Home / Browse projects / Pune, Maharashtra / RATNANKUR
RATNANKUR
RG-MH-27393 · RERA P52100035032 · Last updated on MahaRERA portal: 12 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 12 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RATNANKUR is a Residential / Group Housing project by Ranjekar Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100035032 on 29 Apr 2022. Possession was promised by 31 Oct 2025 and is now 12 months past that date. 21 of the 39 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameRATNANKUR
- TypeResidential / Group Housing
- Location
- Mayur Colony
- Kothrud
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100035032
- ReraGenie IDRG-MH-27393
Builder
- NameRanjekar Realty LLP
- Entity typePartnership
- LLPINAAQ-0493
- GSTIN27ABAFR0621D1ZS
- LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- PartnersHarish Raoji Patil, Rohan Harish Patil
- Other registrations14 more →
- Completed4 of 15
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Apr 2022
- Promised completion31 Oct 2025
- Revised completionNone
- Buildings1 building record
- Documents filed61 files
Current status
Figures as on 12 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RATNANKUR | NA | 14 | 13 | 39 | 0 | 39 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
RATNANKUR: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RATAN APARTMENT CONDOMINIUM | Pune (M Corp.) | Pune |
| DURWANKUR APARTMENTS CONDOMINIUM | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RATNANKUR | NA | Rs 14.18 cr | Rs 14.18 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Manguesh Bhandekar |
| Architect | Pranay Chandratrey |
| Engineer | Aniruddha Ranjekar |
| Engineer | Anniruddha Ranjekar |
| Chartered Accountant | Tejas Sant |
| Chartered Accountant | KISHOR R JOSHI |
| Chartered Accountant | Kishor & Joshi & Associates |
| Chartered Accountant | Phule Wagh & Associates LLP |
| Partner | Role in project |
|---|---|
| Ranjekar Realty LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Feb 2025
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 q3 fy 2425.pdf | 12 Mar 2026 |
| Form 2File: Form 2 q3 fy 2425.pdf | 12 Mar 2026 |
| Form 3File: Form 3 q3 fy 2425.pdf | 12 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 12 Mar 2026 |
| OthersFile: Form 4 Architect Certificate RATNANKUR.pdf | 12 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate-Updated.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate-Updated.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate-Updated.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 Engineer Certificate.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 Engineer Certificate.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 Engineer Certificate.pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Q1 FY 2025-26.pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Q2 FY 2025-26.pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Q3 FY 2025-26.pdf | 4 Mar 2026 |
| Form 1File: Form 1 Architect certificate.pdf | 29 May 2025 |
| Form 2File: FORM 2 Engineer Certificate.pdf | 29 May 2025 |
| Form 3File: Form 3 Charterd Accountant Certificate as on 31 march 2025.pdf | 29 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Declaration Sold Unsold_1.pdf | 29 May 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf | 29 May 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf | 29 May 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Rattnakur Full Complition.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ratnankur 31 Mar 24.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RATNANKUR FORM 3 -30 JUN 24.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RATNANKUR AS ON 30-9-24.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RATNANKUR AS ON 30-9-24.pdf | 29 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 RATNANKUR 2022-2023.pdf | 6 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ratnankur engineer's Q7 certificate.pdf | 12 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RATNANKUR FORM 3 as on 31 DEC 23.pdf | 12 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RATNANKUR FORM 3 30092023.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ratnankur engineer's certificate.pdf | 11 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ratnankur jun 23_compressed (1).pdf | 11 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchCertificate Ratnankur march 23.pdf | 5 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ratnankur engineer's certificate.pdf | 5 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ratnankur quality assurance.pdf | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ratnankur Mar 23-compressed.pdf | 5 Jun 2023 |
| Building plan approvalFile: Plan 1.pdf | 13 Apr 2023 |
| Building plan approvalFile: Plan 2.pdf | 13 Apr 2023 |
| Building plan approvalFile: Plan 3.pdf | 13 Apr 2023 |
| Building plan approvalFile: Plan 4.pdf | 13 Apr 2023 |
| Building plan approvalFile: Plan 5.pdf | 13 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 13 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 13 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 13 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf | 13 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf | 13 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 130423.pdf | 13 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ratnankur Form 3.pdf | 17 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_RATNANKUR.pdf | 14 Apr 2022 |
| Declaration about Commencement CertificateFile: Ratnankur_DECLARATION CC 02.pdf | 11 Apr 2022 |
| Building plan approvalFile: Ratnankur Plan 1 08042022_compressed.pdf | 9 Apr 2022 |
| Layout approvalFile: Ratnankur Plan 1 08042022_compressed.pdf | 9 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: Ratnankur Plan 1 08042022_compressed.pdf | 9 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Ratnankur Plan 1 08042022_compressed.pdf | 9 Apr 2022 |
| Copy of the legal title reportFile: Ratan Durwankur Search report New_compressed.pdf | 8 Mar 2022 |
| CERSAI detailsFile: CERSAI Undertaking.pdf | 7 Mar 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200231807285_For_Asset_Based_Search_07_03_2022_17_02_39_940.pdf | 7 Mar 2022 |
| PAN CardFile: 1773_20220222111650_001.pdf | 22 Feb 2022 |
| Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf | 18 Feb 2022 |
| Declaration in FORM BFile: Form B Ratnankur_compressed.pdf | 11 Feb 2022 |
| Details of encumbrancesFile: Non Encumbrance Cert Ratnankur.pdf | 3 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement CC 1_compressed.pdf | 3 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RATNANKUR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kothrud13,700+ in Pune
Filed coordinates, straight-line distance. 347 registered projects within 2 km.
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: Ranjekar Realty LLP
Ranjekar Realty LLP has 15 registrations on MahaRERA, including ANANT and DRUMADAL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that RATNANKUR shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if RATNANKUR is delayed beyond 31 Oct 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RATNANKUR?
The registered promoter entity is Ranjekar Realty LLP, a partnership as per the filing. Its LLPIN AAQ-0493 and GSTIN 27ABAFR0621D1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RATNANKUR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RATNANKUR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RATNANKUR?
The professionals named in the filing: Architect: Manguesh Bhandekar; Architect: Pranay Chandratrey; Engineer: Aniruddha Ranjekar; Engineer: Anniruddha Ranjekar; Chartered Accountant: Tejas Sant; Chartered Accountant: KISHOR R JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RATNANKUR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback