Home / Browse projects / Thane, Maharashtra / REGENCY PARK PHASE II BUILDING NO F

Registered No litigation declared Others project

REGENCY PARK PHASE II BUILDING NO F

By SAB VENTURES

RG-MH-18064 · RERA P51700056270 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Stilt Floor, 50%
193 of 371Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

REGENCY PARK PHASE II BUILDING NO F is a Others project by SAB VENTURES in Thane, Maharashtra, registered with MahaRERA as P51700056270 on 22 May 2024. Possession is promised by 31 Dec 2029. 178 of the 371 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameREGENCY PARK PHASE II BUILDING NO F
  • TypeOthers
  • Location
    • NETIVALI
    • Kalyan
    • Thane
    • 421306
  • Pincode421306
  • RERA no.P51700056270
  • ReraGenie IDRG-MH-18064

Builder

  • NameSAB VENTURES
  • Entity typePartnership
  • PartnersYUSUF ABBASBHAI ZOJWALLA, ANWARALI RAMJANKHA CHOPDAR, ALIAKBAR YUSUF ZOJWALLA, MURTUZA NAJMUDDIN BHETASIWALA, JOHAR HASAN ZOJWALLA
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMay 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

48%178 of 371 units booked
18.9%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
REGENCY PARK PHASE II BUILDING NO FNA262334130371

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

REGENCY PARK PHASE II BUILDING NO F: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor50%
Slabs of Super Structure37%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks29%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed348

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots348
Closed/Covered90
Open Space258

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,501 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Aug 2025
LandownerVillageDistrict
MR JOHAR HASAN ZOJWALLA-Mumbai City

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI38263.58
Proposed, not sanctioned19,066 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLOKVATIKA , NETIVILI, KALYAN E POST OFFICE , KALYAN, 421306
Estimated costRs 118.79 cr
Cost incurredRs 22.50 cr
Work done18.94%
BuildingWingEstimatedIncurred
REGENCY PARK PHASE II BUILDING NO FNARs 115.22 crRs 22.50 cr
-NARs 3.56 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCREATIONS
EngineerASSOCIATED STRUCTURAL ENGINEERS LLP
Chartered AccountantMUKESH GURNANI
Chartered Accountantpradeep bijlani
PartnerRole in project
SAB VENTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf15 May 2026
Withdrawal Update Form 2File: Engineer Certificate Q4 Updated.pdf15 May 2026
Withdrawal Update Form 3File: form 3.pdf15 May 2026
Withdrawal Update Form 1File: form 1.pdf2 Apr 2026
Withdrawal Update Form 2File: form 2.pdf2 Apr 2026
Withdrawal Update Form 3File: form 3.pdf2 Apr 2026
Withdrawal Update Form 1File: form 1.pdf20 Oct 2025
Withdrawal Update Form 2File: form 2.pdf20 Oct 2025
Withdrawal Update Form 3File: form 3.pdf20 Oct 2025
Withdrawal Update Form 1File: form 1.pdf17 Oct 2025
Withdrawal Update Form 2File: form 2 (1).pdf17 Oct 2025
Withdrawal Update Form 3File: form 3.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Signed Form 5 SAB VENTURES.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: Engineer Certificate for Quality Assurance Updated.pdf11 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Q4.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf2 Dec 2024
Proforma of Agreement for saleFile: sale agreement master file.pdf18 Nov 2024
Proforma of Agreement for saleFile: sale agreement master file.pdf18 Nov 2024
Layout approvalFile: Plans_1-1.pdf19 Oct 2024
Layout approvalFile: Plans_2-2.pdf19 Oct 2024
Layout approvalFile: Plans_3-3.pdf19 Oct 2024
Layout approvalFile: Plans_4-end.pdf19 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans_1-1.pdf19 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans_2-2.pdf19 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans_3-3.pdf19 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans_4-end.pdf19 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf19 Oct 2024
Proforma of Agreement for saleFile: sale agreement master file.pdf19 Oct 2024
Other - TechnicalFile: clarification letter.pdf2 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 2 Other - Technical.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Yusuf zojwalla.pdf30 Apr 2024
Other - LegalFile: deed of convayance_1-14.pdf30 Apr 2024
Other - LegalFile: deed of convayance_15-28.pdf30 Apr 2024
Other - LegalFile: deed of convayance_29-end.pdf30 Apr 2024
Other - LegalFile: नेतिवली_2_3_Satbara.pdf30 Apr 2024
Other - LegalFile: नेतिवली_2_4_Satbara.pdf30 Apr 2024
Other - LegalFile: नेतिवली_2_5_1_Satbara.pdf30 Apr 2024
Other - LegalFile: नेतिवली_2_5_2_Satbara.pdf30 Apr 2024
Other - LegalFile: नेतिवली_3_अ_1_3_अ_Satbara.pdf30 Apr 2024
Other - LegalFile: नेतिवली_4_ब_1_Satbara.pdf30 Apr 2024
Other - LegalFile: नेतिवली_39_अ_Satbara.pdf30 Apr 2024
Other - LegalFile: नेतिवली_40_1_Satbara.pdf30 Apr 2024
Other - LegalFile: नेतिवली_40_2_Satbara.pdf30 Apr 2024
Other - TechnicalFile: plans highlighted regency.pdf30 Apr 2024
Other - TechnicalFile: Annexure A decl cum.pdf29 Apr 2024
Other - TechnicalFile: Suddhi patrak survey 40 1 and 2.pdf29 Apr 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (19) (1).pdf28 Mar 2024
Proforma of Allotment letterFile: Allotment letter.pdf28 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation report on allotment.pdf28 Mar 2024
Deviation Report with respect to model copy of AgreementFile: deviation report on agreement of sale (1).pdf28 Mar 2024
Building plan approvalFile: CC.pdf27 Mar 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (8) (1).pdf27 Mar 2024
PAN CardFile: Sab Ventures Pan.pdf27 Mar 2024
Copy of the legal title reportFile: Title Report.pdf27 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumbranc declaration.pdf27 Mar 2024
Details of encumbrances concerned to LegalFile: No Encumbranc declaration.pdf27 Mar 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (8) (1).pdf27 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: CC.pdf27 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf27 Mar 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf27 Mar 2024
Declaration in FORM BFile: Form B.pdf27 Mar 2024
CERSAI detailsFile: Cersai Declaration.pdf27 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (14).pdf27 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Anwar ali chopdar.pdf27 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Aliakbar Zojwalla.pdf27 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Johar Zojwalla.pdf27 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Murtuza bhetasiwala.pdf27 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank letter.pdf27 Mar 2024

How this compares with Thane

48%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REGENCY PARK PHASE II BUILDING NO F on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NETIVALI7,600+ in Thane

Builder: SAB VENTURES

SAB VENTURES has 2 registrations on MahaRERA, including REGENCY PARK PHASE 1 and REGENCY PARK PHASE II BUILDING NO F. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if REGENCY PARK PHASE II BUILDING NO F is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REGENCY PARK PHASE II BUILDING NO F?

The registered promoter entity is SAB VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REGENCY PARK PHASE II BUILDING NO F?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REGENCY PARK PHASE II BUILDING NO F?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REGENCY PARK PHASE II BUILDING NO F?

The professionals named in the filing: Architect: CREATIONS; Engineer: ASSOCIATED STRUCTURAL ENGINEERS LLP; Chartered Accountant: MUKESH GURNANI; Chartered Accountant: pradeep bijlani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REGENCY PARK PHASE II BUILDING NO F?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REGENCY PARK PHASE II BUILDING NO F. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REGENCY PARK PHASE II BUILDING NO F to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.