Home / Browse projects / Mumbai Suburban, Maharashtra / Redevelopment of Parle Satam CHS Ltd

Completed No litigation declared Residential / Group Housing project

Redevelopment of Parle Satam CHS Ltd

By R R CONSTRUCTIONS

RG-MH-86573 · RERA P51800046583 · Last updated on MahaRERA portal: 29 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2025Possession promisedregistration recorded completed
1 of 11Construction stages donefurthest along: Excavation, 90%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

Redevelopment of Parle Satam CHS Ltd is a Residential / Group Housing project by R R CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046583 on 19 Aug 2022. The registration is recorded completed; possession was promised by 31 May 2025.

At a glance

Project

  • NameRedevelopment of Parle Satam CHS Ltd
  • TypeResidential / Group Housing
  • Location
    • subhash road
    • vile parle east
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046583
  • ReraGenie IDRG-MH-86573

Builder

  • NameR R CONSTRUCTIONS
  • Entity typePartnership
  • PartnerRAHUL S RAJWADE
  • Other registrations6 more →
  • Completed6 of 7
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2022PromisedMay 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2022
  • Promised completion31 May 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
REDEVELOPMENT OF PARLE SATAM CHSLNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

REDEVELOPMENT OF PARLE SATAM CHSL: 71% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor85%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 29 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes20%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered1
Open Space8

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area917 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
RR CONSTRUCTIONSMumbai CityMumbai City
Parle Satam CHS LtdAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1009.53
Proposed, not sanctioned1,010 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMORESHWAR BUILDING HANUMAN ROAD

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMBER V NATEKAR
EngineerDroplet Consultant
Chartered AccountantKHANDEKAR & ASSOCIATES
PartnerRole in project
R R CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jan 2025

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: 8523-FORM-4-I-25.pdf29 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2431575_OC_signed.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RR-PS-RD-FORM-A-VI-X-23.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf13 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: CHARTERD ACCOUNTANTS CERTIFICAT R R C.pdf13 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance RR Construction.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 RRC.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE RD.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RR-PS-RD-Form-I-V-VII-23.pdf13 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate RD.pdf13 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERD ACCOUNTS CERTIFICAT R R CONSTRUTION .pdf13 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RR-PS-RD-Form-I-V-VII-23.pdf1 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate RD.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERD ACCOUNTS CERTIFICAT R R CONSTRUTION .pdf1 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A RAHUL RAJWADE RRC.pdf1 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A SWAPNA RAJWADE RRC.pdf1 Aug 2023
Building plan approvalFile: IOD -3 Dated 28-04-2023 RD.pdf24 May 2023
Layout approvalFile: IOD -3 Plan Dated 28-04-2023 RD_compressed.pdf24 May 2023
Copy of Layout Approval (in case of layout)File: IOD -3 Plan Dated 28-04-2023 RD_compressed.pdf24 May 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD -3 Dated 28-04-2023 RD.pdf24 May 2023
Disclosure of sold/ booked inventoryFile: R R C Disclosure inventory F Y 22-23 Q - 2.pdf3 May 2023
Disclosure of sold/ booked inventoryFile: R R C Disclosure inventory F Y 22-23 Q - 3.pdf3 May 2023
Disclosure of sold/ booked inventoryFile: R R C Disclosure inventory F Y 22-23 Q - 4.pdf3 May 2023
Building plan approvalFile: IOD -2 Dated 15-02-2023 RD.pdf21 Apr 2023
Building plan approvalFile: IOD -2 Plan Dated 15-02-2023 RD.pdf21 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD -2 Dated 15-02-2023 RD.pdf21 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD -2 Plan Dated 15-02-2023 RD.pdf21 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC upto top of fourth floor RD.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (2).pdf21 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 8523_FurtherCC_signed.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1A-Ram Darshan-Dec-22 (1).pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Droplet Consultants Engineers Certificate.pdf15 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Droplet Consultants Engineers Certificate.pdf15 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Chartered Accountant Certificate RRC.pdf15 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH-FORM-1-OCT-22-RD.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RR.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE ( 30-09-2022 ) RD.pdf20 Oct 2022
Building plan approvalFile: IOD -1 Plan Dated 03-03-2022 RD (1)_compressed.pdf8 Aug 2022
Layout approvalFile: Approved Concession Drawing Ramdarshan (1)_compressed_compressed.pdf8 Aug 2022
Copy of Layout Approval (in case of layout)File: Approved Concession Drawing Ramdarshan (1)_compressed_compressed.pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD -1 Plan Dated 03-03-2022 RD (1)_compressed.pdf8 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment Letter (1) with date.pdf8 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report for Agreement of Sale with date.pdf8 Aug 2022
Proforma of Allotment letterFile: Allotment Letter Draft.pdf5 Aug 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate.pdf29 Jul 2022
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate- Dated.pdf29 Jul 2022
CERSAI detailsFile: Cersai Declaration With Date.pdf29 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CertificateRevised.pdf29 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Self Declaration (1).pdf29 Jul 2022
Building plan approvalFile: IOD -1 Dated 03-03-2022 RD (1).pdf18 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD -1 Dated 03-03-2022 RD (1).pdf18 Jul 2022
Declaration about Commencement CertificateFile: RRC - Format D-compressed.pdf12 Jul 2022
Proforma of Allotment letterFile: Model Agreement for sale.pdf12 Jul 2022
PAN CardFile: PAN Card.pdf11 Jul 2022
Copy of the legal title reportFile: Legal Title Report.pdf11 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: FirstCC_signed - RD (1).pdf9 Jul 2022
Declaration in FORM BFile: Form B.pdf9 Jul 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Redevelopment of Parle Satam CHS Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near vile parle east6,700+ in Mumbai Suburban

Builder: R R CONSTRUCTIONS

R R CONSTRUCTIONS has 7 registrations on MahaRERA, including Sejal Harmony and REDEVELOPMENT OF SBI EMPLOYEES KANCHAN MRIG CHS LTD.. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Redevelopment of Parle Satam CHS Ltd is delayed beyond 31 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Redevelopment of Parle Satam CHS Ltd?

The registered promoter entity is R R CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Redevelopment of Parle Satam CHS Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Redevelopment of Parle Satam CHS Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Redevelopment of Parle Satam CHS Ltd?

The professionals named in the filing: Architect: AMBER V NATEKAR; Engineer: Droplet Consultant; Chartered Accountant: KHANDEKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Redevelopment of Parle Satam CHS Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Redevelopment of Parle Satam CHS Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Redevelopment of Parle Satam CHS Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.