ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Rite Amor

Registered No litigation declared Residential / Group Housing project

Rite Amor

By Rite Pragati Developers

RG-MH-74838 · RERA P51800034921 · Last updated on MahaRERA portal: 8 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 40 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 40 months from the original
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
29 of 69Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Rite Amor is a Residential / Group Housing project by Rite Pragati Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034921 on 28 Apr 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 40 months from the original filing. 40 of the 69 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameRite Amor
  • TypeResidential / Group Housing
  • Location
    • Mumbai
    • Malad (West)
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800034921
  • ReraGenie IDRG-MH-74838

Builder

  • NameRite Pragati Developers
  • Entity typePartnership
  • PartnersRitesh Virchand Shah, Ambar D Chanchad, Samir Shirish Dadia

Key dates

this monthRegisteredApr 2022First promiseAug 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Aug 2023)
  • Buildings1 building record
  • Documents filed81 files

Current status

58%40 of 69 units booked
95.0%Work done, per cost certificate

Figures as on 8 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rite AmorNA111069069

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Rite Amor: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 8 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered50
Open Space6

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,394 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Aug 2025
LandownerVillageDistrict
Malad Devki Villa CHSLAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4141.21
Proposed, not sanctioned1,392 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 4 35 Ground Floor Sagar Pallazio Mall Andheri Kurla Rd Sakinaka Andheri E Mumbai Maharashtra
Estimated costRs 16.86 cr
Cost incurredRs 16.01 cr
Work done95.0%
BuildingWingEstimatedIncurred
Rite AmorNARs 16.86 crRs 16.01 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Saumil Jhaveri
EngineerMr Vishal Nikam
EngineerRAJESH TAILOR
Chartered AccountantMr Jigar Jhaveri
PartnerRole in project
Rite Pragati Developers-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017500Aug 2023 → Aug 2024

Reason as filed by the promoterdue to delay in completing the work from contractor in completing the work, the project was unable to be completed on time. we would request you to kindly give us an extension for 12 months

EXT51800025041Aug 2023 → Aug 2025

Reason as filed by the promoterThe part of CTS NO. 495A, totally adm. 205.75 sq. mtrs. (being 50% of 411.5 sq. mtrs.), CTS No 495C adms. 1186.6 sq. mtrs,, totally admeasuring about 1392.35 sq. mtrs. owned and occupied by the said Malad Devki Villa Co-operative Housing Society Ltd. Development rights granted to M/s Rite Pragati Developers. The part of CTS NO 495A totally adm. 205.75 sq. mtrs. (being 50% of 411.5 sq. mtrs.), Plot bearing C.T.S. No.495D admeasuring 1444.85 sq. mtrs., owned and occupied by the said by the said Malad Rajnigandha Co-operative Housing Society Ltd (The Adjacent Property) development rights granted

EA12012619414Aug 2023 → Apr 2026

Reason as filed by the promoterWe hereby inform you that as per Intimation of Disapproval (IOD) and Commencement Certificate (CC) already received and Project is completed upto 90% only stack/mechanical parking area, Pumps & Meter Cabin and Fire Fighting installation is under process, rest the project work is completed, We hereby submit and declare that delay in project was due to delay from our Contractor for completion of construction work within time period. We kindly request for extension, this will allow us to ensure compliance with MahaRERA's regulation and complete our obligations to the best of our ability. We would

EA10092622505Aug 2023 → Dec 2026

Reason as filed by the promoterWe, Rite Pragati Developers, are the promoters of the real estate project known as "Rite Amor" bearing Maha RERA Registration No. P51800034921. We Would like to request you that the Project Rite Amor which is located at Plot Bearing CTS no. 495 A. 495 C & 495 D of Village Malad - West at Goraswadi Road Malad - west Mumbai - 400 064 having its Registration No P51800034921 was mentioned to be completed on 31•tDecember2026. Reason- Project is complete 100% however name of society is pending to be mutated on property card hence there is delay in obtaining Occupation Certificate. We request you kin

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.PDF8 Sep 2026
Withdrawal Update Form 2File: form 2.pdf8 Sep 2026
Withdrawal Update Form 3File: Signed Form 3 Rite Amor CA certificate 31 march 2026 FINAL.pdf8 Sep 2026
Form 2A (FY 2025-2026)File: Signed Form 2A Rite Amor.pdf8 Sep 2026
Withdrawal Update Form 1File: form 1.PDF27 Apr 2026
Withdrawal Update Form 2File: form 2.pdf27 Apr 2026
Withdrawal Update Form 3File: Signed Form 3 Rite Amor CA certificate 31 march 2026 FINAL.pdf27 Apr 2026
Withdrawal Update Form 1File: form 1.pdf7 Apr 2026
Withdrawal Update Form 2File: form 2.pdf7 Apr 2026
Withdrawal Update Form 3File: form 3.pdf7 Apr 2026
Withdrawal Update Form 1File: form 1.pdf24 Dec 2025
Withdrawal Update Form 2File: form 2.pdf24 Dec 2025
Withdrawal Update Form 3File: FORM 3.pdf24 Dec 2025
Withdrawal Update Form 1File: form 1.pdf31 Oct 2025
Withdrawal Update Form 2File: form 2.pdf31 Oct 2025
Withdrawal Update Form 3File: form 3.pdf31 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Rite Pragati Developers 23042025 (1).pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Amor 27022025.pdf1 Mar 2025
Declaration in FORM BFile: Form B Rite Amor FINAL.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (3).pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (3).pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory_Rite Amor.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Rite Amor Engineers 30 June 2024.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf24 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Signed form 2A (quality assurance) Rite Amor March 2024.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rite Amor.pdf19 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: FULL_FurtherCC.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Amor Signed Form 5 22-23.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1 Rite Amor 31 Dec 23.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Rite Amor Engineers form 2 31 December 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Rite Amor 31 December 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Rite Amor Sept 23.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf28 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Vishal Nikam.pdf28 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Rite Amor Engineers form 2 30 june 2023.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Rite Amor June 23.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1 Amor 31st March 2023.pdf17 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Rite Amor Architect form 2 310323.pdf17 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: signed Rite Amor form 5 21-22.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed CA Certificate Rite Amor Dec 22.pdf11 Apr 2023
Copy of the legal title reportFile: Title Report RERA Devki VIlla 19042022.pdf19 Apr 2022
Copy of the legal title reportFile: Title Annexure I Flow of tilte devki 19042022.pdf19 Apr 2022
Copy of the legal title reportFile: Title Annexure II CC for devki title 19042022.pdf19 Apr 2022
Declaration about Commencement CertificateFile: Format D CC Declaration Devki villa 19042022.pdf19 Apr 2022
Declaration about Commencement CertificateFile: Format D Clarification Devki villa 19042022.pdf19 Apr 2022
Layout approvalFile: Layout 06092021.pdf5 Apr 2022
Copy of Layout Approval (in case of layout)File: Layout 06092021.pdf5 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 10032022.pdf5 Apr 2022
Declaration in FORM BFile: Form -B devki 30032022.pdf5 Apr 2022
Proforma of Allotment letterFile: Proforma of Agreement for Sale.pdf5 Apr 2022
Building plan approvalFile: 1.pdf17 Mar 2022
Building plan approvalFile: 2.pdf17 Mar 2022
Building plan approvalFile: 3.pdf17 Mar 2022
Building plan approvalFile: 4.pdf17 Mar 2022
Building plan approvalFile: 5.pdf17 Mar 2022
Building plan approvalFile: 6.pdf17 Mar 2022
Building plan approvalFile: 7.pdf17 Mar 2022
Building plan approvalFile: 8.pdf17 Mar 2022
Building plan approvalFile: 9.pdf17 Mar 2022
PAN CardFile: Firm Pan Card.pdf17 Mar 2022
Details of encumbrancesFile: No Encumberance 04032022.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf17 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf17 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (1).pdf17 Mar 2022

How this compares with Mumbai Suburban

58%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 40 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rite Amor on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad (West)6,700+ in Mumbai Suburban

2 kmRite AmorCompleted 185Lapsed / revoked 116Other 173Dot size: filed unitsN

Filed coordinates, straight-line distance. 474 registered projects within 2 km.

Builder: Rite Pragati Developers

Rite Pragati Developers has 1 registration on MahaRERA, including Rite Amor. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Rite Amor is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rite Amor?

The registered promoter entity is Rite Pragati Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rite Amor?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rite Amor?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rite Amor?

The professionals named in the filing: Architect: Mr Saumil Jhaveri; Engineer: Mr Vishal Nikam; Engineer: RAJESH TAILOR; Chartered Accountant: Mr Jigar Jhaveri. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rite Amor?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rite Amor. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rite Amor to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.