound WallYes100%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Open Space60

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,514 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 May 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI1464.81
Proposed, not sanctioned1,465 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND AND MEZZANINE FLOOR SHOWROOM NO A B WING KPCT MALL FATIMA NAGAR WANOWRIE PUNE 411040
Estimated costRs 12.47 cr
Cost incurredRs 65.35 lakh
Work done5.24%
BuildingWingEstimatedIncurred
-NARs 6.42 crRs 65.35 lakh
Building - 05 JNARs 6.05 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEpic Design Pvt Ltd
ArchitectEmpiric Space Vishal Vijay Jadhav
EngineerBhausaheb Dhondiba Arote
Chartered AccountantKunal Joshi
PartnerRole in project
M/s High Yield Fortune Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Rivera Q1.pdf7 Oct 2025
Withdrawal Update Form 2File: Form 2 Rivera Q1.pdf7 Oct 2025
Withdrawal Update Form 3File: Form 3 Rivera Q1 FY 25-26_Signed.pdf7 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4 24-25_Rivera Residence I (2).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Rivera.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of SoldUnsold unit.pdf19 Apr 2025
Other - LegalFile: Declaration regarding Land details.pdf19 Feb 2025
Other - LegalFile: Declaration about Legal Title Report.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rivera Residence Phase 1 edited.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Certificate of Project Engineer Edited.pdf17 Feb 2025
Other - LegalFile: Sale Deed Page 62-71_compressed.pdf17 Feb 2025
Other - LegalFile: Sale Deed Page 52-61_compressed.pdf17 Feb 2025
Other - LegalFile: Sale Deed Page 42-51_compressed.pdf17 Feb 2025
Other - LegalFile: Sale Deed Page 22-31_compressed.pdf17 Feb 2025
Other - LegalFile: Sale Deed Page 12-21_compressed.pdf17 Feb 2025
Other - LegalFile: Sale Deed Page 1-11_compressed (1).pdf17 Feb 2025
Other - LegalFile: रावडे_376_Satbara (2).pdf17 Feb 2025
Other - LegalFile: Sale Deed Page 32-41_compressed.pdf17 Feb 2025
Other - TechnicalFile: CC Verification SS.pdf17 Feb 2025
Other - TechnicalFile: Declaration regarding Land details.pdf17 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Declaration about Designated Banks.pdf17 Feb 2025
Declaration in FORM BFile: Form B - Affidavit cum Declaration1_compressed.pdf14 Feb 2025
Declaration about Commencement CertificateFile: Format D - Declaration of Commencement Certificate.pdf14 Feb 2025
Copy of the legal title reportFile: Legal Title Report merged.pdf4 Feb 2025
Proforma of Agreement for saleFile: AFS as per O60 O63.pdf4 Feb 2025
Layout approvalFile: 01-27 Foresta - Site Layout - Highlighted_compressed.pdf3 Feb 2025
Building plan approvalFile: 01-27 Foresta - Site Layout - Highlighted_compressed.pdf3 Feb 2025
Building plan approvalFile: 02-27 Foresta - Amalgamation_compressed.pdf3 Feb 2025
Building plan approvalFile: 03-27 Foresta - Contour Survey Parking Layout.pdf3 Feb 2025
Building plan approvalFile: 04-27 Foresta - Site Section Key Plan.pdf3 Feb 2025
Building plan approvalFile: 20-27 Foresta - Building 5(J Block).pdf3 Feb 2025
Building plan approvalFile: 21-27 Foresta - Building 5(J Block).pdf3 Feb 2025
Details of encumbrances concerned to FinanceFile: Encumbraances (Legal Financial).pdf3 Feb 2025
Copy of Layout Approval (in case of layout)File: 01-27 Foresta - Site Layout - Highlighted_compressed.pdf3 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 02-27 Foresta - Amalgamation_compressed.pdf3 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 21-27 Foresta - Building 5(J Block).pdf3 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 20-27 Foresta - Building 5(J Block).pdf3 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 04-27 Foresta - Site Section Key Plan.pdf3 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 03-27 Foresta - Contour Survey Parking Layout.pdf3 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 01-27 Foresta - Site Layout - Highlighted_compressed.pdf3 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Declaration about RERA Designated Bank Acc.pdf3 Feb 2025
Details of encumbrances concerned to LegalFile: Encumbraances (Legal Financial).pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Cliff Cherry_FY 24-25.pdf27 Jan 2025
Other - TechnicalFile: O50(One plot one registration)Annexure A (1).pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Jyotiprasad Chavan Disclosure OREO.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Mugdha Chavan Disclosure OREO.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Rupesh Chavan Disclosure OREO.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Vishal Chavan Disclosure OREO.pdf24 Jan 2025
CERSAI detailsFile: Declaration for CERSAI.pdf23 Jan 2025
Other - TechnicalFile: Declaration regarding Land details.pdf23 Jan 2025
Proforma of Allotment letterFile: Allotment letter (final).pdf22 Jan 2025
PAN CardFile: High Yield Fortune Pvt Ltd.pdf21 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation report of Allotment letter Edited.pdf21 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report of Agreement Format editeddd.pdf21 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance.pdf21 Jan 2025

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Foresta Phase IGat No. 377 379 38 Ravade Near Mahindra United World Paud Bhadas Road Mulshi Pune 41210860CompletedSep 2024Sep 2024
ELITE PH-IIBORIANDI-CompletedJan 2019Jan 2019
Wai woodsGat No 618 635 636 207 warkhadi wadiTal Wai Dist Satara-CompletedFeb 2018Feb 2018
Golden AcersGat no 44 Borate Vasti Tal Daund Dist Pune-CompletedAug 2016Aug 2016
EliteGat No 407 Boribhadak Tal Daund Dist Pune-CompletedJul 2015Jul 2015

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rivera Residence Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravade13,700+ in Pune

2 kmRivera Residence Phase 1Completed 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: M/s High Yield Fortune Pvt Ltd

M/s High Yield Fortune Pvt Ltd has 1 registration on MahaRERA, including Rivera Residence Phase 1. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Rivera Residence Phase 1 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rivera Residence Phase 1?

The registered promoter entity is M/s High Yield Fortune Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rivera Residence Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rivera Residence Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rivera Residence Phase 1?

The professionals named in the filing: Architect: Epic Design Pvt Ltd; Architect: Empiric Space Vishal Vijay Jadhav; Engineer: Bhausaheb Dhondiba Arote; Chartered Accountant: Kunal Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rivera Residence Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rivera Residence Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rivera Residence Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.