Home / Browse projects / Mumbai Suburban, Maharashtra / REDEVELOPMENT OF BUILDING NO 96
REDEVELOPMENT OF BUILDING NO 96
RG-MH-85573 · RERA P51800013568 · Last updated on MahaRERA portal: 6 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 17 months past the filed date
- Litigation declared, 11 cases
- Completion date moved by 72 months
- 5 extensions taken
Clear
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
REDEVELOPMENT OF BUILDING NO 96 is a Residential / Group Housing project by ADITYA ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013568 on 13 Oct 2017. Possession was promised by 31 May 2025 and is now 17 months past that date. The completion date has moved by 72 months from the original filing. 38 of the 66 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.
At a glance
Project
- NameREDEVELOPMENT OF BUILDING NO 96
- TypeResidential / Group Housing
- Location
- ROAD NO. 13
- Kurla
- Mumbai Suburban
- 400089
- Pincode400089
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800013568
- ReraGenie IDRG-MH-85573
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on13 Oct 2017
- Promised completion31 May 2025
- Revised completionRevised to 31 May 2025 (originally 31 May 2019)
- Buildings2 building records
- Documents filed85 files
Current status
Figures as on 6 Feb 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING B | NA | 10 | 8 | 32 | 0 | 32 |
| WING A | NA | 10 | 9 | 34 | 0 | 34 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
WING B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING B | 1 | 1 |
| WING A | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR MILIND FULZELE |
| Engineer | MR VIKAS GOKHALE |
| Chartered Accountant | RR PONKSHE & COMPANY |
| Partner | Role in project |
|---|---|
| ADITYA ENTERPRISES | - |
Extensions applied for5
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have 100% completed the construction of the building and are awaiting the OC. The obtaining of OC process is taking time. We need more time to finish obtaining OC.
Reason as filed by the promoterWe are in process of obtaining final OC from MHADA. It is taking longer than usual due to changes in rules and non availability of approvals during election time. The construction and development of the building is 100% complete. We will secure the Final OC soon.
Reason as filed by the promoterDue to the Carona Virus this project was majorly affected and was delayed due to the nonavailability of laborers and material. But We have managed to complete the construction of the project in all respects. We are in process of obtaining NOC'srequired for application of Occupation Certificate for this project. The Electric meters, Fire System and Water supply also has been provided to this project. The Buyers have started interior work in their respective flats and are awaiting the OC to move into their flats. We are requesting you to give us an extension till 31st December 2021 so that we ca
Reason as filed by the promoterWe have completed the construction of the project in all respects. We are in process of obtaining the Occupation Certificate for this project. The Electric meters, Fire System and Water supply also has been provided to this project. The Buyers have started interior work in their respective flats and are awaiting the OC to move into their flats. We are requesting you to give us an extension till 31st May 2023 so that we can obtain the OC and hand over the flats to the buyers.
Reason as filed by the promoterREQUIRED PAYMENTS FOR CC WERE MADE TO MCGM 0N 31ST MARCH 2017, FINAL CC WAS OBTAINED ON 06TH OCTOBER 2018. MUTIPLE ADDITIONAL CONDITIONS WERE REQUESTED BY MCGM WHICH WERE NOT MENTIONED AT THE TIME OF PLAN APPROVAL. ADDITIONAL REQUIREMENT TO GET PERMISSION FROM SWM DEPT OF MCGM TO DUMP THE DEBRIS AT MCGM DESIGNATED SITE WAS MADE MANDATORY BY SUPREME COURT ORDER. TIME WAS SPENT BY MCGM TO IDENTIFY THE DUMPING SITES AND PROMOTERS HAD TO SUBMIT BANK GUARANTEES AND UNDERTAKINGS TO AVAIL THE DUMPING PERMISSIONS. ALSO CHANGE IN THE PLANNING AUTHORITY FROM MCGM TO MHADA (FOR PROJECTS ON MHADA LAND) DE
Litigation declared11
| Case | Court | Status |
|---|---|---|
| EA/17/82/2017 | MUMBAI | IN LITIGATION |
| EA/17/83/2017 | MUMBAI | IN LITIGATION |
| EA/17/84/2017 | MUMBAI | IN LITIGATION |
| EA/17/85/2017 | MUMBAI | IN LITIGATION |
| EA/17/86/2017 | MUMBAI | IN LITIGATION |
| EA/17/87/2017 | MUMBAI | IN LITIGATION |
| EA/17/88/2017 | MUMBAI | IN LITIGATION |
| EA/17/89/2017 | MUMBAI | IN LITIGATION |
| EA/17/90/2017 | MUMBAI | IN LITIGATION |
| EA/17/91/2017 | MUMBAI | IN LITIGATION |
| NC/FA/1044/2016/2016 | NCDRC | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 96 RERA Engineer Cert_Apr-June_2024_Signed.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 96 RERA Engineer Cert_July-Sept_2024_Signed.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 96 RERA Engineer Cert_Oct-Dec_2024_Signed.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1-ARCH_April-June 2024.pdf | 28 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1-ARCH_Julu-Sept 2024.pdf | 28 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1-ARCH_Oct-Dec 2024.pdf | 28 Jan 2025 |
| Certificates of CA (Form 3)File: TN-96_Aditya Ent_ CA Cert Form 3_ June_2024.pdf | 26 Jan 2025 |
| Certificates of CA (Form 3)File: TN-96_Aditya Ent_ CA Cert Form 3_ Sept_2024.pdf | 26 Jan 2025 |
| Certificates of CA (Form 3)File: TN-96_Aditya Ent_ CA Cert Form 3_ Dec_2024.pdf | 26 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: TN 96_Disclosure of sold_booked inventory_June 2024.pdf | 13 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation 14052024.pdf | 12 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert_Form2_23-24.pdf | 12 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: TN96_Form2A-2023-24_QA Cert.pdf | 12 Jun 2024 |
| Certificates of CA (Form 5)File: TN-96_Aditya Ent_ CA Cert Form 5_2023-24.pdf | 8 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TN-96_Aditya Ent_ CA Cert Form 3_ Dec_ 2023.pdf | 28 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TN-96_Aditya Ent_ CA Cert Form 3_ March_2024.pdf | 28 May 2024 |
| Certificates of CA (Form 3)File: TN-96_Aditya Ent_ CA Cert Form 3_ Dec_ 2023.pdf | 28 May 2024 |
| Certificates of CA (Form 3)File: TN-96_Aditya Ent_ CA Cert Form 3_ March_2024.pdf | 28 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-QA Cert-Aditya TN 96 Shubh Chs.pdf | 26 Feb 2024 |
| Declaration in FORM BFile: Form B Affidavit Cum Declaration.pdf | 8 Feb 2024 |
| Certificates of CA (Form 3)File: TN-96_Aditya Ent_ CA Cert Form 3_ March 2023.pdf | 14 Dec 2023 |
| Certificates of CA (Form 3)File: TN-96_Aditya Ent_ CA Cert Form 3_ Sept 2023.pdf | 14 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form 5 2022-23.pdf | 13 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_ARCH CERT_ DEC-2022.pdf | 8 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_ARCH CERT_ MAARCH 2023.pdf | 8 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-Engg Cert _Jan2023-min.pdf | 8 Oct 2023 |
| Certificates of CA (Form 3)File: TN96_CA Cert-Form3_Oct-Dec2022.pdf | 8 Feb 2023 |
| Proforma of Agreement for saleFile: Sample AGREEMENT FOR SALE Bldg 96 TN.pdf | 2 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration abtCC_Jan2023.pdf | 31 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_Jan 2023.pdf | 31 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TN96_AdityaEnt_Oct2022.pdf | 31 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Arch Cert June 2022.pdf | 31 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TN96ArchCert 31122021.pdf | 31 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5 2021-22.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Jan 2023.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: TN96_Form2A-2021-22_QA Cert.pdf | 20 Jan 2023 |
| Certificates of CA (Form 3)File: CACert Oct2022_TN96-compressed.pdf | 20 Jan 2023 |
| Certificates of CA (Form 5)File: TN96-AdityaEnt-CA Form-5-2021-22.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: TN-96-AdityaENT-CA Form 5-2018-19.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: TN96-RERA FORM 5 CA 2020-21.pdf | 20 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TN96_Form2_Engg Cert_June 2022.pdf | 16 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: TN96_Form2A-2019-20_QA Cert.pdf | 11 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: TN96_Form2A-2020-21_QA Cert.pdf | 11 Aug 2022 |
| Certificates of CA (Form 3)File: Aditya enterprises.pdf | 22 Jun 2022 |
| Certificates of CA (Form 5)File: Scan 06-Feb-2022.pdf | 22 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 96TN-ArchCert-20022021_RERA (1).pdf | 3 Mar 2021 |
| Certificates of CA (Form 5)File: Scan 19-Feb-2021.pdf | 3 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Scan 19-Feb-2021.pdf | 3 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Scan 19-Feb-2021.pdf | 3 Mar 2021 |
| Certificates of CA (Form 3)File: TN96-AdityaShubh-RERA Dec 2020 _Compressed.pdf | 16 Feb 2021 |
| Certificates of CA (Form 3)File: 96 CA Certificate March 2019 (1).pdf | 21 Sep 2019 |
| Certificates of CA (Form 3)File: 96 CA Certificate March 2019 (1).pdf | 21 Sep 2019 |
| Certificates of CA (Form 5)File: Aditya_TN_96_Form 5_2018-19.pdf | 16 Sep 2019 |
| Certificates of CA (Form 5)File: 96 CA Certificate March 2019 (1).pdf | 20 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 96TN_ArchCert_052019.pdf | 31 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Shubh Bldg 96TN_CC_06-10-2018.pdf | 23 Nov 2018 |
| Building plan approvalFile: iod1.pdf | 30 Sep 2017 |
| Building plan approvalFile: iod2.pdf | 30 Sep 2017 |
| Building plan approvalFile: iod3.pdf | 30 Sep 2017 |
| Building plan approvalFile: iod4.pdf | 30 Sep 2017 |
| Building plan approvalFile: iod5.pdf | 30 Sep 2017 |
| Building plan approvalFile: iod6.pdf | 30 Sep 2017 |
| Building plan approvalFile: iod7.pdf | 30 Sep 2017 |
| Building plan approvalFile: iod8.pdf | 30 Sep 2017 |
| Layout approvalFile: 96 RERA LAYOUT (1).pdf | 30 Sep 2017 |
| PAN CardFile: BABURAO PATIL PAN CARD.pdf | 30 Sep 2017 |
| PAN CardFile: ARUN PATIL PAN CARD.pdf | 30 Sep 2017 |
| PAN CardFile: VIDYA SANKHE PAN CARD.pdf | 30 Sep 2017 |
| Copy of the legal title reportFile: 96RERA Title Cert (3).pdf | 30 Sep 2017 |
| Details of encumbrancesFile: iod1.pdf | 30 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: 96 RERA LAYOUT (1).pdf | 30 Sep 2017 |
| Building Plan Approval (IOD)File: iod1.pdf | 30 Sep 2017 |
| Building Plan Approval (IOD)File: iod2.pdf | 30 Sep 2017 |
| Building Plan Approval (IOD)File: iod3.pdf | 30 Sep 2017 |
| Building Plan Approval (IOD)File: iod4.pdf | 30 Sep 2017 |
| Building Plan Approval (IOD)File: iod5.pdf | 30 Sep 2017 |
| Building Plan Approval (IOD)File: iod6.pdf | 30 Sep 2017 |
| Building Plan Approval (IOD)File: iod7.pdf | 30 Sep 2017 |
| Building Plan Approval (IOD)File: iod8.pdf | 30 Sep 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: 96RERA CC (1).pdf | 30 Sep 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep REDEVELOPMENT OF BUILDING NO 96 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kurla6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 507 registered projects within 2 km.
Atmosphere O2 Tower-G
Atmosphere Realty Pvt Ltd
VARDHAN HEIGHTS
VARDHAN HOUSING
Promesa Midtown
Darshan Properties
ELYSIUM
KRIPA ELITE HOMES
JADE
PRIYA CONSTRUCTIONS
Gami and Jaydeep Elanza
M/S REAL INFRASTRUCTURE CO
See every Mumbai Suburban project, with the district possession charts
Builder: ADITYA ENTERPRISES
ADITYA ENTERPRISES has 11 registrations on MahaRERA, including PURNIMA PRIDE and VIDHYA DARSHAN. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that REDEVELOPMENT OF BUILDING NO 96 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if REDEVELOPMENT OF BUILDING NO 96 is delayed beyond 31 May 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of REDEVELOPMENT OF BUILDING NO 96?
The registered promoter entity is ADITYA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in REDEVELOPMENT OF BUILDING NO 96?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for REDEVELOPMENT OF BUILDING NO 96?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at REDEVELOPMENT OF BUILDING NO 96?
The professionals named in the filing: Architect: MR MILIND FULZELE; Engineer: MR VIKAS GOKHALE; Chartered Accountant: RR PONKSHE & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in REDEVELOPMENT OF BUILDING NO 96?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback