Registered No litigation declared Residential / Group Housing project

RIDHI SIDHI

By KESAR INFRA LLP

RG-MH-57435 · RERA P51800046974 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken
  • Rs 35.00 crore secured on the land, in favour of Capri Global Capital Limited

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 18 months from the original
28 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 80%
112 of 130Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

RIDHI SIDHI is a Residential / Group Housing project by KESAR INFRA LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046974 on 26 Sep 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 18 months from the original filing. 18 of the 130 units on this registration are recorded sold or booked, and 28 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRIDHI SIDHI
  • TypeResidential / Group Housing
  • Location
    • BHAGWAN MAHAVEER ROAD
    • J.B. NAGAR
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046974
  • ReraGenie IDRG-MH-57435

Builder

  • NameKESAR INFRA LLP
  • Entity typePartnership
  • PartnersAJAY RADHESHAYM BANSAL, RAKESH BABULAL RATHOD, VIJAYRAJ ROOPCHAND RANKA, DINESH POPATLAL RATHOD

Key dates

this monthRegisteredSep 2022First promiseJun 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2025)
  • Buildings4 building records
  • Documents filed87 files

Current status

14%18 of 130 units booked
88.6%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA131224024
WING BNA131238038
WING CNA131239039
WING DNA131229029

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

WING A67%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
WING B67%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
WING C91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed140

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots140
Closed/Covered140
BuildingClosed/CoveredTotal
WING A3535
WING B3535
WING C3535
WING D3535

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,155 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofCapri Global Capital Limited
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on22 Jul 2026
LandownerVillageDistrict
RIDHI SIDHI CHS LTDAndheriMumbai Suburban
RIDHI SIDHI RATNA CHS LTDAndheriMumbai Suburban
MINI APARTMENTSAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8516.23
Proposed, not sanctioned7,758 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJ B NAGAR ANDHERI EAST
Estimated costRs 33.00 cr
Cost incurredRs 29.23 cr
Work done88.57%
BuildingWingEstimatedIncurred
WING ANARs 7.74 crRs 6.89 cr
WING BNARs 7.74 crRs 6.89 cr
WING CNARs 7.74 crRs 6.89 cr
WING DNARs 7.74 crRs 6.89 cr
-NARs 2.05 crRs 1.68 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPREMAL K GOGRI
ArchitectASHISH SOLANKI
EngineerABHIJIT PHATARPEKAR
EngineerAVP STRUCTURAL CONSULTANTS
Chartered AccountantKAMAL DHANUKA
Chartered AccountantDK JHANWAR
Chartered Accountantkamal dhanuka& co
PartnerRole in project
KESAR INFRA LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA10072502037Jun 2025 → Dec 2026

Reason as filed by the promoterWe, Kesar Infra LLP, are submitting this application to request an extension for the registered project with Registration No. P-51800046974. Due to unforeseen circumstances, the project cannot be completed within the initially given timeline. This project comprises four wings, with Wings "C" and "D" nearing completion. Wings "A" and "B" are built up to the 9th floor, while approvals for the 10th, 11th, and 12th floors remain pending. The delay stems from restrictions imposed by the Brihanmumbai Municipal Corporation (BMC) on a portion of our Floor Space Index (FSI) due to technical reasons. Th

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602034Rohit Rajan AgarwalKESAR INFRA LLP06/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf6 May 2026
Withdrawal Update Form 2File: form 2.pdf6 May 2026
Withdrawal Update Form 3File: form 3.pdf6 May 2026
Withdrawal Update Form 1File: form 1.pdf29 Apr 2026
Withdrawal Update Form 2File: form 2.pdf29 Apr 2026
Withdrawal Update Form 3File: form 3.pdf29 Apr 2026
Withdrawal Update Form 1File: form 1.pdf28 Apr 2026
Withdrawal Update Form 2File: form 2.pdf28 Apr 2026
Withdrawal Update Form 3File: form 3_compressed (17).pdf28 Apr 2026
Layout approvalFile: PLAN 1.pdf25 Apr 2026
Layout approvalFile: PLAN 2.pdf25 Apr 2026
Layout approvalFile: PLAN 3.pdf25 Apr 2026
Commencement certificateFile: CC.pdf25 Apr 2026
Withdrawal Update Form 1File: form 1 01-07-25.pdf25 Apr 2026
Withdrawal Update Form 2File: form 2 of 01-07-25.pdf25 Apr 2026
Withdrawal Update Form 3File: form 3 of 01-07-25.pdf25 Apr 2026
Form 2A (FY 2024-2025)File: form 2A of 01-07-25.pdf10 Nov 2025
Form 5 (FY 2024-2025)File: CA Form 5 FY 24-25 kesar infra.pdf19 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 of 01-04-25.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of 1-4-25.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of 01-04-25.pdf16 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA form 5 of FY 23-24 (1).pdf1 Apr 2025
Layout approvalFile: amended drawing PDF 24-08-23_1-2.pdf26 Mar 2025
Layout approvalFile: amended drawing PDF 24-08-23_3-4.pdf26 Mar 2025
Layout approvalFile: amended drawing PDF 24-08-23_5-6.pdf26 Mar 2025
Layout approvalFile: amended drawing PDF 24-08-23_7-end.pdf26 Mar 2025
Building plan approvalFile: Amend IOD signed 24-08-23.pdf26 Mar 2025
Copy of Layout Approval (in case of layout)File: amended drawing PDF 24-08-23_1-2.pdf26 Mar 2025
Copy of Layout Approval (in case of layout)File: amended drawing PDF 24-08-23_3-4.pdf26 Mar 2025
Copy of Layout Approval (in case of layout)File: amended drawing PDF 24-08-23_5-6.pdf26 Mar 2025
Copy of Layout Approval (in case of layout)File: amended drawing PDF 24-08-23_7-end.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Amend IOD signed 24-08-23.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 01-01-2025.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 01-01-2025_1.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01-01-2025.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer form 2.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 1-4-2024.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 1-4-2024.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 1-4-2024.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 1-4-2024.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecht Form 1 01-01-2024.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01-01-2024.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_000284.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect form 1 1-10-2023.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 of engg 1-10-2023.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 of CA 1-10-2023.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Form 5 of Yr 22-23.pdf11 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVP Form 2.pdf12 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AVP Form 2A.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of 1-7-23 (2).pdf12 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: icici bank account detail declretion in RERA_000072.pdf21 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ashish RERA Form 1.pdf9 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng.pdf9 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf9 Jan 2023
Proforma of Allotment letterFile: Final Agreement for Sale July 2022.pdf13 Sep 2022
Deviation Report with respect to model copy of AgreementFile: diviation letter.pdf13 Sep 2022
Details of encumbrances concerned to LegalFile: legal and litigetion encumbrances declaration.pdf4 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 kamal.pdf4 Sep 2022
Details of encumbrances concerned to FinanceFile: declaration encumbrances.pdf11 Aug 2022
Other - FinanceFile: declaration encumbrances.pdf11 Aug 2022
Building plan approvalFile: IOD approved plan.pdf25 Jul 2022
Layout approvalFile: layout approved plan.pdf25 Jul 2022
PAN CardFile: kesarinfra pancard.pdf25 Jul 2022
Copy of the legal title reportFile: ridhi sidhi title certificate.pdf25 Jul 2022
Details of encumbrances concerned to FinanceFile: declaration encumbrances.pdf25 Jul 2022
Copy of Layout Approval (in case of layout)File: layout approved plan.pdf25 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD approved plan.pdf25 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: ridhi sidhi plinth CC.pdf25 Jul 2022
Declaration about Commencement CertificateFile: Developer CCi declretion.pdf25 Jul 2022
Declaration in FORM BFile: Developer declretion form B.pdf25 Jul 2022
Declaration in FORM BFile: mini form b com.pdf25 Jul 2022
Declaration in FORM BFile: ridhi sidhi declretion form B.pdf25 Jul 2022

How this compares with Mumbai Suburban

14%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RIDHI SIDHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near J.B. NAGAR6,700+ in Mumbai Suburban

2 kmRIDHI SIDHICompleted 107Lapsed / revoked 59Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 247 registered projects within 2 km.

Builder: KESAR INFRA LLP

KESAR INFRA LLP has 1 registration on MahaRERA, including RIDHI SIDHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RIDHI SIDHI is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RIDHI SIDHI?

The registered promoter entity is KESAR INFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RIDHI SIDHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RIDHI SIDHI?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RIDHI SIDHI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RIDHI SIDHI?

The professionals named in the filing: Architect: PREMAL K GOGRI; Architect: ASHISH SOLANKI; Engineer: ABHIJIT PHATARPEKAR; Engineer: AVP STRUCTURAL CONSULTANTS; Chartered Accountant: KAMAL DHANUKA; Chartered Accountant: DK JHANWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIDHI SIDHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIDHI SIDHI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIDHI SIDHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.