Home / Browse projects / Pune, Maharashtra / River Nest Building A Wing B

Registered No litigation declared Others project

River Nest Building A Wing B

By Amarnath Group of Companies

RG-MH-48770 · RERA P52100047001 · Last updated on MahaRERA portal: 11 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedmoved 22 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 60%
48 of 235Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 194 documents Report an error

River Nest Building A Wing B is a Others project by Amarnath Group of Companies in Pune, Maharashtra, registered with MahaRERA as P52100047001 on 26 Sep 2022. Possession is promised by 30 Oct 2027. The completion date has moved by 22 months from the original filing. 187 of the 235 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameRiver Nest Building A Wing B
  • TypeOthers
  • Location
    • Charholi Bk
    • Charholi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047001
  • ReraGenie IDRG-MH-48770

Builder

  • NameAmarnath Group of Companies
  • Entity typePartnership
  • GSTIN27ABSFA7324E1ZB
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersDada Dattu Jadhav, Balbhim Dashrath More
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2022First promiseDec 2025Revised toOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion30 Oct 2027
  • Revised completionRevised to 30 Oct 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed194 files

Current status

80%187 of 235 units booked
64.4%Work done, per cost certificate

Figures as on 11 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WingNA201820827235

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

B Wing: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed314

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots314
Closed/Covered314

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,341 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jan 2026
LandownerVillageDistrict
Mr Ramdas Baban DabhadeCHARHOLIPune
Mrs Indubai Baban DabhadeCHARHOLIPune
Mr Shyam Baban DabhadeCHARHOLIPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI84130.25
Proposed, not sanctioned2,921 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVishrantwadi Pune
Estimated costRs 72.09 cr
Cost incurredRs 46.42 cr
Work done64.39%
BuildingWingEstimatedIncurred
B WingNARs 67.59 crRs 46.42 cr
-NARs 4.51 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Square Architects
EngineerMr Sachin Shete
EngineerRohinee Badgujar
Chartered AccountantCA Pravin Pise and Associates
Chartered AccountantVijay S Jadhav
Chartered AccountantHEERALAL G SHARMA
PartnerRole in project
Amarnath Group of Companies-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01012619215Dec 2025 → Jun 2027

Reason as filed by the promoterThe completion of the project has been delayed due to revisions in the sanctioned plans of the project. The process of obtaining revised sanctions involved submission of updated drawings, recalculation of permissible and sanctioned built-up area, and incorporation of changes in building configuration and statutory compliances as per prevailing regulations. The time consumed in scrutiny, observations, and approvals by the competent authorities was beyond the control of the promoter, which consequently affected the project execution schedule and led to delay in completion

P52100047001/WarDec 2025 → Oct 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2027

Documents filed194

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 194 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 (36).pdf11 Sep 2026
Withdrawal Update Form 2File: Form 2 (24).pdf11 Sep 2026
Withdrawal Update Form 3File: River Nest A Building B Wing CA Certificate (1)_11zon.pdf11 Sep 2026
Withdrawal Update Form 1File: river Nest Building A Wing B.pdf19 Aug 2026
Withdrawal Update Form 2File: form 2 (4).pdf19 Aug 2026
Withdrawal Update Form 3File: Form 3 B wing 28 july 2026_removed (1).pdf19 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A (1) (1).pdf10 Aug 2026
Withdrawal Update Form 1File: river Nest Building A Wing B.pdf3 Aug 2026
Withdrawal Update Form 2File: form 2 (4).pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 B wing 28 july 2026_organized.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1 (12) (1).pdf29 Jul 2026
Withdrawal Update Form 1File: Form 1 B WIng.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 B wing.pdf29 Jul 2026
Withdrawal Update Form 2File: form 2 (4).pdf29 Jul 2026
Withdrawal Update Form 3File: Form -3 Wing B_compressed (1).pdf29 Jul 2026
Withdrawal Update Form 3File: Form 3 B wing 28 july 2026_organized.pdf29 Jul 2026
Withdrawal Update Form 1File: Form 120260131_13275376 (1).pdf2 Feb 2026
Withdrawal Update Form 2File: Form 220260131_14233106 (1).pdf2 Feb 2026
Withdrawal Update Form 3File: Form 320260202_17221964.pdf2 Feb 2026
Withdrawal Update Form 1File: Form 120260131_13275376 (1).pdf31 Jan 2026
Withdrawal Update Form 2File: Form 220260131_14233106 (1).pdf31 Jan 2026
Withdrawal Update Form 3File: Form 320260131_14470309.pdf31 Jan 2026
Form 1File: form1.pdf28 Dec 2025
Form 2File: FORM2.pdf28 Dec 2025
Form 3File: FORM 3 20251228_13292375.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf28 Dec 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0005.pdf28 Dec 2025
Form 1File: FORM 1.pdf28 Dec 2025
Form 2File: FORM 02.pdf28 Dec 2025
Form 3File: FORM 3.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold C Wing 30 sep 202520251224_18070977.pdf28 Dec 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0006.pdf28 Dec 2025
Form 1File: FORM 1.pdf28 Dec 2025
Form 2File: form 2.pdf28 Dec 2025
Form 3File: FORM 3 20251228_13382030.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf28 Dec 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0007.pdf28 Dec 2025
Form 1File: form1.pdf28 Dec 2025
Form 2File: form 2.pdf28 Dec 2025
Form 3File: FORM 3.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf28 Dec 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0008.pdf28 Dec 2025
Form 1File: Q3 1 Form 1.pdf28 Dec 2025
Form 2File: form 2.pdf28 Dec 2025
Form 3File: FORM 3.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf28 Dec 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0009.pdf28 Dec 2025
Form 1File: Form 1.pdf24 Dec 2025
Form 2File: Form 2.pdf24 Dec 2025
Form 3File: Form 3.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Dec 2025
Form 1File: Form 1.pdf24 Dec 2025
Form 2File: Form 2.pdf24 Dec 2025
Form 3File: Form 3.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: fORM 520251226_13530660.pdf19 Dec 2025
Form 1File: FORM 1.pdf23 Aug 2025
Form 2File: FORM 2.pdf23 Aug 2025
Form 3File: FORM 30002.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory B Wing_31_3_25.pdf23 Aug 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION.pdf23 Aug 2025
Form 1File: FORM 1.pdf17 Jul 2025
Form 2File: FORM 2.pdf17 Jul 2025
Form 3File: FORM 3.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf17 Jul 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0001.pdf17 Jul 2025
Form 2A (FY 2022-2023)File: FORM 2A.pdf14 Jul 2025
Form 2A (FY 2023-2024)File: FORM 2A.pdf14 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf14 Jul 2025
Form 1File: FORM1.pdf2 Jul 2025
Form 3File: FORM 3.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory B wing 30-09-2022 sold unsold.pdf2 Jul 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0010.pdf2 Jul 2025
Form 2File: form21.pdf2 Jul 2025
Form 1File: form1.pdf1 Jul 2025
Form 2File: Form 2.pdf1 Jul 2025
Form 3File: FORM 3.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf1 Jul 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION0004.pdf1 Jul 2025
Form 5 (FY 2022-2023)File: Form -5 B Wing 26-09-2022-31-03-2023.pdf1 Jul 2025

How this compares with Pune

80%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 22 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep River Nest Building A Wing B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Charholi13,700+ in Pune

2 kmRiver Nest Building A WiCompleted 57Lapsed / revoked 21Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: Amarnath Group of Companies

Amarnath Group of Companies has 2 registrations on MahaRERA, including River Nest Building A Wing B and River Nest Building A Wing C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if River Nest Building A Wing B is delayed beyond 30 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of River Nest Building A Wing B?

The registered promoter entity is Amarnath Group of Companies, a partnership as per the filing. Its GSTIN 27ABSFA7324E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in River Nest Building A Wing B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for River Nest Building A Wing B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at River Nest Building A Wing B?

The professionals named in the filing: Architect: A Square Architects; Engineer: Mr Sachin Shete; Engineer: Rohinee Badgujar; Chartered Accountant: CA Pravin Pise and Associates; Chartered Accountant: Vijay S Jadhav; Chartered Accountant: HEERALAL G SHARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in River Nest Building A Wing B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About River Nest Building A Wing B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save River Nest Building A Wing B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.