Home / Browse projects / Pune, Maharashtra / Riddhi Siddhi Imperia

Registered No litigation declared Residential / Group Housing project

Riddhi Siddhi Imperia

By RAJESH SADHURAM GURNANI

RG-MH-31183 · RERA P52100079517 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 85%
36 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Riddhi Siddhi Imperia is a Residential / Group Housing project by RAJESH SADHURAM GURNANI in Pune, Maharashtra, registered with MahaRERA as P52100079517 on 10 Mar 2025. Possession is promised by 31 Dec 2027. 6 of the 42 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameRiddhi Siddhi Imperia
  • TypeResidential / Group Housing
  • Location
    • Narhe
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079517
  • ReraGenie IDRG-MH-31183

Builder

  • NameRAJESH SADHURAM GURNANI
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Mar 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

14%6 of 42 units booked
27.5%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Riddhi Siddhi ImperiaNA9742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 85%.

Riddhi Siddhi Imperia: 20% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Closed/Covered66

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area982 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3169.67
Proposed, not sanctioned3,168 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW ADDRESS- M 4, Virwani Plaza Complex, Opp Dass Electronics, East Street, Next to Bombay Garage, Pune 411001
Estimated costRs 8.75 cr
Cost incurredRs 2.41 cr
Work done27.5%
BuildingWingEstimatedIncurred
Riddhi Siddhi ImperiaNARs 7.88 crRs 2.17 cr
-NARs 87.53 lakhRs 24.07 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectWALS ARCHITECTS..(WALHEKAR ASSOCIATES)
EngineerOmkar S. Sonawane
Chartered AccountantBIPIN VORA & ASSOCIATES
Chartered AccountantPatel & Sharma
Chartered AccountantAgarwal Sarawgi and Associates
PartnerRole in project
RAJESH SADHURAM GURNANI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf30 May 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf30 May 2026
Withdrawal Update Form 3File: Final form 3.pdf30 May 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf29 May 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf29 May 2026
Withdrawal Update Form 3File: FORM -3.pdf29 May 2026
Withdrawal Update Form 1File: 00 final form signed.pdf16 Feb 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE.pdf16 Feb 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf16 Feb 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE new.pdf12 Feb 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE.pdf12 Feb 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf12 Feb 2026
Form 2A (FY 2024-2025)File: FORM 2A QUALITY ASS CERTIFICATE.pdf8 Dec 2025
Layout approvalFile: Edit-NARHE NEW SANCTIONED PLAN -2 Copy_compressed.pdf31 Oct 2025
Building plan approvalFile: NARHE NEW SANCTIONED PLAN -1_compressed.pdf31 Oct 2025
Layout approvalFile: Edit-NARHE NEW SANCTIONED PLAN -2 Copy_compressed.pdf31 Oct 2025
Building plan approvalFile: NARHE NEW SANCTIONED PLAN -1_compressed.pdf31 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf30 Oct 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.pdf30 Oct 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.pdf30 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf30 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 _Signed.pdf24 Sep 2025
Form 1File: Architect Certificate.pdf19 Jul 2025
Form 2File: ENGINEER CERTIFICATE.pdf19 Jul 2025
Form 3File: CA CERTIFICATE_11zon.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF UNSOLD.pdf19 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf19 Jul 2025
Form 2File: ENGINEER CERTIFICATE.pdf19 Jul 2025
Form 3File: FORM 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: DECLARATION OF SOLD & UNSOLD.pdf19 Jul 2025
Architect Certificate29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_11zon.pdf29 Apr 2025
ENGINEER CERTIFICATE29 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF UNSOLD.pdf29 Apr 2025
Proforma of Agreement for saleFile: ATS dated 10022025.pdf25 Jan 2025
Proforma of Agreement for saleFile: DECLARATION LETTER.pdf25 Jan 2025
Other - LegalFile: DECLARATION LETTER.pdf22 Jan 2025
Other - TechnicalFile: CC Verification With Application No.pdf15 Jan 2025
Declaration about Commencement CertificateFile: Declaration Of CC updated.pdf13 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A-Updated.pdf13 Jan 2025
Other - TechnicalFile: Declaration cum Undertaking for Order 50 Final.pdf13 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Updated.pdf13 Jan 2025
Other - TechnicalFile: New Shop Act.pdf9 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Latest.pdf9 Jan 2025
Layout approvalFile: 1-2 Layout Plan_compressed.pdf6 Jan 2025
Building plan approvalFile: 2-2 Building Plan_compressed.pdf6 Jan 2025
Details of encumbrances concerned to FinanceFile: 08 Encumbrances concerned to Legal.pdf6 Jan 2025
Copy of Layout Approval (in case of layout)File: 1-2 Layout Plan_compressed.pdf6 Jan 2025
Proforma of Allotment letterFile: Allotment Letter_SN-32-18-Narhe-Rajesh Gurnani-Sudhir Gokhale- 21-11-2024 (1).pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-2 Building Plan_compressed.pdf6 Jan 2025
Details of encumbrances concerned to LegalFile: 08 Encumbrances concerned to Legal.pdf6 Jan 2025
PAN CardFile: PAN and Shop Act.pdf4 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf4 Jan 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERNED TO FINANCE.pdf4 Jan 2025
Declaration in FORM BFile: 06 Form B As per original RERA format1.pdf4 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf4 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM-3.pdf4 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Form 2 Engineer Certificate Format 1.pdf4 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 00 Commencement Certificate.pdf4 Jan 2025
Other - LegalFile: New Shop Act.pdf4 Jan 2025
Other - LegalFile: Sale Deed Ghokhale -Gurnani DocNo-1684921 HVL-16-31-35 2.pdf4 Jan 2025
Other - LegalFile: Sale Deed Ghokhale -Gurnani Doc No-1684921 HVL-16-26-30 2.pdf4 Jan 2025
Other - LegalFile: Sale Deed Ghokhale -Gurnani Doc No-1684921 HVL-16-21-25 2.pdf4 Jan 2025
Other - LegalFile: Sale Deed Ghokhale -Gurnani Doc No-1684921 HVL-16-14-15.pdf4 Jan 2025
Other - LegalFile: Sale Deed Ghokhale -Gurnani Doc No-1684921 HVL-16-11-13.pdf4 Jan 2025
Other - LegalFile: Sale Deed Ghokhale -Gurnani Doc No-1684921 HVL-16-6-10 2.pdf4 Jan 2025
Other - LegalFile: Sale Deed Ghokhale -Gurnani Doc No-1684921 HVL-16-1-5 2.pdf4 Jan 2025
Other - LegalFile: Sale Deed Ghokhale -Gurnani Doc No-1684921 HVL-16-16-20 2.pdf4 Jan 2025
CERSAI detailsFile: UNDERTAKING FOR NO CHARGE ON PROJECT.pdf4 Jan 2025
Deviation Report with respect to Allotment letterFile: 11 Draft Deviation Report Allotment Letter (2).pdf4 Jan 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERNED TO FINANCE.pdf4 Jan 2025
Other - TechnicalFile: CC Verification Mail.pdf4 Jan 2025
Deviation Report with respect to model copy of AgreementFile: 03 deviation report ATS.pdf4 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE FOR SECURED UNSECURED FINANCE.pdf4 Jan 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DURVANKUR RESIDENCY PHASE-2Wagholi Taluka-Haveli Pune-41220716CompletedJun 2018Jun 2018
Durvankur ResidencyPhase-1 Radheshwari Nagar Bakori Road Wagholi Pune94CompletedJul 2016Late, Sep 2023

How this compares with Pune

14%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Riddhi Siddhi Imperia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Narhe13,700+ in Pune

2 kmRiddhi Siddhi ImperiaCompleted 59Lapsed / revoked 31Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 159 registered projects within 2 km.

Builder: RAJESH SADHURAM GURNANI

RAJESH SADHURAM GURNANI has 2 registrations on MahaRERA, including DURVANKUR RESIDENCY PHASE-2 and Riddhi Siddhi Imperia. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Riddhi Siddhi Imperia is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Riddhi Siddhi Imperia?

The registered promoter entity is RAJESH SADHURAM GURNANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Riddhi Siddhi Imperia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Riddhi Siddhi Imperia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Riddhi Siddhi Imperia?

The professionals named in the filing: Architect: WALS ARCHITECTS..(WALHEKAR ASSOCIATES); Engineer: Omkar S. Sonawane; Chartered Accountant: BIPIN VORA & ASSOCIATES; Chartered Accountant: Patel & Sharma; Chartered Accountant: Agarwal Sarawgi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Riddhi Siddhi Imperia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Riddhi Siddhi Imperia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Riddhi Siddhi Imperia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.