River Nest Building A Wing C

By Amarnath Group of Companies

RG-MH-79563 · RERA P52100051184 · Last updated on MahaRERA portal: 28 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
49 of 215Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

River Nest Building A Wing C is a Others project by Amarnath Group of Companies in Pune, Maharashtra, registered with MahaRERA as P52100051184 on 1 Jun 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 166 of the 215 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameRiver Nest Building A Wing C
  • TypeOthers
  • Location
    • Charoli
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051184
  • ReraGenie IDRG-MH-79563

Builder

  • NameAmarnath Group of Companies
  • Entity typePartnership
  • GSTIN27ABSFA7324E1ZB
  • PartnersDada Dattu Jadhav, Balbhim Dashrath More
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2023First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed123 files

Current status

77%166 of 215 units booked
74.8%Work done, per cost certificate

Figures as on 28 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing CNA191818926215

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

Wing C: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 28 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed520

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots520
Closed/Covered80
Open Space440

Land and ownership89

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,341 sq m
Land owned byThe promoter, with other names on the file
Named landowners89
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 May 2026
LandownerVillageDistrict
Mr Shyam Baban DhabadeCHARHOLIPune
Mr Ramdas Baban DabhadeCHARHOLIPune
Mrs Indubai Baban DabhadeCHARHOLIPune
Narayan Shankar DabhadeCHARHOLIPune
Wagheshwar Dattatray DabhadeCHARHOLIPune
Shantaram Natthu DabhadeCHARHOLIPune
Maruti Namdeo DabhadeCHARHOLIPune
Rahul Vishnu DabhadeCHARHOLIPune
Narmada Kashinath DabhadeCHARHOLIPune
Shankar Kashinath DabhadeCHARHOLIPune
Yamuna GulabDabhadeCHARHOLIPune
Anita Shankar DabhadeCHARHOLIPune
Laxmibai Ankush GhotkuleCHARHOLIPune
Abhishek Shankar DabhadeCHARHOLIPune
Parubai Shankar DabhadeCHARHOLIPune
Santosh Shankar DabhadeCHARHOLIPune
Sonali Santosh DabhadeCHARHOLIPune
Vishal Shankar DabhadeCHARHOLIPune
Neha Vishal DabhadeCHARHOLIPune
Kumari Shravya Vishal DabhadeCHARHOLIPune
Jayshree Ramadas DabhadeCHARHOLIPune
Shravan Santosh DabhadeCHARHOLIPune
Mangal Vishnu DabhadeCHARHOLIPune
Kiran Vishnu DabhadeCHARHOLIPune
Rohini Maruti DabhadeCHARHOLIPune
Umesh Maruti DabhadeCHARHOLIPune
Kumar Shivnaya Umesh DabhadeCHARHOLIPune
Rupali Shyam DabhadeCHARHOLIPune
Shital Santosh KhengerCHARHOLIPune
Kavita Pandurang AavhaleCHARHOLIPune
Surekha Ramdas DabhadeCHARHOLIPune
Tushar Ramdas DabhadeCHARHOLIPune
Rohan Ramdas DabhadeCHARHOLIPune
Shakshi Shyam DabhadeCHARHOLIPune
Nisha Wagheshwar DabhadeCHARHOLIPune
Sangram Wagheshwar DabhadeCHARHOLIPune
Hirabai Popat ThorbeCHARHOLIPune
Parbhavati Pandrinath PacharneCHARHOLIPune
Parubai Arjun ThorbeCHARHOLIPune
Shashikala Ramdas TapkirCHARHOLIPune
Mala Arjun ThorbeCHARHOLIPune
Mira Jayram JadhavCHARHOLIPune
Usha Vasant PableCHARHOLIPune
Sangeeta Shantram DabhadeCHARHOLIPune
Saurabh Shantaram DabhadeCHARHOLIPune
Pragya Shantaram DabhadeCHARHOLIPune
Taramati Bhausaheb DabhdaeCHARHOLIPune
Rohit Bhausaheb DabhadeCHARHOLIPune
Akshay Bhausaheb DabhadeCHARHOLIPune
Prajakta Mahadev ThorbeCHARHOLIPune
Arti Ganesh ShivalkarCHARHOLIPune
Puja Rishikesh TambeCHARHOLIPune
Anjana Balasaheb DabhadeCHARHOLIPune
Ganesh Balasaheb DabhadeCHARHOLIPune
Shobha GaneshDabhadeCHARHOLIPune
Kumar Siddhant DabhadeCHARHOLIPune
Sagar Balasaheb DabhadeCHARHOLIPune
Sonali Sagar Dabhdae`CHARHOLIPune
Kumari Sharanya Sagar DabhadeCHARHOLIPune
Sarika Somanth BodakeCHARHOLIPune
Sulochna Sudam TapkirCHARHOLIPune
Babasaheb Narayan DabhadeCHARHOLIPune
Lilavati Babasaheb DabhadeCHARHOLIPune
Jaydev Babasaheb DabhadeCHARHOLIPune
Samita Jaydev DabhadeCHARHOLIPune
Kumar OMCHARHOLIPune
Raju Babasaheb DabhadeCHARHOLIPune
Asha Raju DabhadeCHARHOLIPune
Dipali Sanjay KashidCHARHOLIPune
Rupali Sunil KaleCHARHOLIPune
Vilas Narayan DabhadeCHARHOLIPune
Vijaya Vilas DabhadeCHARHOLIPune
Kartik Vilas DabhadeCHARHOLIPune
Swapnali Deepak GhenandCHARHOLIPune
Vrushali Mangesh TapkirCHARHOLIPune
Lilabai Balasaheb GhodgeCHARHOLIPune
Latabai Prabhakar ThorbeCHARHOLIPune
Atul Prakash DoreCHARHOLIPune
Bharat Gyaneshwar GholapCHARHOLIPune
Sameer Gyaneshwar GholapCHARHOLIPune
Kanchan Kachru PingateCHARHOLIPune
Shankar Namdeo DabhadeCHARHOLIPune
Jayshree Ramdas TapkirCHARHOLIPune
Priyanka Rahul DabhadeCHARHOLIPune
Satish Gulab DabhadeCHARHOLIPune
Sachin Gulab DabhadeCHARHOLIPune
Wagheshwar Dattu Alias Dattatray DabhadeCHARHOLIPune
Jayshree Wagheshwar DabhadeCHARHOLIPune
Master Harsh Jaydev DabhadeCHARHOLIPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI14000.04
Proposed, not sanctioned14,000 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVishrantwadi
Estimated costRs 52.96 cr
Cost incurredRs 39.60 cr
Work done74.78%
BuildingWingEstimatedIncurred
Wing CNARs 49.51 crRs 39.60 cr
-NARs 3.46 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Square Architects
EngineerMr Sachin Shete
EngineerRohinee Badgujar
Chartered AccountantCA Pravin Pise
Chartered AccountantVijay S Jadhav
Chartered AccountantHEERALAL G SHARMA
PartnerRole in project
Amarnath Group of Companies-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27062621582Jun 2026 → Jun 2027

Reason as filed by the promoterThe delay due to the revised sanction from the corporation can be attributed to several factors, including the need for a more thorough evaluation of the changes proposed, which required additional documentation and clarification. Internal review processes across various departments (such as legal, financial, and compliance) have taken longer than expected. The corporation also had to ensure that the revisions were aligned with current regulations and internal policies, which involved additional assessments and consultations. Furthermore, shifts in management priorities, potential resource con

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Adobe Scan 21-Jul-2026 (1).pdf28 Jul 2026
Withdrawal Update Form 2File: Form 2 C wing 2026.pdf28 Jul 2026
Withdrawal Update Form 3File: Form 3 (18).pdf28 Jul 2026
Form 2A (FY 2025-2026)File: River Nest C Wing 25-26 (1).pdf28 Jul 2026
Form 2A (FY 2026-2027)File: River Nest C Wing 26-27 (1).pdf28 Jul 2026
Withdrawal Update Form 1File: Form 1River Next C.pdf3 Jun 2026
Withdrawal Update Form 2File: River Nest Building A Wing C March 26(1) (2).pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf3 Jun 2026
Form 1File: Form 1 C wing 31 Dec 2025.pdf9 Mar 2026
Form 2File: Form 2 C wing.pdf9 Mar 2026
Form 3File: Form 3 C wing 20260309_18240096.pdf9 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory C Wing.pdf9 Mar 2026
Form 1File: Form 1 C Wing Q1 202520251218_18464657.pdf31 Dec 2025
Form 2File: Form 2 20251231_16054718.pdf31 Dec 2025
Form 3File: Form 3 june c wing20251224_15221915.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Dec 2025
Form 1File: Form 1 C Wing Q2 202520251218_18444987.pdf31 Dec 2025
Form 2File: Form 2 20251231_16054718.pdf31 Dec 2025
Form 3File: Form 320251231_15573906.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Dec 2025
Form 1File: form 1.pdf28 Dec 2025
Form 2File: form 2.pdf28 Dec 2025
Form 3File: FORM 3 NEW20251228_18384172.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf28 Dec 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0016.pdf28 Dec 2025
Form 1File: FORM 1.pdf28 Dec 2025
Form 2File: form21.pdf28 Dec 2025
Form 3File: FORM 3 NEW20251228_18571181.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold C.pdf28 Dec 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0017.pdf28 Dec 2025
Form 5 (FY 2024-2025)File: fORM 520251219_13391762.pdf19 Dec 2025
Form 1File: form1.pdf22 Aug 2025
Form 2File: FORM 2.pdf22 Aug 2025
Form 3File: FORM 30002.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold.pdf22 Aug 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0011.pdf22 Aug 2025
Form 1File: form1.pdf17 Jul 2025
Form 2File: FORM 2.pdf17 Jul 2025
Form 3File: FORM 3.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf17 Jul 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0012.pdf17 Jul 2025
Form 2A (FY 2023-2024)File: FORM 2A.pdf14 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf14 Jul 2025
Form 1File: FORM 1.pdf2 Jul 2025
Form 2File: form21.pdf2 Jul 2025
Form 3File: form 3.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory C wing 30-06-2023 sold unsold.pdf2 Jul 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0018.pdf2 Jul 2025
Form 1File: form1.pdf28 Jun 2025
Form 2File: Form 2.pdf28 Jun 2025
Form 3File: form3.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf28 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0015.pdf28 Jun 2025
Form 1File: form1.pdf28 Jun 2025
Form 2File: Form 2.pdf28 Jun 2025
Form 3File: form3.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf28 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0013.pdf28 Jun 2025
Form 1File: form 1.pdf28 Jun 2025
Form 2File: FORM 2.pdf28 Jun 2025
Form 3File: form3.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD0001.pdf28 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0014.pdf28 Jun 2025
Form 5 (FY 2023-2024)File: Form -5 C Wing 01-06-2023-31-03-2024.pdf28 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A C 2022-2023.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A C 2023-2024.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (1).pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (3).pdf3 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf3 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf3 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf3 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory C Wing.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory C Wing.pdf6 Jan 2024

How this compares with Pune

77%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep River Nest Building A Wing C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Charoli13,700+ in Pune

2 kmRiver Nest Building A WiCompleted 70Lapsed / revoked 28Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 156 registered projects within 2 km.

Builder: Amarnath Group of Companies

Amarnath Group of Companies has 2 registrations on MahaRERA, including River Nest Building A Wing B and River Nest Building A Wing C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if River Nest Building A Wing C is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of River Nest Building A Wing C?

The registered promoter entity is Amarnath Group of Companies, a partnership as per the filing. Its GSTIN 27ABSFA7324E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in River Nest Building A Wing C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for River Nest Building A Wing C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at River Nest Building A Wing C?

The professionals named in the filing: Architect: A Square Architects; Engineer: Mr Sachin Shete; Engineer: Rohinee Badgujar; Chartered Accountant: CA Pravin Pise; Chartered Accountant: Vijay S Jadhav; Chartered Accountant: HEERALAL G SHARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in River Nest Building A Wing C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About River Nest Building A Wing C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save River Nest Building A Wing C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.