RIOLAND B WING
By WAMAN KALATE INFRASTRUCTURES
RG-MH-97639 · RERA P52100053851 · Last updated on MahaRERA portal: 15 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 15 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RIOLAND B WING is a Residential / Group Housing project by WAMAN KALATE INFRASTRUCTURES in Pune, Maharashtra, registered with MahaRERA as P52100053851 on 5 Dec 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 15 months from the original filing.
At a glance
Project
- NameRIOLAND B WING
- TypeResidential / Group Housing
- Location
- WAKAD-AUNDH ROAD
- WAKAD
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053851
- ReraGenie IDRG-MH-97639
Builder
- NameWAMAN KALATE INFRASTRUCTURES
- Entity typePartnership
- PartnersMANOHAR WAMAN KALATE, VILAS WAMAN KALATE, NILESH VILAS KALATE
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Dec 2023
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Sep 2024)
- Buildings1 building record
- Documents filed84 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RIOLAND B WING | NA | 7 | 7 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
RIOLAND B WING: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed35
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership18
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MANOHAR WAMAN KALATE | Wakad | Pune |
| VILAS WAMAN KALATE | Wakad | Pune |
| bhamabai manohar kalate | Wakad | Pune |
| VISHAL MANOHAR KALATE | Wakad | Pune |
| SHRADDHA VISHAL KALATE | Wakad | Pune |
| RANI GANESH GUNDGAL | Wakad | Pune |
| SONALI PRADEEP LANDGE | Wakad | Pune |
| BHARATI VILAS KALATE | Wakad | Pune |
| NILESH VILAS KALATE | Wakad | Pune |
| SAPNA NILESH KALATE | Wakad | Pune |
| VINAY VILAS KALATE | Wakad | Pune |
| KALYANI ANIL BHONDVE | Wakad | Pune |
| BIBABAI GANPAT SHEDGE | Wakad | Pune |
| VITTHAL GANPAT SHEDGE | Wakad | Pune |
| SUSHILA VITTHAL SHEDGE | Wakad | Pune |
| UMESH GANPAT SHEDGE | Wakad | Pune |
| SUJATA UMESH SHEDGE | Wakad | Pune |
| MANALI VINAY KALATE | Wakad | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Chartered Accountant | Ritesh |
| Partner | Role in project |
|---|---|
| WAMAN KALATE INFRASTRUCTURES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) DELAY IN RECEIVING TECHINICAL DOCUMENTS FROM PLANNING AUTHORITY 2) LACK OF MATERIAL AVAILIBILITY 3) RAINY SEASON 4) LACK OF SKILLED LABOUR
Reason as filed by the promoterDue shortage of labor during the festive season and heavy rains in previous year the estimated timeline could not be achieved. However, the work is almost completed and the process of completion will also be started shortly.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: architect form dec 25.pdf | 15 Mar 2026 |
| Form 2File: engg sept 2025.pdf | 15 Mar 2026 |
| Form 3File: CA form september 25.pdf | 15 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold inventry sep 25.pdf | 15 Mar 2026 |
| Form 1File: architect form dec 25.pdf | 15 Mar 2026 |
| Form 2File: engg form dec 25.pdf | 15 Mar 2026 |
| Form 3File: CA Form December 25.pdf | 15 Mar 2026 |
| OthersFile: oc receipt .PDF | 15 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold inventory dec 25.pdf | 15 Mar 2026 |
| Form 1File: archi form 1 june 2025.pdf | 15 Sep 2025 |
| Form 2File: engg form 2 june 25.pdf | 15 Sep 2025 |
| Form 3File: CA form 3 june 25.pdf | 15 Sep 2025 |
| OthersFile: Completion Bwing_2.pdf | 15 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: CA form 3 june 25.pdf | 15 Sep 2025 |
| Form 1File: architect form 1 march 2025.pdf | 29 May 2025 |
| Form 2File: engg form 2 march 2025.pdf | 29 May 2025 |
| Form 3File: form 3 march 25.pdf | 29 May 2025 |
| Form 1File: arch form dec 24.pdf | 29 May 2025 |
| Form 2File: engg dec 24.pdf | 29 May 2025 |
| Form 3File: CA form3 dec 25.pdf | 29 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 2024.pdf | 2 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: disclousre od sold inventory.pdf | 2 Apr 2025 |
| Declaration in FORM BFile: form B ext (1).pdf | 27 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 (2).pdf | 27 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form3 dec 25.pdf | 27 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch form dec 24.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form3 dec 25.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg dec 24.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect form September 24.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 SEPTEMBER 2024.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer form September 24.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg september 2024 s.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold imventory.pdf | 15 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: engg 2A.pdf | 15 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf | 15 Oct 2024 |
| Declaration in FORM BFile: FORM B.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch certificate March 24.pdf | 16 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg certificate form 2 March 24.pdf | 16 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 March 24.pdf | 16 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 k.pdf | 29 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 k.pdf | 29 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 29 Feb 2024 |
| Copy of the legal title reportFile: LTR 011223_compressed.pdf | 1 Dec 2023 |
| Other - LegalFile: supplimentry agreement_compressed-1.pdf | 20 Nov 2023 |
| Other - LegalFile: supplimentry agreement_compressed-2.pdf | 20 Nov 2023 |
| Other - LegalFile: supplimentry agreement_compressed-3_11zon.pdf | 20 Nov 2023 |
| Other - LegalFile: supplimentry agreement_compressed-4.pdf | 20 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE.pdf | 2 Nov 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE.pdf | 2 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation reprot.pdf | 2 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 final correction.pdf | 11 Oct 2023 |
| Proforma of Allotment letterFile: allotment letter on leter head.pdf | 7 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: deviation report letter head.pdf | 7 Oct 2023 |
| Proforma of Agreement for saleFile: AGREEMENT AS PER RERA.pdf | 6 Oct 2023 |
| Other - LegalFile: encumbrance finance and legal.pdf | 6 Oct 2023 |
| Other - FinanceFile: encumbrance finance and legal.pdf | 6 Oct 2023 |
| PAN CardFile: 1 PAN Card.pdf | 20 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: encumbrances finance.pdf | 20 Sep 2023 |
| Details of encumbrances concerned to LegalFile: encumbrances finance.pdf | 20 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate on Quality Assurance.pdf | 20 Sep 2023 |
| CERSAI detailsFile: CERSAI_Search_Report new.pdf | 20 Sep 2023 |
| Building plan approvalFile: B WING PLAN_compressed.pdf | 17 Aug 2023 |
| Building plan approvalFile: 2463 area marking1.pdf | 17 Aug 2023 |
| Building plan approvalFile: plan B wing highlighting2.pdf | 17 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: B WING PLAN_compressed.pdf | 17 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2463 area marking1.pdf | 17 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: plan B wing highlighting2.pdf | 17 Aug 2023 |
| Declaration about Commencement CertificateFile: DECLARATION CC NEW FORMAT1.pdf | 17 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: vishal discloser real estate.pdf | 8 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Nilesh vilas kalate interest real estate.pdf | 8 Aug 2023 |
| Layout approvalFile: encumbrance finance and legal.pdf | 3 Aug 2023 |
| Building plan approvalFile: NA Order for plotted development.pdf | 3 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: encumbrance finance and legal.pdf | 3 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NA Order for plotted development.pdf | 3 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC new 2023.pdf | 3 Aug 2023 |
| Declaration in FORM BFile: declaration for B WKI partner.pdf | 3 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form1 September 2022.pdf | 3 Aug 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| RIOLAND A WING | SR.NO. 272 | 28 | Completed | Dec 2023 | Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RIOLAND B WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WAKAD13,700+ in Pune
Filed coordinates, straight-line distance. 271 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: WAMAN KALATE INFRASTRUCTURES
WAMAN KALATE INFRASTRUCTURES has 1 registration on MahaRERA, including RIOLAND B WING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that RIOLAND B WING shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if RIOLAND B WING is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RIOLAND B WING?
The registered promoter entity is WAMAN KALATE INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RIOLAND B WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RIOLAND B WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RIOLAND B WING?
The professionals named in the filing: Chartered Accountant: Ritesh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RIOLAND B WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback