RIVER NEST BUILDING A WING D AND E
By Amarnath Group of Companies
RG-MH-36761 · RERA PR1260002602451 · Last updated on MahaRERA portal: 30 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Allotment letter deviates from the model form
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RIVER NEST BUILDING A WING D AND E is a Residential / Group Housing project by Amarnath Group of Companies in Pune, Maharashtra, registered with MahaRERA as PR1260002602451 on 19 Oct 2026. Possession is promised by 31 Dec 2029. 0 of the 95 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.
At a glance
Project
- NameRIVER NEST BUILDING A WING D AND E
- TypeResidential / Group Housing
- Location
- Charholi BK
- Charholi Budruk
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1260002602451
- ReraGenie IDRG-MH-36761
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Oct 2026
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings2 building records
- Documents filed22 files
Current status
Figures as on 30 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| River Nest A Building Wing D and E | Wing D | 8 | 5 | 50 | 0 | 50 |
| River Nest A Building Wing D and E | Wing E | 8 | 5 | 45 | 0 | 45 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 30 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
River Nest A Building Wing D and E · wing Wing D9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
River Nest A Building Wing D and E · wing Wing E9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 0% |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | Not applicable |
Parking filed163
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| River Nest A Building Wing D and E Wing D | 85 | 85 |
| River Nest A Building Wing D and E Wing E | 78 | 78 |
Land and ownership86
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sumant Ramrav Garud | Charoli | Pune |
| Subhadra Govind Bhujabal | Charoli | Pune |
| Pintu Sundardas Mirani | Charoli | Pune |
| Bajirao Sopan Dabhade | Charoli | Pune |
| Sanjay Bajirao Dabhade | Charoli | Pune |
| Rajendra Sanjay Dabhade | Charoli | Pune |
| Aniket Sanjay Dabhade | Charoli | Pune |
| Mukunda Bajirao Dabhade | Charoli | Pune |
| Yogita Mukund Dabhade | Charoli | Pune |
| Sadhana Dagadu Banage | Charoli | Pune |
| Indubai Baban Dabhade | Charoli | Pune |
| Ramdas Baban Dabhade | Charoli | Pune |
| Surekha Ramdas Dabhade | Charoli | Pune |
| Tushar Ramdas Dabhade | Charoli | Pune |
| Rohan Ramdas Dabhade | Charoli | Pune |
| Shyam Baban Dabhade | Charoli | Pune |
| Punam Shyam Dabhade | Charoli | Pune |
| Prachi Shyam Dabhade Through Shyam Baban Dabhade | Charoli | Pune |
| Sakshi Shyam Dabhade Through Shyam Baban Dabhade | Charoli | Pune |
| Anita Shankar Dabhade | Charoli | Pune |
| Laxmibai Ankush Ghotakule | Charholi Budruk | Pune |
| Abhishek Shankar Dabhade | Charholi Budruk | Pune |
| Aadesh Shankar Dabhade Through Shankar Kashinala Dabhade | Charholi Budruk | Pune |
| Akshada Shankar Dabhade Through Shankar Kashinala Dabhade | Charholi Budruk | Pune |
| Shankar Namdev Dabhade | Charholi Budruk | Pune |
| Parubai Shankar Dabhade | Charholi Budruk | Pune |
| santosh Shankar Dabhade | Charoli | Pune |
| Sonali Santosh Dabhade | Charholi Budruk | Pune |
| Vishal Shankar Dabhade | Charholi Budruk | Pune |
| Neha Vishal Dabhade | Charholi Budruk | Pune |
| Shravya Vishal Dabhade Through Vishal Shankar Dabhade | Charholi Budruk | Pune |
| Jayshri Ramdas Tapkir Alias Jayshri Ramdas Dabhade | Charholi Budruk | Pune |
| Shravan Santosh Dabhade Through Santosh Shankar Dabhade | Charholi Budruk | Pune |
| Mangal Vishnu Dabhade | Charholi Budruk | Pune |
| Rahul Vishnu Dabhade | Charholi Budruk | Pune |
| Priyanka Rahul Dabhade | Charholi Budruk | Pune |
| Hindavi Rahul dabhade Through Rahul Vishnu Dabhade | Charholi Budruk | Pune |
| Kiran Vishnu Dabhade | Charoli | Pune |
| Tanvi Rahul Dabhade Through Rahul Vishnu Dabhade | Charoli | Pune |
| Maruti Namdev Dabhade | Charoli | Pune |
| Rohini Maruti Dabhade | Charoli | Pune |
| Sagar Maruti Dabhade | Charoli | Pune |
| Shweta Sagar Dabhade | Charoli | Pune |
| Umesh Maruti Dabhade | Charoli | Pune |
| Monika Umesh Dabhade | Charoli | Pune |
| Rudransh Sagar Dabhade Through Sagar Maruti Dabhade | Charoli | Pune |
| Shivanya Umesh Dabhade Through Monika Umesh Dabhade | Charoli | Pune |
| Yamuna Gulab Dabhade | Charoli | Pune |
| Satish Gulab Dabhade | Charoli | Pune |
| Shital Santosh Khengre | Charoli | Pune |
| Rupali Shyam Dabhade | Charoli | Pune |
| Narmada Kashinath Dabhade | Charoli | Pune |
| Shankar Kashinath Dabhade | Charoli | Pune |
| Kavita Pandurang Aavhale | Charoli | Pune |
| Narayan Shankar Dabhade | Charoli | Pune |
| Vagheshwar Dattu Alias Dattatray Dabhade | Charoli | Pune |
| Jayshri Vagheshwar Dabhade | Charoli | Pune |
| Nisha Vagheshwar Dabhade | Charoli | Pune |
| Sangram Vagheshwar Dabhade | Charoli | Pune |
| Hirabai Popat Thorve | Charoli | Pune |
| Prabhavati Pandharinath Pacharne | Charoli | Pune |
| Parubai Arjun Thorve | Charoli | Pune |
| Shashikala Ramdas Tapkir | Charoli | Pune |
| Malan Arjun Thorve | Charoli | Pune |
| Mira Jayram Jadhav | Charoli | Pune |
| Usha Vasant Pabale | Charoli | Pune |
| Shantaram Nathu Dabhade | Charoli | Pune |
| Sangita Shantaram Dabhade | Charoli | Pune |
| Saurabh Shantaram Dabhade | Charoli | Pune |
| Pradnya Shantaram Dabhade | Charoli | Pune |
| Taramati Bhausaheb Dabhade | Charoli | Pune |
| Rohit Bhausaheb Dabhade | Charoli | Pune |
| Akshay Bhausaheb Dabhade | Charoli | Pune |
| Prajkta Mahadev Thorve | Charoli | Pune |
| Arati Ganesh Shivalakar | Charoli | Pune |
| Pooja Rushikesh Tambe | Charoli | Pune |
| Anjana Balasaheb Dabhade | Charoli | Pune |
| Ganesh Balasaheb Dabhade | Charoli | Pune |
| Shobha Ganesh Dabhade | Charoli | Pune |
| Sidhhant Ganesh Dabhade Through Ganesh Balasaheb Dabhade | Charoli | Pune |
| Sagar Balasaheb Dabhade | Charoli | Pune |
| Sonali Sagar Dabhade | Charoli | Pune |
| Shranaya Sagar Dabhade Through Sagar Balasaheb Dabhade | Charoli | Pune |
| Sarika Somnath Bodake | Charoli | Pune |
| Sulochana Alias Sulabai Sudam Tapkir | Charoli | Pune |
| Deepak Rajmal Nagargoje | Charoli | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A SQUARE ARCHITECTS |
| Engineer | Rohinee Kailas Badgujar |
| Chartered Accountant | Bhave & Mantri LLP |
| Partner | Role in project |
|---|---|
| Amarnath Group of Companies | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Sep 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Sep 2026 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed22
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration and undertaking (Annexure A)File: Annexure A - Oder 50.pdf | 30 Sep 2026 |
| Layout approvalFile: 1 (1).pdf | 30 Sep 2026 |
| Building plan approvalFile: 1-2.pdf | 30 Sep 2026 |
| Building plan approvalFile: 2 (1).pdf | 30 Sep 2026 |
| Building plan approvalFile: 2-2.pdf | 30 Sep 2026 |
| Building plan approvalFile: 3 (1).pdf | 30 Sep 2026 |
| Building plan approvalFile: 4 (1).pdf | 30 Sep 2026 |
| Building plan approvalFile: 5.pdf | 30 Sep 2026 |
| Building plan approvalFile: 6.pdf | 30 Sep 2026 |
| Building plan approvalFile: 7.pdf | 30 Sep 2026 |
| Building plan approvalFile: 8.pdf | 30 Sep 2026 |
| Building plan approvalFile: 9.pdf | 30 Sep 2026 |
| Building plan approvalFile: 10.pdf | 30 Sep 2026 |
| Building plan approvalFile: 11.pdf | 30 Sep 2026 |
| Building plan approvalFile: 12.pdf | 30 Sep 2026 |
| Building plan approvalFile: 13.pdf | 30 Sep 2026 |
| Building plan approvalFile: 14.pdf | 30 Sep 2026 |
| Building plan approvalFile: 15.pdf | 30 Sep 2026 |
| Building plan approvalFile: 16.pdf | 30 Sep 2026 |
| Building plan approvalFile: 17.pdf | 30 Sep 2026 |
| Building plan approvalFile: 18.pdf | 30 Sep 2026 |
| Building plan approvalFile: 19.pdf | 30 Sep 2026 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| River Nest Building A Wing BP52100047001 | Charholi, Pune | 235 | Sep 2022 | Ongoing | Oct 2027Registered original: Dec 2025 | Not due yet |
| River Nest Building A Wing CP52100051184 | Charoli, Pune | 215 | Jun 2023 | Ongoing | Jun 2027Registered original: Jun 2026 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,900+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 22 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RIVER NEST BUILDING A WING D AND E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Charholi Budruk13,900+ in Pune
Filed coordinates, straight-line distance. 118 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Amarnath Group of Companies
Amarnath Group of Companies has 3 registrations on MahaRERA, including River Nest Building A Wing B and River Nest Building A Wing C. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if RIVER NEST BUILDING A WING D AND E is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RIVER NEST BUILDING A WING D AND E?
The registered promoter entity is Amarnath Group of Companies, a partnership as per the filing. Its GSTIN 27ABSFA7324E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RIVER NEST BUILDING A WING D AND E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RIVER NEST BUILDING A WING D AND E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RIVER NEST BUILDING A WING D AND E?
The professionals named in the filing: Architect: A SQUARE ARCHITECTS; Engineer: Rohinee Kailas Badgujar; Chartered Accountant: Bhave & Mantri LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RIVER NEST BUILDING A WING D AND E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback