Registration lapsed No litigation declared Others project

RISHABRAJ PERCY

By H RISHABRAJ REALTY

RG-MH-45599 · RERA P51800034819 · Last updated on MahaRERA portal: 11 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
19 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

RISHABRAJ PERCY is a Others project by H RISHABRAJ REALTY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034819 on 28 Apr 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 17 of the 36 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameRISHABRAJ PERCY
  • TypeOthers
  • Location
    • I C COLONY
    • BORIVALI WEST
    • Borivali
    • Mumbai Suburban
    • 400103
  • Pincode400103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800034819
  • ReraGenie IDRG-MH-45599

Builder

  • NameH RISHABRAJ REALTY
  • Entity typePartnership
  • PartnersREKHA HARISH JAIN, REKHA HARISH JAIN, REKHA HARISH JAIN
  • Other registrations10 more →
  • Completed7 of 11
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredApr 2022First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed70 files

Current status

47%17 of 36 units booked

Figures as on 11 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RISHABRAJ PERCYNA121229736

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

RISHABRAJ PERCY: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes80%

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered29

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area656 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PERCY CHSLBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2289.87
Proposed, not sanctioned2,290 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchON SIDDIGIRI SHOP 1 TO 5 SANT GYANESHWAR MARG BORIVALI EAST MUMBAI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKRISHNA MAKHELA
EngineerUNISTEPS CONSULTING PVT LTD
Chartered AccountantZENITH M JAIN & CO
Chartered AccountantLADDHA & LADDHA
PartnerRole in project
H RISHABRAJ REALTY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025752Dec 2024 → Dec 2025

Reason as filed by the promoterThe existing building was demolished and the construction work of new building is completed comprising of ground level + Ground Floor + 1st floor for IT Office + Service floor + 2nd to 1 2th (pt.) upper floor + LMR/OHT as per approved amended plans dated 13 .12.2023. However, only the work of parking tower remains incomplete due to the unavailability of parking materials and delay by the vendors in installing in the pallets in the parking tower. Further. we assure that the said work of installation of parking tower has already commenced on the project site and will be completed on or before Oc

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Mar 2025

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: FORM-5 Percy.pdf11 Nov 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Percy Mar2025.pdf9 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RISHABRAJ PERCY OC.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Percy Form 1.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Percy.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Percy Form 2.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: percy.pdf8 Jan 2025
Declaration in FORM BFile: Rera Form B- Percy.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PercyForm3Sep24.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PercyForm1Sep24.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PercyForm2A.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PercyForm2.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Percy Form 5.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PercyForm3June24.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rishabraj Percy June 2024.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Percy June 2024.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rishabraj Percy- Form 1 March 2024.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Percy Dec 24.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Percy March 24.pdf31 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rishabraj Percy Form 2 March 2024.pdf17 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: PERCY- CC.pdf19 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rishabraj Percy Form 1 Dec 2023.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rishabraj Percy Form 2 Dec 2023.pdf11 Jan 2024
Layout approvalFile: PERCY Drawing 1-4.pdf26 Dec 2023
Layout approvalFile: PERCY Drawing 5-7.pdf26 Dec 2023
Building plan approvalFile: Amended Plan Approval letter_signed.pdf26 Dec 2023
Copy of Layout Approval (in case of layout)File: PERCY Drawing 1-4.pdf26 Dec 2023
Copy of Layout Approval (in case of layout)File: PERCY Drawing 5-7.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Approval letter_signed.pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PERCY - June 2022.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PERCY - Sept 2022.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PERCY -Dec 2022.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PERCY - March 2023.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PERCY - June 2023.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PERCY - Sept 2023.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Percy RERA Sept 2023.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_PERCY_SIGNED.pdf18 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rishabraj Percy - Form-2 Dec 2022.pdf17 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rishabraj Percy - Form-2 March 2023.pdf17 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rishabraj Percy - Form-2 June 2023.pdf17 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rishabraj Percy - Form-2 Sept 2023.pdf17 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Percy 31122022.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Percy 31032023.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Percy 30062023.pdf4 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM- 2A Rishabraj Percy- YEAR 2022-2023.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf8 Apr 2022
Proforma of Allotment letterFile: RERA- Agreement for Sale.pdf8 Apr 2022
Layout approvalFile: IOD Drawing - Percy-1.pdf7 Apr 2022
Layout approvalFile: IOD Drawing - Percy-2.pdf7 Apr 2022
Layout approvalFile: IOD Drawing - Percy-3.pdf7 Apr 2022
Layout approvalFile: IOD Drawing - Percy-4.pdf7 Apr 2022
Layout approvalFile: IOD Drawing - Percy-5.pdf7 Apr 2022
Building plan approvalFile: IOD.pdf7 Apr 2022
PAN CardFile: H rishabraj realty pan card.pdf7 Apr 2022
Copy of the legal title reportFile: Title Certificate.pdf7 Apr 2022
Details of encumbrancesFile: No Encumbrances.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: IOD Drawing - Percy-1.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: IOD Drawing - Percy-2.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: IOD Drawing - Percy-3.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: IOD Drawing - Percy-4.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: IOD Drawing - Percy-5.pdf7 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf7 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 Apr 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf7 Apr 2022
Declaration in FORM BFile: PERCY FORM B.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Apr 2022
CERSAI detailsFile: Cersai Report - Percy.pdf7 Apr 2022
Proforma of Allotment letterFile: Letter of Allotment .pdf7 Apr 2022

How this compares with Mumbai Suburban

47%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RISHABRAJ PERCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI WEST6,700+ in Mumbai Suburban

2 kmRISHABRAJ PERCYCompleted 90Lapsed / revoked 58Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 284 registered projects within 2 km.

Builder: H RISHABRAJ REALTY

H RISHABRAJ REALTY has 11 registrations on MahaRERA, including RISHABRAJ SURAJ and RISHABRAJ RAMESHWAR. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that RISHABRAJ PERCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RISHABRAJ PERCY is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RISHABRAJ PERCY?

The registered promoter entity is H RISHABRAJ REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RISHABRAJ PERCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RISHABRAJ PERCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RISHABRAJ PERCY?

The professionals named in the filing: Architect: KRISHNA MAKHELA; Engineer: UNISTEPS CONSULTING PVT LTD; Chartered Accountant: ZENITH M JAIN & CO; Chartered Accountant: LADDHA & LADDHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RISHABRAJ PERCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RISHABRAJ PERCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RISHABRAJ PERCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.