Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
5 of 11Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 154 documents Report an error

REYANSH APARTMENTS is a Residential / Group Housing project by SAPPHIRE INFRAVENTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500052239 on 2 Aug 2023. Possession is promised by 31 Dec 2026. 6 of the 11 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameREYANSH APARTMENTS
  • TypeResidential / Group Housing
  • Location
    • CENTRAL ROAD
    • LAKKADGANJ
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440008
  • Pincode440008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500052239
  • ReraGenie IDRG-MH-16335

Builder

  • NameSAPPHIRE INFRAVENTURES
  • Entity typePartnership
  • PartnersJANAK KISHOR PATEL, KISHOR DEVSI PATEL

Key dates

this monthRegisteredAug 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Aug 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed154 files

Current status

55%6 of 11 units booked
100.0%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
REYANSH APARTMENTSNA141111011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

REYANSH APARTMENTS: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered22
Open Space11

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area873 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Nov 2025
LandownerVillageDistrict
SHRI NARSHI S/O DEOSI PATEL-Bangalore
NARMADABEN NARSHI PATEL-Bangalore
SHRI RATNSHI S/O DEOSI PATEL-Bangalore
SMT GANGABEN W/O RATNASHI PATEL-Bangalore
SMT VASANTIBEN MANILAK PATEL-Bangalore
SHRI MAHESH S/O MANILAL PATEL-Bangalore
SHRI AJAY S/O MANILAL PATEL-Bangalore
SMT JETHIBEN WD/O DEOSI PATELNagpur (M Corp.)Nagpur
SHRI KISHOR S/O DEOSI PATELNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI2779.19
Proposed, not sanctioned2,779 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANKAR NAGAR, NAGPUR
Estimated costRs 7.75 cr
Cost incurredRs 7.75 cr
Work done100.0%
BuildingWingEstimatedIncurred
REYANSH APARTMENTSNARs 4.65 crRs 4.65 cr
-NARs 3.10 crRs 3.10 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJANAK KISHOR PATEL
EngineerSAURABH TAYADE
Chartered AccountantKHETA LAL SOMABHAI PATEL
Chartered AccountantR K SANGHI & ASSOCIATES
PartnerRole in project
SAPPHIRE INFRAVENTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed154

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 154 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Final Form 2A 25-26.pdf10 Jul 2026
Withdrawal Update Form 1File: Form 1 March 26.pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 March 26.pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 March 26.pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 June 26_compressed.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 March 26_compressed.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 March 26_compressed.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 March 26_compressed.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 June 26_compressed.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE - 31-03-2026_compressed.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE - 31-03-2026_compressed.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE - 31-03-2026_compressed.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 CA Certificate - 30-06-2026_compressed.pdf8 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 Sapphire FY 24-25_compressed.pdf8 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 Sapphire FY 25-26_compressed.pdf8 Jul 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf15 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf15 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf15 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf15 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf15 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf15 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf15 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf15 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf15 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate -Dec 2025_compressed.pdf8 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf8 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf8 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf8 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf8 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf8 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf8 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf8 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf8 Feb 2026
Withdrawal Update Form 3File: CA -Certificate- Dec 25_compressed.pdf8 Feb 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 07-10-2025.pdf6 Feb 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 07-10-2025.pdf6 Feb 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 07-10-2025.pdf6 Feb 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 07-10-2025.pdf6 Feb 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE 07-10-2025.pdf6 Feb 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE 07-10-2025.pdf6 Feb 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE 07-10-2025.pdf6 Feb 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE 07-10-2025.pdf6 Feb 2026
Withdrawal Update Form 3File: Ca-Certificate-September 25_compressed.pdf6 Feb 2026
Withdrawal Update Form 3File: Ca-Certificate-September 25_compressed.pdf6 Feb 2026
Withdrawal Update Form 3File: Ca-Certificate-September 25_compressed.pdf6 Feb 2026
Withdrawal Update Form 3File: Ca-Certificate-September 25_compressed.pdf6 Feb 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE JUNE 2025.pdf16 Dec 2025
Withdrawal Update Form 2File: engineer certificate --- June.pdf16 Dec 2025
Withdrawal Update Form 3File: CA CERTIFICATE -JUNE 2025_compressed.pdf16 Dec 2025
Form 1File: Architect Certificate 14-04-2025.pdf7 Dec 2025
Form 2File: Form 2 A ENGINEER CERTIFICATE_compressed.pdf7 Dec 2025
Form 3File: Form3 March 2025.pdf7 Dec 2025
Disclosure of Sold and Booked InventoryFile: Book Inventory_compressed.pdf7 Dec 2025
Withdrawal Update Form 1File: Architect Certificate 14-04-2025.pdf7 Dec 2025
Withdrawal Update Form 1File: Architect Certificate 14-04-2025.pdf7 Dec 2025
Withdrawal Update Form 2File: Form 2 A ENGINEER CERTIFICATE_compressed.pdf7 Dec 2025
Withdrawal Update Form 2File: Form 2 A ENGINEER CERTIFICATE_compressed.pdf7 Dec 2025
Withdrawal Update Form 3File: Form3 March 2025.pdf7 Dec 2025
Withdrawal Update Form 3File: Form3 March 2025.pdf7 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 FY 23-24_compressed.pdf7 Dec 2025
Form 1File: ARCHITECTS CERTIFICATE 30-09-2024.pdf28 Nov 2025
Form 2File: Engineer certificate Sept 24.pdf28 Nov 2025
Form 3File: CA CERTIFICATE 30-09-2024.pdf28 Nov 2025

How this compares with Nagpur

55%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REYANSH APARTMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LAKKADGANJ2,800+ in Nagpur

2 kmREYANSH APARTMENTSCompleted 8Lapsed / revoked 15Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: SAPPHIRE INFRAVENTURES

SAPPHIRE INFRAVENTURES has 1 registration on MahaRERA, including REYANSH APARTMENTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if REYANSH APARTMENTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REYANSH APARTMENTS?

The registered promoter entity is SAPPHIRE INFRAVENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REYANSH APARTMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REYANSH APARTMENTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REYANSH APARTMENTS?

The professionals named in the filing: Architect: JANAK KISHOR PATEL; Engineer: SAURABH TAYADE; Chartered Accountant: KHETA LAL SOMABHAI PATEL; Chartered Accountant: R K SANGHI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REYANSH APARTMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REYANSH APARTMENTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REYANSH APARTMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.