ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Rhythm

Registration lapsed Litigation declared Commercial project

Rhythm

By Aradhana Lifespace LLP

RG-MH-28266 · RERA P51700025397 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
5 of 77Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Rhythm is a Commercial project by Aradhana Lifespace LLP in Thane, Maharashtra, registered with MahaRERA as P51700025397 on 21 May 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 72 of the 77 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameRhythm
  • TypeCommercial
  • Location
    • Veer Savarkar Road
    • Thane West
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700025397
  • ReraGenie IDRG-MH-28266

Builder

  • NameAradhana Lifespace LLP
  • Entity typeOthers
  • Named personsKushal Shah, Akruti Nirman Pvt Limited

Key dates

4 months past promisethis monthRegisteredMay 2020PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 May 2020
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

94%72 of 77 units booked
69.2%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rhythm Phase 1NA141307777

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Rhythm Phase 1: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed434

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots434
Closed/Covered102
Open Space332

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area935 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Sep 2025

Approvals and building plan

Sanctioning authorityTMC
Permissible FSI5223.5
Proposed, not sanctioned2,781 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSantazcruz East
Estimated costRs 48.04 cr
Cost incurredRs 33.24 cr
Work done69.2%
BuildingWingEstimatedIncurred
Rhythm Phase 1NARs 33.45 crRs 32.17 cr
-NARs 14.59 crRs 1.07 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMoloy Bakshi
EngineerEpicons Consultants pvt ltd
EngineerRajeevan Paramban
Chartered AccountantSanket R Shah & Associates
Chartered AccountantK A Mehta & Associates
PartnerRole in project
Aradhana Lifespace LLP-

Litigation declared2

CaseCourtStatus
1042/2021High CourtOngoing
2276/2021Superitendent of Land Records ThaneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 May 2024

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form -I Aradhana.pdf22 Jun 2026
Withdrawal Update Form 2File: FORM -II RHYTHM.pdf22 Jun 2026
Withdrawal Update Form 3File: FORM - III Signed.pdf22 Jun 2026
Withdrawal Update Form 1File: Form_1_P51700025397 - Rhythm ( Aaradhana ).pdf2 Apr 2026
Withdrawal Update Form 2File: Engineers Certificate - Aradhana- Dec 25 (1).pdf2 Apr 2026
Withdrawal Update Form 3File: RHYTHM.pdf2 Apr 2026
Withdrawal Update Form 1File: P51700025397 - Rhythm ( Aaradhana ) (2).pdf17 Nov 2025
Withdrawal Update Form 2File: Form-2 Engineering certificate - Rhythm - Sep 25.pdf17 Nov 2025
Withdrawal Update Form 3File: Rhythm Form-3_Final.pdf17 Nov 2025
Form 5 (FY 2024-2025)File: Rhythm_Form-5.pdf4 Oct 2025
Withdrawal Update Form 1File: Architect Certificate_Rhythm_June 25.pdf4 Sep 2025
Withdrawal Update Form 2File: Engg Certificate-Rhythm_June 25.pdf4 Sep 2025
Withdrawal Update Form 3File: CA Form III_Rhythm_June 25.pdf4 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51700025397 - Rhythm ( Aaradhana ) (1).pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Sep 24 Aradhana (1).pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RHYTHM FORM 3 SEP 2024.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AARADHANA FORM 5 MARCH 2024.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51700025397 - Rhythm ( Aaradhana ).pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - ARADHANA.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE MARCH 24.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE JUNE 24.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51700025397 - Rhythm Aaradhana.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form III_Aaradhana.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RHYTHM DEC-2023 FORM 3.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARADHANA FORM-3 MARCH 2024.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aradhana.pdf18 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DocScanner 15 May 2024 18-40.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51700025397 - RHYTHM (3).pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51700025397 - RHYTHM (2).pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51700025397 - RHYTHM (1).pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Aradhana - June 23.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate - Sep 23 - Rhythm (1).pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: aradhaa form 3 June-2023.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aradhana Form-3 Sep-2023.pdf8 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Rhythm_FY 22-23.pdf8 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Aradhana 11th floor permission and CC dtd 14032023-letter.pdf11 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - ARADHANA - MARCH 23.pdf11 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rhythm Arch Certificate_June 22.pdf7 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: seventh rera certificate.pdf7 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51700025397 - RHYTHM.pdf7 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P51700025397 - RHYTHM.pdf7 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_QA Certificate_Rhythm_Mar 22.pdf7 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aradhana Form 2A.pdf7 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RHYTHM FORM 3 Dec-2022 (1).pdf7 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rhythm March-23 Form 3.pdf7 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate -Mar 21 - Rhythm (1).pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rhythm - Mar 22.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - June 22 - Aradhana.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERTIFICATE Rhythm Sep 22.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RHYTHM FORM 3 Dec-2022.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARADHANA FORM 3 JUN-2022.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARADHANA FORM 3 SEP-2022.pdf31 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: AARADHANA FORM 5 (1).pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rhythm_Arch Cert_Mar 22_0001.pdf8 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aradhana Form-3 March-2022_compressed-compressed.pdf8 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Arch certificate rhythm_compressed.pdf17 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE ARADHNA RHYTHM GROUND FLOOR TO 11 FLOOR.pdf17 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ARADHANA QUALITY CERTIFICATE.pdf17 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Aradhana CC Copy.pdf14 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Aradhana CC12012022.pdf14 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - Rhythm - Dec 2021 - Final.pdf10 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rhythm_Form V.pdf29 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rhythm rera certificate_compressed.pdf13 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Rhythm - Sep 21.pdf12 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rhythm_CA Form III_Sept 21.pdf9 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rhythm Mar 31, 2021_0001.pdf19 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rhythm June 30, 2021_0001.pdf19 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rhythm Architect Certificate.pdf9 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate -Rhythm.pdf9 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf9 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III-Rhythm.pdf9 Mar 2021
Details of Restarting of Construction work post lockdownFile: Rhythm.pdf31 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: CC All Page.pdf14 May 2020
OtherFile: LLP Agreement 21-02-2020 - com.pdf14 May 2020
Details of encumbrancesFile: Encumbrance.pdf21 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - Rhythm Gr Flr - Ph I.pdf21 Mar 2020
Declaration in FORM BFile: Aaradhana Form B 2_1MB.pdf19 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2.pdf19 Mar 2020
Layout approvalFile: Aradhana IOD 14032020 Shabana1MB.pdf18 Mar 2020

How this compares with Thane

94%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rhythm on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane West7,600+ in Thane

2 kmRhythmCompleted 112Lapsed / revoked 75Other 150Dot size: filed unitsN

Filed coordinates, straight-line distance. 337 registered projects within 2 km.

Builder: Aradhana Lifespace LLP

Aradhana Lifespace LLP has 1 registration on MahaRERA, including Rhythm. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Rhythm shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Rhythm is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rhythm?

The registered promoter entity is Aradhana Lifespace LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rhythm?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rhythm?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rhythm?

The professionals named in the filing: Architect: Moloy Bakshi; Engineer: Epicons Consultants pvt ltd; Engineer: Rajeevan Paramban; Chartered Accountant: Sanket R Shah & Associates; Chartered Accountant: K A Mehta & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rhythm?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rhythm. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rhythm to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.