Home / Browse projects / Thane, Maharashtra / REGENCY BUSINESS PARK PHASE I

Registered Litigation declared Commercial project

REGENCY BUSINESS PARK PHASE I

By REGENCY SHELTERS LLP

RG-MH-06438 · RERA P51700053811 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 18 months from the original
11 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
343 of 405Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

REGENCY BUSINESS PARK PHASE I is a Commercial project by REGENCY SHELTERS LLP in Thane, Maharashtra, registered with MahaRERA as P51700053811 on 1 Dec 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 18 months from the original filing. 62 of the 405 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete.

At a glance

Project

  • NameREGENCY BUSINESS PARK PHASE I
  • TypeCommercial
  • Location
    • Kolshet
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053811
  • ReraGenie IDRG-MH-06438

Builder

  • NameREGENCY SHELTERS LLP
  • Entity typePartnership
  • LLPINAAD-0716
  • GSTIN27AARFR8972R1ZQ
  • LLPIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersREGENCY NIRMAN LIMITED REGENCY NIRMAN LIMITED, SUBHASH SATYANARAYAN KHAIRARI
  • Other registrations4 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2023First promiseJun 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2025)
  • Buildings2 building records
  • Documents filed77 files

Current status

15%62 of 405 units booked
79.6%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 3NA870184184
Building No 4NA760221221

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

Building No 378%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Building No 471%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed776

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots776
Closed/Covered776
BuildingClosed/CoveredTotal
Building No 3343343
Building No 4433433

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,420 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI23943.17
Proposed, not sanctioned23,544 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSARASWAT BANK OPP VISHNU DARSHAN APARTMENT NEAR AMAN TALKIES ULHASNAGAR 421002
Estimated costRs 70.24 cr
Cost incurredRs 55.90 cr
Work done79.59%
BuildingWingEstimatedIncurred
Building No 4NARs 36.09 crRs 26.65 cr
Building No 3NARs 34.14 crRs 29.25 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEN FOLDS ARCHITECTS & CONSULTANTS
EngineerBRIJBHAN YADAV
EngineerSahadeo Vijay Korgaonkar
Chartered AccountantAJAY HASSIJA & ASSOCIATES
Chartered AccountantNitin Gobindram Kukreja
Chartered AccountantSURESH U RADHAKRISHNANI
PartnerRole in project
REGENCY SHELTERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018312Jun 2025 → Dec 2026

Reason as filed by the promoterAs per the terms & conditions of Accomodation Reservation Policy by UDCPR, we are required to handover the amenities in the form of Shopping Center & Bus Depot to the Thane Municipal Corporation before applying for the completion certificate from them. Occupation Certificate will be granted after handing over of the amenities only. However the agreement is yet to be finalized by the Thane Municipal Corporation. Hence we request you to kindly grant us the extension of proposed date for completion of project for Building no. 3 as 30/06/2026 and for Building no. 4 as 31/12/2026

Litigation declared6

CaseCourtStatus
663/2022/2022CIVIL JUDGE THANEpending till next hearing date
531/2023/2023Bombay High CourtClosed
13213/2023/2023Bombay High CourtClosed
14678/2023/2023Bombay High CourtClosed
663/2022/2022CIVIL JUDGE THANEOngoing
12426/2023Bombay High CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 30-06-2026 QUARTER 1 FORM 1.pdf19 Jun 2026
Withdrawal Update Form 1File: 30-09-2025 QUARTER 2 FORM 1.pdf19 Jun 2026
Withdrawal Update Form 1File: 31-12-2025 QUARTER 3 FORM 1.pdf19 Jun 2026
Withdrawal Update Form 1File: 31-03-2026 QUARTER 4 FORM 1.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 Q1 Phase I.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 Q2 Phase I.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 Q3 Phase I.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 Q4 Phase I.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 Q1 Phase I.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 Q2 Phase I.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 Q3 Phase I.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 Q4 Phase I.pdf19 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 03.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 04.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 300624 - converted.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 300924 - converted.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 311224 - converted.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 310325 - converted.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BLDG 3.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BLDG 4.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate B 3 and 4 signed form 1.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: REGENCY SHELTERS LLP FORM 5 FY 23-24.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD- UNSOLD INVENTORY.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 folds-architect certificate- bldg no-3.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 folds-architect certificate- bldg no-4.pdf20 Apr 2024
Other - TechnicalFile: ENGINEER'S CERTIFICATE FOR QUALITY ASSUARANCE.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Regency Shelters CA Certificate.pdf21 Nov 2023
Building plan approvalFile: 1st to 5th Floor.pdf7 Nov 2023
Building plan approvalFile: 6th and 7th Floor.PDF7 Nov 2023
Building plan approvalFile: Parking Plan.pdf7 Nov 2023
Building plan approvalFile: BUA Certificate.pdf7 Nov 2023
Layout approvalFile: Shelter Layout.pdf7 Nov 2023
Layout approvalFile: Declaration about project area.pdf7 Nov 2023
Building plan approvalFile: Basement and Ground Floor.pdf7 Nov 2023
Copy of Layout Approval (in case of layout)File: Shelter Layout.pdf7 Nov 2023
Copy of Layout Approval (in case of layout)File: Declaration about project area.pdf7 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 1st to 5th Floor.pdf7 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 6th and 7th Floor.PDF7 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Parking Plan.pdf7 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: BUA Certificate.pdf7 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Basement and Ground Floor.pdf7 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development (1).pdf19 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development.pdf19 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Appendix F.pdf25 Sep 2023
Copy of the legal title reportFile: 1_Regency Shelters title certificate 250723.pdf5 Sep 2023
Copy of the legal title reportFile: 1-1_Supplementary Title certificate.pdf5 Sep 2023
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf5 Sep 2023
Copy of the legal title reportFile: 2 Copy of the legal title report.pdf5 Sep 2023
Copy of the legal title reportFile: 3 Copy of the legal title report.pdf5 Sep 2023
Copy of the legal title reportFile: 4 Copy of the legal title report.pdf5 Sep 2023
Details of encumbrances concerned to FinanceFile: 2_Status Report_Regency Shelters LLP_07-08-2023_.pdf5 Sep 2023
Details of encumbrances concerned to LegalFile: 2_Status Report_Regency Shelters LLP_07-08-2023_.pdf5 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: 10_CC Revalidation.pdf5 Sep 2023
Declaration about Commencement CertificateFile: 12_Format - D (Declaration about commencement certifiacate).pdf5 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf5 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-1_ENGINEER'S CERTIFICATE.pdf5 Sep 2023
CERSAI detailsFile: 6_Latest CERSAI Report.pdf5 Sep 2023
Deviation Report with respect to Allotment letterFile: 5 No Deviation Declaration - for Allottment Letter.pdf5 Sep 2023
PAN CardFile: 14 -shelters pancard.PDF2 Aug 2023
Details of encumbrances concerned to FinanceFile: 04 SELF DECLARATION REGARDING ENCUMBRANCE.pdf2 Aug 2023
Details of encumbrances concerned to LegalFile: 04 SELF DECLARATION REGARDING ENCUMBRANCE.pdf2 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 08 -1 CC Letter 22032022.pdf2 Aug 2023
Declaration in FORM BFile: 07 Form B.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANIL JESSARAM BHATIJA.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MAHESH S KHAIRARI.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MANISHA A AGARWAL.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MANOJ LALPURIA.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: NIRAJ SHARMA.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RAKESH R KALWANI.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RAMKISHORE S KHAIRARI.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SUBHASH S KHAIRARI.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: UDHAV RUPCHANDANI.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: VICKY RUPCHANDANI.pdf2 Aug 2023
Proforma of Agreement for saleFile: Draft Agreement for sale.pdf2 Aug 2023
Proforma of Allotment letterFile: Model format of allottment letter.pdf2 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declarion about saperate bank account for Rera.pdf2 Aug 2023
Deviation Report with respect to model copy of AgreementFile: 26 -Deviation_Report .pdf2 Aug 2023

How this compares with Thane

15%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REGENCY BUSINESS PARK PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolshet7,600+ in Thane

2 kmREGENCY BUSINESS PARK PHCompleted 62Lapsed / revoked 14Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 100 registered projects within 2 km.

Builder: REGENCY SHELTERS LLP

REGENCY SHELTERS LLP has 5 registrations on MahaRERA, including REGENCY BUSINESS PARK PHASE I and REGENCY BUSINESS PARK PHASE II. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if REGENCY BUSINESS PARK PHASE I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REGENCY BUSINESS PARK PHASE I?

The registered promoter entity is REGENCY SHELTERS LLP, a partnership as per the filing. Its LLPIN AAD-0716 and GSTIN 27AARFR8972R1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REGENCY BUSINESS PARK PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REGENCY BUSINESS PARK PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REGENCY BUSINESS PARK PHASE I?

The professionals named in the filing: Architect: TEN FOLDS ARCHITECTS & CONSULTANTS; Engineer: BRIJBHAN YADAV; Engineer: Sahadeo Vijay Korgaonkar; Chartered Accountant: AJAY HASSIJA & ASSOCIATES; Chartered Accountant: Nitin Gobindram Kukreja; Chartered Accountant: SURESH U RADHAKRISHNANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REGENCY BUSINESS PARK PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REGENCY BUSINESS PARK PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REGENCY BUSINESS PARK PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.