Home / Browse projects / Ahmednagar, Maharashtra / RIDDHI SIDDHI HEIGHTS
RIDDHI SIDDHI HEIGHTS
By RIDDHI SIDDHI BUILDERS AND PROMOTERS
RG-MH-83889 · RERA P52200021217 · Last updated on MahaRERA portal: 2 May 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RIDDHI SIDDHI HEIGHTS is a Others project by RIDDHI SIDDHI BUILDERS AND PROMOTERS in Ahmednagar, Maharashtra, registered with MahaRERA as P52200021217 on 14 Jun 2019. The registration is recorded completed; possession was promised by 28 Nov 2021.
At a glance
Project
- NameRIDDHI SIDDHI HEIGHTS
- TypeOthers
- Location
- Tapowan Main Road
- Surya Nagar
- Ahmadnagar (M Corp.)
- Nagar
- Ahmednagar
- 414003
- Pincode414003
- RERA no.P52200021217
- ReraGenie IDRG-MH-83889
Builder
- NameRIDDHI SIDDHI BUILDERS AND PROMOTERS
- Entity typePartnership
- PartnerMrs Meena Harish Harwani
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Jun 2019
- Promised completion28 Nov 2021
- Revised completionNone
- Buildings1 building record
- Documents filed19 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RIDDHI SIDDHI HEIGHTS | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
RIDDHI SIDDHI HEIGHTS: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 2 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| LIFT WITH Battery Backup | Yes | 0% |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHAHNAWAZ RAFIK SHAIKH |
| Engineer | SALIM MASUM SHAIKH |
| Chartered Accountant | CHANDRABHAN LAKHMICHAND MADHYAN |
| Partner | Role in project |
|---|---|
| RIDDHI SIDDHI BUILDERS AND PROMOTERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 May 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Apr 2023
Documents filed19
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 2 May 2023 |
| Declaration about Commencement CertificateFile: Declaration of Commencement.pdf | 21 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 21 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 20 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: CHS Certificate.pdf | 20 Apr 2023 |
| Status of ConveyanceFile: First Meeting for Conveyance.pdf | 20 Apr 2023 |
| Layout approvalFile: Layout Plan.pdf | 25 May 2019 |
| Copy of the legal title reportFile: Search Report- Up dated.pdf | 25 May 2019 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 25 May 2019 |
| Certificates of CA (Form 3)File: CA Certificate Form- 3.pdf | 25 May 2019 |
| Proforma of Allotment letterFile: Agreement for Sale R S Height RERA Act.pdf | 25 May 2019 |
| Building plan approvalFile: Building plan.pdf | 17 May 2019 |
| PAN CardFile: Pan card.pdf | 17 May 2019 |
| Copy of the legal title reportFile: Search Report.pdf | 17 May 2019 |
| Details of encumbrancesFile: Encumbrabce Certificate.pdf | 17 May 2019 |
| Building Plan Approval (IOD)File: Building plan.pdf | 17 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Building commencement Certificate.pdf | 17 May 2019 |
| Declaration in FORM BFile: Form B-.pdf | 17 May 2019 |
| OtherFile: 7-12.pdf | 17 May 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ahmednagar
Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 19 filed documents as one ZIP, foldered, with a manifest
Keep RIDDHI SIDDHI HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Surya Nagar490+ in Ahmednagar
ARUNAM HIGH STREET & RESIDENCES
HARSHAL SANTOSH BHANDARI
SKY COURT
ASPIRE CONSTRUCTIONS LLP
INDU PAVILION
SOLUTIIONEYES CONSULTANCY SERVICESS & CONS
TRIDENT
Makarand Madhav Kulkarni
ELITE 18
NILAYA GROUP
SHAM SUNDER PALACE
KRUSHNA CONSTRUCTION AND LAND DEVELOPERS
See every Ahmednagar project, with the district possession charts
Builder: RIDDHI SIDDHI BUILDERS AND PROMOTERS
RIDDHI SIDDHI BUILDERS AND PROMOTERS has 1 registration on MahaRERA, including RIDDHI SIDDHI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ahmednagar district page.
Frequently asked questions
What are my rights if RIDDHI SIDDHI HEIGHTS is delayed beyond 28 Nov 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RIDDHI SIDDHI HEIGHTS?
The registered promoter entity is RIDDHI SIDDHI BUILDERS AND PROMOTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RIDDHI SIDDHI HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RIDDHI SIDDHI HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RIDDHI SIDDHI HEIGHTS?
The professionals named in the filing: Architect: SHAHNAWAZ RAFIK SHAIKH; Engineer: SALIM MASUM SHAIKH; Chartered Accountant: CHANDRABHAN LAKHMICHAND MADHYAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RIDDHI SIDDHI HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback