Home / Browse projects / Thane, Maharashtra / RAMESHWAR PARK - A1 AND A2
RAMESHWAR PARK - A1 AND A2
By RAMESHAWAR BUILDERS & DEVELOPERS
RG-MH-33341 · RERA P51700080694 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAMESHWAR PARK - A1 AND A2 is a Residential / Group Housing project by RAMESHAWAR BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700080694 on 25 Jun 2025. Possession is promised by 31 Dec 2027. 51 of the 105 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameRAMESHWAR PARK - A1 AND A2
- TypeResidential / Group Housing
- Location
- DIVA SHIL ROAD
- Sector-11
- Mouje-Dawale
- Thane (M Corp.)
- Thane
- 400612
- Pincode400612
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700080694
- ReraGenie IDRG-MH-33341
Builder
- NameRAMESHAWAR BUILDERS & DEVELOPERS
- Entity typePartnership
- PartnersDHIRAJ BHIMJI PATEL, MANOJ BHIMJI PATEL, KALPESH KANTILAL BHAGAT, KIRTI KANTILAL BHAGAT, KANJI MURJI MANGE, KIRTI HARILAL PATEL, SURESH GOPINATH LOTKE, SHILPA SANDEEP SALIA
- Other registrations5 more →
- Completed3 of 6
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jun 2025
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed44 files
Current status
Figures as on 29 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RAMESHWAR PARK - A1 | NA | 8 | 7 | 63 | 0 | 63 |
| RAMESHWAR PARK - A2 | NA | 8 | 7 | 42 | 0 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.
RAMESHWAR PARK - A148%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RAMESHWAR PARK - A248%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| RAMESHWAR PARK - A1 | 16 | 19 | 35 |
| RAMESHWAR PARK - A2 | 9 | 10 | 19 |
Land and ownership18
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| ANANT VALKYA KHARPATIL | Thane (M Corp.) | Thane |
| Smt. BAIMABAI B. KHARPATIL | Thane (M Corp.) | Thane |
| MR. CHINTAMAN B. KHARPATIL | Thane (M Corp.) | Thane |
| MR. DASHARATH V. KHARPATIL | Thane (M Corp.) | Thane |
| Smt. JANAKU SHALIK KHARPATIL | Thane (M Corp.) | Thane |
| Smt. JOMIBAI VALKYA KHARPATIL | Thane (M Corp.) | Thane |
| MR. KAILASH B. KHARPATIL | Thane (M Corp.) | Thane |
| MR. KANJI MURJI MANGE | Goregaon | Mumbai Suburban |
| Mrs. KAVITA BALKRISHNA PATIL | Thane (M Corp.) | Thane |
| MR. NILESH SHALIK KHARPATIL | Thane (M Corp.) | Thane |
| MR. NITIN SHALIK KHARPATIL | Thane (M Corp.) | Thane |
| MR. PRADEEP SHALIK KHARPATIL | Thane (M Corp.) | Thane |
| Mrs. PREMABAI BALARAM BHOIR | Thane (M Corp.) | Thane |
| Mrs. RANTABAI NARAYN PATIL | Thane (M Corp.) | Thane |
| MR. SANTOSH B. KHARPATIL | Thane (M Corp.) | Thane |
| Smt. SUNDARABAI G. PATIL | Thane (M Corp.) | Thane |
| Mrs. YAMUNA UVARAJ PATIL | Thane (M Corp.) | Thane |
| SAVITA BHANUDAS VAYALE | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RAMESHWAR PARK - A1 | NA | Rs 6.51 cr | Rs 3.90 cr |
| RAMESHWAR PARK - A2 | NA | Rs 4.58 cr | Rs 2.75 cr |
| - | NA | Rs 71.03 lakh | Rs 3.55 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMEER S LOTKE AND ASSOCIATES |
| Engineer | PANKAJ KUMAR GUPTA |
| Chartered Accountant | Mehta Mihir and Co |
| Partner | Role in project |
|---|---|
| RAMESHAWAR BUILDERS & DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jun 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed44
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: A1A2 Form 1_310326.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: A1 ADN A2_310326.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: Form -3 A1A2 RBD 310326.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: A1 A2 Form 1_311225.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: A1 A2 Form 2_311225.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 A1A2_311225.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 300925.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 A1A2 300925.pdf | 14 Feb 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form 3_A1A2_300925.pdf | 14 Feb 2026 |
| Withdrawal Update Form 1File: Form 1_300625.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_300625.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: RERA CERTIFICATE A1 A2_30062025.pdf | 14 Jan 2026 |
| Other - FinanceFile: Final Declaration.pdf | 20 Jun 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation COMP.pdf | 20 Jun 2025 |
| Copy of the legal title reportFile: 131-C title_c.pdf | 7 Jun 2025 |
| Copy of the legal title reportFile: 131-d dawale_D.pdf | 7 Jun 2025 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf | 7 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Final.pdf | 29 Apr 2025 |
| Other - FinanceFile: Repurchase_20231207050248_F.pdf | 28 Apr 2025 |
| Other - TechnicalFile: Declaration cum undertaking for no sale_SIGNED f.pdf | 28 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: No Encumbrances Finance updated_A1 F.pdf | 26 Apr 2025 |
| CERSAI detailsFile: Declaration for No Cersai Report_A1 F.pdf | 26 Apr 2025 |
| Details of encumbrances concerned to LegalFile: No Encumbrances Finance updated_A1 F.pdf | 26 Apr 2025 |
| Other - FinanceFile: No Encumbrances Finance updated_A1 F.pdf | 26 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B_U.pdf | 26 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: No Encumbrances Finance updated_A1.pdf | 12 Apr 2025 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER RERA Phase III.pdf | 12 Apr 2025 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate_A1 Revised.pdf | 12 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_A1 Final.pdf | 12 Apr 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter_A1R.pdf | 12 Apr 2025 |
| Details of encumbrances concerned to LegalFile: No Encumbrances Finance updated_A1.pdf | 12 Apr 2025 |
| Other - TechnicalFile: Annexure A_Declaration cum undertaking_A1 Final.pdf | 12 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations_Final.pdf | 12 Apr 2025 |
| Declaration in FORM BFile: FORM_B_Notary.pdf | 26 Mar 2025 |
| Other - TechnicalFile: SRO Certificate_RPM_MCHI_517000_TNA_2626.pdf | 26 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance signed_A1.pdf | 26 Mar 2025 |
| Layout approvalFile: TMC Approved Layout and Building Plan.pdf | 22 Mar 2025 |
| Building plan approvalFile: TMC Approved Layout and Building Plan.pdf | 22 Mar 2025 |
| PAN CardFile: RBD PAN CARD.pdf | 22 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: TMC Approved Layout and Building Plan.pdf | 22 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1_A1 A2.pdf | 22 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_A1 and A2_MANOJ.pdf | 22 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permission.pdf | 22 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: TMC Approved Layout and Building Plan.pdf | 22 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 44 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RAMESHWAR PARK - A1 AND A2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sector-11, Mouje-Dawale,7,600+ in Thane
Filed coordinates, straight-line distance. 106 registered projects within 2 km.
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: RAMESHAWAR BUILDERS & DEVELOPERS
RAMESHAWAR BUILDERS & DEVELOPERS has 6 registrations on MahaRERA, including RAMESHWAR PARK (ORCHID, IRIS & ROSE) and RAMESHWAR PARK - DAFFODIL A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if RAMESHWAR PARK - A1 AND A2 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAMESHWAR PARK - A1 AND A2?
The registered promoter entity is RAMESHAWAR BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAMESHWAR PARK - A1 AND A2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAMESHWAR PARK - A1 AND A2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAMESHWAR PARK - A1 AND A2?
The professionals named in the filing: Architect: SAMEER S LOTKE AND ASSOCIATES; Engineer: PANKAJ KUMAR GUPTA; Chartered Accountant: Mehta Mihir and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAMESHWAR PARK - A1 AND A2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback