ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Ramkrupa

Registration lapsed No litigation declared Residential / Group Housing project

Ramkrupa

By Spanpromoters

RG-MH-13123 · RERA P52100022539 · Last updated on MahaRERA portal: 26 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
8 of 11Construction stages donefurthest along: Podiums (if any), 0%
20 of 54Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 211 documents Report an error

Ramkrupa is a Residential / Group Housing project by Spanpromoters in Pune, Maharashtra, registered with MahaRERA as P52100022539 on 1 Oct 2019. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 34 of the 54 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRamkrupa
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Rambaug Colony
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022539
  • ReraGenie IDRG-MH-13123

Builder

  • NameSpanpromoters
  • Entity typePartnership
  • PartnersPravin Keshav Badhekar, Murlidhar Kisanrao Mohol

Key dates

10 months past promisethis monthRegisteredOct 2019First promiseDec 2023Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Oct 2019
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed211 files

Current status

63%34 of 54 units booked

Figures as on 26 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RamkrupaNA181554054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Ramkrupa: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 26 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
CCTVYes0%

Parking filed191

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots191
Closed/Covered42
Open Space149

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Nov 2025
LandownerVillageDistrict
Pravin BadhekarKothrudPune
Murlidhar MoholKothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3942.28
Proposed, not sanctioned3,273 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIDBI Bank, Gujrat Colony, Vanaz Corner, Paud Road, Kothrud, Pune 411029

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBalasaheb Dhavale
EngineerG A BHILARE CONSULTANTS PVT. LTD.
EngineerDipali Amit Kulkarni
Chartered AccountantShirikant Mantri
Chartered AccountantDinesh Balkrishna Gandhi
Chartered AccountantSHRIKANT MANTRI AND CO.
PartnerRole in project
Spanpromoters-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018150Dec 2023 → Dec 2024

Reason as filed by the promoterWe have already almost completed our project. However only a few finishing activities are yet to be completed, for which we need to apply for RERA Extension. Please grant us Extension for our above project. If necessary, we can share the pictures of our project current status via mail with you. Let us know if we need to share the same. Thanking in anticipation.

EXT52100025548Dec 2023 → Dec 2025

Reason as filed by the promoterWe have already completed our project. There are many changes on site, due to which we need to take revised sanction as per actual site conditions, for which we need to apply for RERA Extension.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000137156Vijaya Vijay KulkarniM/s Span Promoters31/05/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed211

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 211 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 Ramkrupa FY 24-25 Scan.pdf26 Mar 2026
Form 2A (FY 2025-2026)File: Form 2A Engineers certificate Ramkrupa 25-26.pdf21 Jan 2026
Form 1File: Architect certificate Ramkrupa Mar-25..pdf28 Nov 2025
Form 2File: Architect certificate Ramkrupa Mar-25..pdf28 Nov 2025
Form 3File: Ramkrupa RERA Form 3 Mar 25.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Ramkrupa RERA Form 3 Mar 25.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa Dec 2024.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Ramkrupa Dec 2024.pdf28 Nov 2025
Form 3File: CA Certificate - Ramkrupa Dec 2024.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory Dec 24.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa Jun 2024.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Ramkrupa Jun 2024.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Ramkrupa Jun 2024.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Ramkrupa Jun 2024.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa Mar 2024.pdf28 Nov 2025
Form 2File: Engineer’s Certificate - Ramkrupa Mar 2024.pdf28 Nov 2025
Form 3File: CA Certificate - Ramkrupa Mar 2024.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: CA Certificate - Ramkrupa Mar 2024.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa Dec 2023.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Ramkrupa Dec 2023.pdf28 Nov 2025
Form 3File: 4 Disclosure of sold_ booked inventory Dec 23.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: 5 Disclosure of sold_ booked inventory Dec 23.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa Sep 2023.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Ramkrupa Sep 2023.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Ramkrupa Sep 2023.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory Sep 23.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa Nov 2022.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Ramkrupa Nov 2022.pdf28 Nov 2025
Form 3File: Architect’s Certificate - Ramkrupa Nov 2022.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory Oct 22.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa Nov 2022.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Ramkrupa Nov 2022.pdf28 Nov 2025
Form 3File: 2 Disclosure of sold_ booked inventory Oct 22.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory Oct 22.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa Nov 2022.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Ramkrupa Nov 2022.pdf28 Nov 2025
Form 3File: 2 Disclosure of sold_ booked inventory Oct 22.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory Oct 22.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa May 2022.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Ramkrupa May 2022.pdf28 Nov 2025
Form 3File: 1 Disclosure of sold_ booked inventory Jun 22.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory Jun 22.pdf28 Nov 2025
Form 1File: Architect’s Certificate - Ramkrupa May 2022.pdf28 Nov 2025
Form 2File: Architect’s Certificate - Ramkrupa May 2022.pdf28 Nov 2025
Form 3File: 1 Disclosure of sold_ booked inventory Jun 22.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory Jun 22.pdf28 Nov 2025
Form 1File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 2File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 3File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 1File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 2File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 3File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 1File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 2File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 3File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 1File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 2File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 3File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 1File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 2File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 3File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 1File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 2File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 3File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 1File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 2File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 3File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 1File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 2File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 3File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 1File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025
Form 2File: Registration Application Form3 Ramkrupa.pdf28 Nov 2025

How this compares with Pune

63%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ramkrupa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rambaug Colony13,700+ in Pune

2 kmRamkrupaCompleted 84Lapsed / revoked 37Other 182Dot size: filed unitsN

Filed coordinates, straight-line distance. 303 registered projects within 2 km.

Builder: Spanpromoters

Spanpromoters has 1 registration on MahaRERA, including Ramkrupa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Ramkrupa shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ramkrupa is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ramkrupa?

The registered promoter entity is Spanpromoters, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ramkrupa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ramkrupa?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ramkrupa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ramkrupa?

The professionals named in the filing: Architect: Balasaheb Dhavale; Engineer: G A BHILARE CONSULTANTS PVT. LTD.; Engineer: Dipali Amit Kulkarni; Chartered Accountant: Shirikant Mantri; Chartered Accountant: Dinesh Balkrishna Gandhi; Chartered Accountant: SHRIKANT MANTRI AND CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ramkrupa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ramkrupa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ramkrupa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.