ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / REGENT GRANDEUR

Registration lapsed No litigation declared Others project

REGENT GRANDEUR

By Regent Associates

RG-MH-30704 · RERA P51800032790 · Last updated on MahaRERA portal: 21 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Installation of Lifts, 95%
21 of 85Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

REGENT GRANDEUR is a Others project by Regent Associates in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032790 on 29 Jan 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 64 of the 85 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameREGENT GRANDEUR
  • TypeOthers
  • Location
    • CAVES ROAD
    • Jogeshwari (East)
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800032790
  • ReraGenie IDRG-MH-30704

Builder

  • NameRegent Associates
  • Entity typePartnership
  • PartnersVikash Mohan Jhanwer, KIran Poonamchand Mali
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredJan 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Jan 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

75%64 of 85 units booked
96.1%Work done, per cost certificate

Figures as on 21 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
REGENT GRANDEURNA1916572885

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

REGENT GRANDEUR: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 21 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area886 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Dec 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4700.31
Proposed, not sanctioned4,700 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchX21, Options Primo, MIDC cross road no 21, Marol, Andheri East, Mumbai 400093
Estimated costRs 21.00 cr
Cost incurredRs 20.19 cr
Work done96.14%
BuildingWingEstimatedIncurred
REGENT GRANDEURNARs 16.50 crRs 16.50 cr
-NARs 4.50 crRs 3.69 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Arun Kumar Dube
EngineerFrames
Chartered AccountantL J Kothari & Co
PartnerRole in project
Regent Associates-

Litigation declared1

CaseCourtStatus
200546/2004Small Cause Court BandraSettled and Disposed off

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2021-2022)File: Form-5 - Regent Associate.pdf21 Jan 2026
Form 5 (FY 2022-2023)File: Regent - Form 5 - Compressed.pdf21 Jan 2026
Form 5 (FY 2023-2024)File: RERA Audit Form 5 - 30-09-2024.pdf21 Jan 2026
Form 5 (FY 2024-2025)File: RA - Form 5 2024-25.pdf21 Jan 2026
Withdrawal Update Form 1File: RA - RERA Architect Certificate QE Sept 2025.pdf7 Jan 2026
Withdrawal Update Form 2File: Engi Certificate - 07-01-2024.pdf7 Jan 2026
Withdrawal Update Form 3File: Regent Associates - RERA Certificate 31-12-2023.pdf7 Jan 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Audit Form 5 - 30-09-2024.pdf8 Feb 2025
Building plan approvalFile: RA - Regent Grandeur Full IOD_compressed.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RA - RERA Architect Certificate QE Dec 24.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RA - RERA CA Certificate QE Dec 24.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RA - RERA Engi Certificate QE Dec 24.pdf7 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: RA - Regent Grandeur Full CC.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: RA - Regent Grandeur Full IOD_compressed.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RA- Architect certificate QE March 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RA- Architect certificate QE June 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RA - RERA Architect Certificate QE Sept 24.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RA- Engineer certificate QE March 2024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RA- Engineer certificate QE June 2024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RA - RERA CA Certificate QE Sept 24.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RA- Engineer certificate QE March 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RA- Engineer certificate QE June 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RA - RERA Engi Certificate QE Sept 24.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RA- Quality Assurance certiifcate FY 2023-24.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - 06-10-2023.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - 05-01-2023.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Certificate - 07-10-2023.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Certificate - 07-01-2024.pdf21 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Regent Associates - Form 2A (26-06-2023).pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Regent Associates - RERA Certificate 30-09-2023.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Regent Associates - RERA Certificate 31-12-2023.pdf21 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Regent - Form 5.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Final.pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RA Architect Certifcate - 06-07-2023.pdf19 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Certificate - 10-04-2023 Final.pdf19 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RA Engineer Certifcate - 06-07-2023.pdf19 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Final.pdf19 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RA CA Certificate - 06-07-2023.pdf19 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 - Regent Associate.pdf23 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certficate.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate.pdf22 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 17-11-22.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 05-01-2023.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Other interest.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA CERTIFICATE Final.pdf13 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf13 Jun 2022
Declaration about Commencement CertificateFile: DEcl for CC-Form D-Dastur.pdf17 Jan 2022
CERSAI detailsFile: CERSAI Undertaking.pdf12 Jan 2022
Proforma of Allotment letterFile: RERA Agreement for Sale Final Dastur.pdf12 Jan 2022
Proforma of Allotment letterFile: RERA Allotment letter Final Dastur.pdf12 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: CC dated 6 Jan 2022.pdf7 Jan 2022
Building plan approvalFile: IOD 1.pdf1 Nov 2021
Building plan approvalFile: IOD 2.pdf1 Nov 2021
Building plan approvalFile: IOD 3.pdf1 Nov 2021
Building plan approvalFile: IOD 4.pdf1 Nov 2021
Building plan approvalFile: IOD 5.pdf1 Nov 2021
Building plan approvalFile: IOD 6.pdf1 Nov 2021
Copy of the legal title reportFile: Title Certificate.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD 1.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD 2.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD 3.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD 4.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD 5.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD 6.pdf1 Nov 2021
Details of encumbrancesFile: Letter for Encumbrances.pdf23 Sep 2021
Declaration about Commencement CertificateFile: CC Declaration - Format D.pdf23 Sep 2021
Layout approvalFile: CTS Plan.pdf20 Sep 2021
Building plan approvalFile: IOD dated 17-08-21.pdf20 Sep 2021
Building plan approvalFile: IOD dated 07-01-21.pdf20 Sep 2021
PAN CardFile: Regent Associates - Pan Crad.pdf20 Sep 2021
Copy of the legal title reportFile: Title Certificate.pdf20 Sep 2021
Copy of Layout Approval (in case of layout)File: CTS Plan.pdf20 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD dated 17-08-21.pdf20 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD dated 07-01-21.pdf20 Sep 2021
Declaration in FORM BFile: Affidavit Cum Declaration.pdf20 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate.pdf20 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Sep 2021

How this compares with Mumbai Suburban

75%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REGENT GRANDEUR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jogeshwari (East)6,700+ in Mumbai Suburban

2 kmREGENT GRANDEURCompleted 104Lapsed / revoked 62Abeyance 1Other 130Dot size: filed unitsN

Filed coordinates, straight-line distance. 297 registered projects within 2 km.

Builder: Regent Associates

Regent Associates has 2 registrations on MahaRERA, including REGENT GRANDEUR and ADVENT NEEL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that REGENT GRANDEUR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if REGENT GRANDEUR is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REGENT GRANDEUR?

The registered promoter entity is Regent Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REGENT GRANDEUR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REGENT GRANDEUR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REGENT GRANDEUR?

The professionals named in the filing: Architect: Ar. Arun Kumar Dube; Engineer: Frames; Chartered Accountant: L J Kothari & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REGENT GRANDEUR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REGENT GRANDEUR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REGENT GRANDEUR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.