ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / Ranveer Oriana

Registered No litigation declared Others project

Ranveer Oriana

By Optricon India LLP

RG-MH-54239 · RERA P51500034588 · Last updated on MahaRERA portal: 22 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
38 of 88Construction stages doneacross 8 buildings; furthest along: Internal walls, 60%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Ranveer Oriana is a Others project by Optricon India LLP in Aurangabad, Maharashtra, registered with MahaRERA as P51500034588 on 11 Apr 2022. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameRanveer Oriana
  • TypeOthers
  • Location
    • Beed Bypass
    • Balapur
    • Aurangabad
    • 431117
  • Pincode431117
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500034588
  • ReraGenie IDRG-MH-54239

Builder

  • NameOptricon India LLP
  • Entity typePartnership

Key dates

this monthRegisteredApr 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Apr 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings8 building records
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Apartment Building ABNA54000
Building CNA32000
Building DNA32000
Building ENA32000
Building FNA32000
Building GNA32000
Building HNA32000
Building INA33000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 22 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

38 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Internal walls, at 60%.

Apartment Building AB55%
ActivityProgress
Excavation10%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Building C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building E27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building F57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Building G73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Building H91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building I91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes45%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes25%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,813 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shaikh Samsher GulabDevlaiAurangabad

Approvals and building plan

Sanctioning authorityCIDCO AURANGABAD
Permissible FSI13965.3
Proposed, not sanctioned13,419 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChikalthana Aurangabad

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSaurabh Mirkute
EngineerPradeep Mote
Chartered AccountantNarendra Navandar& Co
PartnerRole in project
Optricon India LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Permission Plan 1 09022024_compressed.pdf22 Mar 2025
Building plan approvalFile: Permission Plan 2 09022024_compressed.pdf22 Mar 2025
Building plan approvalFile: Permission Plan 3 09022024_compressed.pdf22 Mar 2025
Building plan approvalFile: Permission Plan 4 09022024_compressed.pdf22 Mar 2025
Building plan approvalFile: Permission Plan 5 09022024_compressed.pdf22 Mar 2025
Building plan approvalFile: Permission Plan 6 09022024_compressed.pdf22 Mar 2025
Building plan approvalFile: Permission Plan 7 09022024_compressed.pdf22 Mar 2025
Building plan approvalFile: Permission Plan 8 09022024_compressed.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ranveer Oriana Form-1.pdf22 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Permission Certificate 09 02 2024.pdf22 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Permission Plan 1 09022024_compressed.pdf22 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Permission Plan 2 09022024_compressed.pdf22 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Permission Plan 3 09022024_compressed.pdf22 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Permission Plan 4 09022024_compressed.pdf22 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Permission Plan 5 09022024_compressed.pdf22 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Permission Plan 6 09022024_compressed.pdf22 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Permission Plan 7 09022024_compressed.pdf22 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Permission Plan 8 09022024_compressed.pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Dec 24.pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024 Ranveer_compressed.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Optricon India Form-1 12 1 24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Optricon India Form-1 13 4 24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Optricon India Form-1 20 10 24_compressed.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Optricon India Form-2 12 01 24 (1).pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Optricon India Form-2 13 4 24.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Optricon India Form-2 16 7 24.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Optricon India Form-2 20 10 24.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE 12-07-2023.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFCATE 16-10-2023.pdf16 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 11012023.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 10042023.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 15072023.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 16102023.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineerings Certificate 120323.pdf8 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: optricon form 5.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (1).pdf9 Feb 2023
Proforma of Agreement for saleFile: 2 Proforma of Allotment letter.pdf2 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200234255560_For_Asset_Based_Search_04_04_2022_12_34_27_227.pdf4 Apr 2022
Layout approvalFile: Permission Drw For Rera All (2)_1.pdf28 Mar 2022
Building plan approvalFile: Permission Drw For Rera All (2)_1.pdf28 Mar 2022
Building plan approvalFile: Permission Drw For Rera All (2)_2-1.pdf28 Mar 2022
Building plan approvalFile: Permission Drw For Rera All (2)_2-2.pdf28 Mar 2022
Building plan approvalFile: Permission Drw For Rera All (2)_3.pdf28 Mar 2022
Building plan approvalFile: Permission Drw For Rera All (2)_4.pdf28 Mar 2022
PAN CardFile: Optricon PAN.pdf28 Mar 2022
Copy of the legal title reportFile: Format A MAHA RERA MUMBAI001.pdf28 Mar 2022
Details of encumbrancesFile: ENCUM.pdf28 Mar 2022
Copy of Layout Approval (in case of layout)File: Permission Drw For Rera All (2)_1.pdf28 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Permission Drw For Rera All (2)_1.pdf28 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Permission Drw For Rera All (2)_2-1.pdf28 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Permission Drw For Rera All (2)_2-2.pdf28 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Permission Drw For Rera All (2)_3.pdf28 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Permission Drw For Rera All (2)_4.pdf28 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf28 Mar 2022
Declaration about Commencement CertificateFile: Optricon india LLP Of Declaration About Commencemnt Certificate (Format -D)_0001.pdf28 Mar 2022
Declaration in FORM BFile: FORM B.pdf28 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate Oprticon India LLP_0001.pdf28 Mar 2022
Proforma of Allotment letterFile: Allotment Letter001.pdf28 Mar 2022
Proforma of Allotment letterFile: Shaikh Samsher Gulab (Agreement to Sale)001.pdf28 Mar 2022

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Ranveer Oriana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balapur1,400+ in Aurangabad

2 kmRanveer OrianaCompleted 11Lapsed / revoked 8Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: Optricon India LLP

Optricon India LLP has 1 registration on MahaRERA, including Ranveer Oriana. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Ranveer Oriana is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ranveer Oriana?

The registered promoter entity is Optricon India LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ranveer Oriana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ranveer Oriana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ranveer Oriana?

The professionals named in the filing: Architect: Saurabh Mirkute; Engineer: Pradeep Mote; Chartered Accountant: Narendra Navandar& Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ranveer Oriana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ranveer Oriana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ranveer Oriana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.