Completed No litigation declared Residential / Group Housing project

Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL

By BHARAT REALTY VENTURE PRIVATE LIMITED

RG-MH-96791 · RERA P51800013803 · Last updated on MahaRERA portal: 10 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL is a Residential / Group Housing project by BHARAT REALTY VENTURE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013803 on 25 Oct 2017. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameRedevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL
  • TypeResidential / Group Housing
  • Location
    • plot no.32
    • Mahaveer Nagar Kandivali West
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800013803
  • ReraGenie IDRG-MH-96791

Builder

  • NameBHARAT REALTY VENTURE PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200MH1998PTC116452
  • GSTIN27AABCB3630P1ZJ
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorAtul Ambalal Barot
  • Other registrations10 more →
  • Completed7 of 11
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

this monthRegisteredOct 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Oct 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bharat Asbury ParkNA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Bharat Asbury Park: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered50
Open Space6

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area878 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6720.0
Proposed, not sanctioned5,284 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 98 A-B Pratap Palace JN Road Mulund West Mumbai 400080

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS P Associates
ArchitectVasant B Pissay
PartnerRole in project
BHARAT REALTY VENTURE PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Sep 2021

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Tristar.pdf10 Apr 2023
Disclosure of sold/ booked inventoryFile: Tristar March 2022.pdf19 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bharat Asbury Park - Tristar form 2.pdf18 Jan 2022
Certificates of CA (Form 3)File: RERA Certificate Tristar Dec 21 Final.pdf17 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200227278086_For_Asset_Based_Search_04_01_2022_12_24_53_811.pdf4 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200227279051_For_Asset_Based_Search_04_01_2022_12_30_40_720.pdf4 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tristar Sep 2021.pdf18 Oct 2021
Disclosure of sold/ booked inventoryFile: Tristar Sep 2021.pdf18 Oct 2021
Certificates of CA (Form 3)File: RERA Certificate Tristar Sept 21.pdf18 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Tristar Sep 2021.pdf4 Oct 2021
Declaration about Commencement CertificateFile: OC Tristar.pdf21 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Completion Certificate.pdf21 Sep 2021
Status of ConveyanceFile: Reg supplementary lease deed Index II.pdf21 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate Tristar.pdf20 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Tristar.pdf18 Sep 2021
Disclosure of sold/ booked inventoryFile: Sold flat Tristar June 2021.pdf11 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tristar.pdf10 Aug 2021
Certificates of CA (Form 3)File: RERA Certificate Tristar Jun 21.pdf10 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Tristar.pdf17 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Tristar 30 June 2021.pdf12 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tristar Eng Certificate March 2021.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A Tristar June 2021.pdf12 Jul 2021
Disclosure of sold/ booked inventoryFile: Asbury Tristar.pdf12 Jul 2021
Certificates of CA (Form 3)File: RERA Certificate Tristar Mar 21.pdf12 Jul 2021
Details of encumbrancesFile: Registered Deed of Reconveyance with Centreal bank 21st June 2021 RERA.pdf3 Jul 2021
Details of encumbrancesFile: DEED OF SIMPLE MORTGAGE TATA CAPITAL 21ST AUGUST 2020 - RERA.pdf3 Jul 2021
Details of encumbrancesFile: RECONVEYANCE DEED CENTRAL BANK 21ST AUGUST 2020 RERA.pdf3 Jul 2021
Certificates of CA (Form 3)File: RERA Certificate Tristar Mar 21.pdf3 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tristar.pdf12 May 2021
Commencement Certificates / NA Order for plotted developmentFile: Further cc Tristar CHSL.pdf11 May 2021
Building plan approvalFile: Amended IOD.pdf9 Apr 2021
Building plan approvalFile: Ground Floor plan.pdf9 Apr 2021
Building plan approvalFile: 1 and 2 podium basement 3 floor plan.pdf9 Apr 2021
Building plan approvalFile: 4 to 18 floor plan.pdf9 Apr 2021
Building plan approvalFile: refuge and terrace floor plan.pdf9 Apr 2021
Building plan approvalFile: Section plan.pdf9 Apr 2021
Building Plan Approval (IOD)File: Amended IOD.pdf9 Apr 2021
Building Plan Approval (IOD)File: Ground Floor plan.pdf9 Apr 2021
Building Plan Approval (IOD)File: 1 and 2 podium basement 3 floor plan.pdf9 Apr 2021
Building Plan Approval (IOD)File: 4 to 18 floor plan.pdf9 Apr 2021
Building Plan Approval (IOD)File: refuge and terrace floor plan.pdf9 Apr 2021
Building Plan Approval (IOD)File: Section plan.pdf9 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginnering Certificate Tristar as on 31st Dec 2020.pdf12 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Tristar 31st Dec 2020.pdf11 Feb 2021
Certificates of CA (Form 3)File: Tristar CA Certificate as on 31 st Dec 2020.pdf11 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Tristar Asbury park.pdf18 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tristar 30th Sep 2020.pdf26 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tristar.pdf26 Oct 2020
Certificates of CA (Form 3)File: Tristar 30th Sep 2020.pdf26 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tristar April to June 2020.pdf1 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tristar June 2020.pdf1 Oct 2020
Certificates of CA (Form 3)File: Tristar RERA Certificate Jun 20.pdf1 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tristar Jan to march 2020.pdf24 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tristar CHSL.pdf24 Aug 2020
Certificates of CA (Form 5)File: Tristar RERA Cert Mar 20.pdf24 Aug 2020
Details of Restarting of Construction work post lockdownFile: Tristar.pdf23 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Tristar.pdf2 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tristar.pdf11 Feb 2020
Certificates of CA (Form 3)File: Tri Star.pdf4 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tristar.pdf4 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SCAN - RERA CERTIFICATE - TRISTAR.pdf19 Dec 2019
Certificates of CA (Form 3)File: CA Certificate Tristar Project.pdf18 Dec 2019
Certificates of CA (Form 3)File: CA Certificate Tristar Project.pdf18 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Tristar from 5 2018 2019_compressed.pdf12 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: (20191101)Tristar-Architect Certificate-Form 1.pdf25 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bharat Asburypark Tristar.pdf13 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bharat Asburypark Tristar.pdf13 Aug 2019
Certificates of CA (Form 5)File: Tri Star.pdf13 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TRISTAR.pdf1 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tristar EC.pdf1 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Full C C TRISTAR OWNER COPY 90519.pdf27 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tristar.pdf15 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE TRISTAR.pdf15 Jan 2019
Certificates of CA (Form 3)File: RERA Certificate TriStar.pdf15 Jan 2019
Certificates of CA (Form 5)File: Tristar Asbury form 5.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tristar Bharat Asbury Park.pdf12 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tristar Bharat Asbury Park.pdf12 Oct 2018
Certificates of CA (Form 3)File: RERA CertificateTriStar No P51800013803 Sept 18.pdf12 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201807061042.pdf12 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201807111013.pdf12 Jul 2018

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
JUHU vISTASPlot No. 50 survey no. 287 CTS no. 484 of Village Vile Parle West9CompletedMar 2024Late, May 2024
JUHU ACROPOLISGulmohar Cross Road JUPD Scheme JUHU75CompletedMar 2024Sep 2022
Redevelopment of Existing building no 5 known as Mahavir Nagar Tristar CHSLMahavir Nagar Kandivali Wesy58CompletedDec 2022Sep 2021
Bharat Ecovistas Phase IIShilphata Junction Thane256CompletedDec 2022Sep 2020
Redevelopment of Malad SwingMarve Road Malad West73CompletedDec 2021Jan 2018
Redevelopment of Godi Kamgar Building C3 Wing B Skyvistas Bluez Phase IIID.N. Nagar Andheri West93CompletedDec 2021Mar 2020
Ecovistas Building D1 Fairfield Phase IShilphata Junction Thane122CompletedDec 2016Late, Apr 2017
Ecovistas Building C2 Moorfield Phase IShilphata Junction Thane134CompletedDec 2016Late, Apr 2017
Redevelopment of God Kamgar Building C3 Wing A Skyvistas Skyz Phase IID N Nagar Andheri West92CompletedSep 2016Sep 2016
Redevelopment of Park Darshan CHSL ParkvistasLallu Bhai Park Andheri West Mumbai Maharashtra 40005864CompletedDec 2015Late, Aug 2016
Redevelopment of Godi Kamgar Building C2 Phase IID N Nagar Andheri West89CompletedApr 2014Apr 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Redevelopment of Existing Building No. 5 kno on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahaveer Nagar Kandivali West6,700+ in Mumbai Suburban

2 kmRedevelopment of ExistinCompleted 111Lapsed / revoked 70Other 150Dot size: filed unitsN

Filed coordinates, straight-line distance. 331 registered projects within 2 km.

Builder: BHARAT REALTY VENTURE PRIVATE LIMITED

BHARAT REALTY VENTURE PRIVATE LIMITED has 11 registrations on MahaRERA, including Redevelopment of Malad Swing CHSL and Redevelopment of Godi Kamgar Building C3 Wing B Skyvistas Bluez Phase III. Its filings disclose 11 earlier MahaRERA projects: declares 7 of 11 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL?

The registered promoter entity is BHARAT REALTY VENTURE PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH1998PTC116452 and GSTIN 27AABCB3630P1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL?

The professionals named in the filing: Architect: S P Associates; Architect: Vasant B Pissay. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Redevelopment of Existing Building No. 5 kno to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.