ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / REYANSH INFINITY

Registered No litigation declared Others project

REYANSH INFINITY

By REYANSH INFRATECH (RAJHANS)

RG-MH-23433 · RERA P51800078745 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
4 of 7Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

REYANSH INFINITY is a Others project by REYANSH INFRATECH (RAJHANS) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078745 on 9 Jan 2025. Possession is promised by 31 Dec 2029. 3 of the 7 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameREYANSH INFINITY
  • TypeOthers
  • Location
    • MSD AT PLOT NO.102
    • LIBERTY GARDEN
    • ROAD NO.1
    • MALAD(WEST)
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • RERA no.P51800078745
  • ReraGenie IDRG-MH-23433

Builder

  • NameREYANSH INFRATECH (RAJHANS)
  • Entity typePartnership
  • PartnerKARAN SINAI

Key dates

this monthRegisteredJan 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Jan 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

43%3 of 7 units booked
26.3%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
REYANSH INFINITYNA54617

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

REYANSH INFINITY: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area543 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Dec 2025
LandownerVillageDistrict
PUSHP SPARSH CHS LTDMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1245.06
Proposed, not sanctioned513 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHWAGANGA CO OP HSG. SOC. LTD.,GROUND FLOOR,MANDAPESHWAR ROAD,OPP BHAGWATI HOSPITAL, BORIVALI (W), MUMBAI-400092
Estimated costRs 8.34 cr
Cost incurredRs 2.19 cr
Work done26.33%
BuildingWingEstimatedIncurred
REYANSH INFINITYNARs 8.34 crRs 2.19 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD SHAH & ASSOCIATES
EngineerJACON BASTYAW D SOUZA
Chartered AccountantNEHALI & CO
PartnerRole in project
REYANSH INFRATECH (RAJHANS)-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate- Q4 FY 25-26.pdf23 May 2026
Withdrawal Update Form 2File: REYANSH INFINITY ENGINEER FORM 2 MARCH 26 (1).pdf23 May 2026
Withdrawal Update Form 3File: SIgned CA Certificate Reyansh infratech mar26 Dev.pdf23 May 2026
Withdrawal Update Form 1File: FORM 1 Architect Certificate Q3 FY 25-26 signed.pdf16 May 2026
Withdrawal Update Form 1File: FORM 1 Architect Certificate Q3 FY 25-26 signed.pdf16 May 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER Q3 FY 25-26 signed.pdf16 May 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER Q3 FY 25-26 signed.pdf16 May 2026
Withdrawal Update Form 3File: FORM 3 Signed CA Certificate Q3 FY 25-26 signed.pdf16 May 2026
Withdrawal Update Form 3File: FORM 3 Signed CA Certificate Q3 FY 25-26 signed.pdf16 May 2026
Withdrawal Update Form 1File: Architect Certificate- Q2 FY 25-26.pdf29 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Form 2.pdf29 Dec 2025
Withdrawal Update Form 3File: Signed CA Certificate Reyansh infratech_Sept25.pdf29 Dec 2025
Withdrawal Update Form 1File: Architect Certificate- Q1 FY 25-26.pdf15 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf15 Dec 2025
Withdrawal Update Form 3File: Signed CA Certificate Reyansh infratech_June 251.pdf15 Dec 2025
Disclosure of sold/ booked inventoryFile: Inventory disclosure signed.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Q3 FY 24-25 Signed (1).pdf31 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Reyansh infinity signed (1).pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Reyansh Infinity Engineer Form 2 Dec 24.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Form 1 Signed.pdf14 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised signed Form 3 Reyansh infratech.pdf14 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Reyansh Infinity Form 2 Signed.pdf14 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf14 Dec 2024
Other - TechnicalFile: ANNEXURE A SIGNED (3).pdf14 Dec 2024
Proforma of Agreement for saleFile: afs final.pdf14 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf14 Dec 2024
Copy of the legal title reportFile: 1 Copy of the legal title report (6) (3).pdf21 Nov 2024
Copy of the legal title reportFile: 1 Copy of the legal title report (6) (3).pdf21 Nov 2024
Deviation Report with respect to Allotment letterFile: No Deviation report allottment letter (1).pdf20 Nov 2024
Deviation Report with respect to Allotment letterFile: No Deviation report allottment letter (1).pdf20 Nov 2024
Proforma of Allotment letterFile: 16 Draft allotment letter (1).pdf19 Nov 2024
Declaration about Commencement CertificateFile: CC DEC SIGNED.pdf19 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation agreement for sale.pdf19 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation agreement for sale.pdf19 Nov 2024
Proforma of Allotment letterFile: 16 Draft allotment letter (1).pdf19 Nov 2024
Declaration about Commencement CertificateFile: CC DEC SIGNED.pdf19 Nov 2024
Building plan approvalFile: Approved IOD.pdf16 Nov 2024
Layout approvalFile: IOD Drawing (2) (2)_2-end.pdf16 Nov 2024
Layout approvalFile: IOD Drawing (2) (2)_1-1.pdf16 Nov 2024
Layout approvalFile: IOD Drawing (2) (2)_1-1.pdf16 Nov 2024
Layout approvalFile: IOD Drawing (2) (2)_2-end.pdf16 Nov 2024
Building plan approvalFile: Approved IOD.pdf16 Nov 2024
PAN CardFile: Reyansh Rajhans PAN.pdf16 Nov 2024
Details of encumbrances concerned to FinanceFile: 11 No encumbrance self declaration.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: IOD Drawing (2) (2)_1-1.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: IOD Drawing (2) (2)_2-end.pdf16 Nov 2024
Declaration in FORM BFile: 10 Form B.pdf16 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2447775_FirstCC_signed.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved IOD.pdf16 Nov 2024
CERSAI detailsFile: 12 Cersai declaration.pdf16 Nov 2024
Details of encumbrances concerned to LegalFile: 11 No encumbrance self declaration.pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest HPS.pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest MRM.pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest SHS.pdf16 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: 17 Disclosure of Loan.pdf16 Nov 2024
PAN CardFile: Reyansh Rajhans PAN.pdf16 Nov 2024
Details of encumbrances concerned to FinanceFile: 11 No encumbrance self declaration.pdf16 Nov 2024
Details of encumbrances concerned to LegalFile: 11 No encumbrance self declaration.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: IOD Drawing (2) (2)_1-1.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: IOD Drawing (2) (2)_2-end.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved IOD.pdf16 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2447775_FirstCC_signed.pdf16 Nov 2024
Declaration in FORM BFile: 10 Form B.pdf16 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: 17 Disclosure of Loan.pdf16 Nov 2024
CERSAI detailsFile: 12 Cersai declaration.pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest HPS.pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest MRM.pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest SHS.pdf16 Nov 2024

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REYANSH INFINITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD(WEST),6,700+ in Mumbai Suburban

Builder: REYANSH INFRATECH (RAJHANS)

REYANSH INFRATECH (RAJHANS) has 1 registration on MahaRERA, including REYANSH INFINITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if REYANSH INFINITY is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REYANSH INFINITY?

The registered promoter entity is REYANSH INFRATECH (RAJHANS), a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REYANSH INFINITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REYANSH INFINITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REYANSH INFINITY?

The professionals named in the filing: Architect: PRAMOD SHAH & ASSOCIATES; Engineer: JACON BASTYAW D SOUZA; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REYANSH INFINITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REYANSH INFINITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REYANSH INFINITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.