ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / RAMESHWAR PARK - A1 AND A2

Registered No litigation declared Residential / Group Housing project

RAMESHWAR PARK - A1 AND A2

By RAMESHAWAR BUILDERS & DEVELOPERS

RG-MH-33341 · RERA P51700080694 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
54 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

RAMESHWAR PARK - A1 AND A2 is a Residential / Group Housing project by RAMESHAWAR BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700080694 on 25 Jun 2025. Possession is promised by 31 Dec 2027. 51 of the 105 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameRAMESHWAR PARK - A1 AND A2
  • TypeResidential / Group Housing
  • Location
    • DIVA SHIL ROAD
    • Sector-11
    • Mouje-Dawale
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700080694
  • ReraGenie IDRG-MH-33341

Builder

  • NameRAMESHAWAR BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersDHIRAJ BHIMJI PATEL, MANOJ BHIMJI PATEL, KALPESH KANTILAL BHAGAT, KIRTI KANTILAL BHAGAT, KANJI MURJI MANGE, KIRTI HARILAL PATEL, SURESH GOPINATH LOTKE, SHILPA SANDEEP SALIA
  • Other registrations5 more →
  • Completed3 of 6
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jun 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed44 files

Current status

49%51 of 105 units booked
56.7%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAMESHWAR PARK - A1NA8763063
RAMESHWAR PARK - A2NA8742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

RAMESHWAR PARK - A148%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAMESHWAR PARK - A248%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered25
Open Space29
BuildingClosed/CoveredOpen SpaceTotal
RAMESHWAR PARK - A1161935
RAMESHWAR PARK - A291019

Land and ownership18

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,590 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jan 2026
LandownerVillageDistrict
ANANT VALKYA KHARPATILThane (M Corp.)Thane
Smt. BAIMABAI B. KHARPATILThane (M Corp.)Thane
MR. CHINTAMAN B. KHARPATILThane (M Corp.)Thane
MR. DASHARATH V. KHARPATILThane (M Corp.)Thane
Smt. JANAKU SHALIK KHARPATILThane (M Corp.)Thane
Smt. JOMIBAI VALKYA KHARPATILThane (M Corp.)Thane
MR. KAILASH B. KHARPATILThane (M Corp.)Thane
MR. KANJI MURJI MANGEGoregaonMumbai Suburban
Mrs. KAVITA BALKRISHNA PATILThane (M Corp.)Thane
MR. NILESH SHALIK KHARPATILThane (M Corp.)Thane
MR. NITIN SHALIK KHARPATILThane (M Corp.)Thane
MR. PRADEEP SHALIK KHARPATILThane (M Corp.)Thane
Mrs. PREMABAI BALARAM BHOIRThane (M Corp.)Thane
Mrs. RANTABAI NARAYN PATILThane (M Corp.)Thane
MR. SANTOSH B. KHARPATILThane (M Corp.)Thane
Smt. SUNDARABAI G. PATILThane (M Corp.)Thane
Mrs. YAMUNA UVARAJ PATILThane (M Corp.)Thane
SAVITA BHANUDAS VAYALEThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI4883.4
Proposed, not sanctioned4,883 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 6 & 11 NEW HAPPY LIFE CO-OP HSG SOCIETY LTD, R H B ROAD, MULUND WEST, MUMBAI-400080
Estimated costRs 11.80 cr
Cost incurredRs 6.69 cr
Work done56.69%
BuildingWingEstimatedIncurred
RAMESHWAR PARK - A1NARs 6.51 crRs 3.90 cr
RAMESHWAR PARK - A2NARs 4.58 crRs 2.75 cr
-NARs 71.03 lakhRs 3.55 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER S LOTKE AND ASSOCIATES
EngineerPANKAJ KUMAR GUPTA
Chartered AccountantMehta Mihir and Co
PartnerRole in project
RAMESHAWAR BUILDERS & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: A1A2 Form 1_310326.pdf29 Apr 2026
Withdrawal Update Form 2File: A1 ADN A2_310326.pdf29 Apr 2026
Withdrawal Update Form 3File: Form -3 A1A2 RBD 310326.pdf29 Apr 2026
Withdrawal Update Form 1File: A1 A2 Form 1_311225.pdf26 Feb 2026
Withdrawal Update Form 2File: A1 A2 Form 2_311225.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 A1A2_311225.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 300925.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2 A1A2 300925.pdf14 Feb 2026
Withdrawal Update Form 3File: Withdrawal Application Form 3_A1A2_300925.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1_300625.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2_300625.pdf14 Jan 2026
Withdrawal Update Form 3File: RERA CERTIFICATE A1 A2_30062025.pdf14 Jan 2026
Other - FinanceFile: Final Declaration.pdf20 Jun 2025
Deviation Report with respect to model copy of AgreementFile: Deviation COMP.pdf20 Jun 2025
Copy of the legal title reportFile: 131-C title_c.pdf7 Jun 2025
Copy of the legal title reportFile: 131-d dawale_D.pdf7 Jun 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf7 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Final.pdf29 Apr 2025
Other - FinanceFile: Repurchase_20231207050248_F.pdf28 Apr 2025
Other - TechnicalFile: Declaration cum undertaking for no sale_SIGNED f.pdf28 Apr 2025
Details of encumbrances concerned to FinanceFile: No Encumbrances Finance updated_A1 F.pdf26 Apr 2025
CERSAI detailsFile: Declaration for No Cersai Report_A1 F.pdf26 Apr 2025
Details of encumbrances concerned to LegalFile: No Encumbrances Finance updated_A1 F.pdf26 Apr 2025
Other - FinanceFile: No Encumbrances Finance updated_A1 F.pdf26 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B_U.pdf26 Apr 2025
Details of encumbrances concerned to FinanceFile: No Encumbrances Finance updated_A1.pdf12 Apr 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER RERA Phase III.pdf12 Apr 2025
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate_A1 Revised.pdf12 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_A1 Final.pdf12 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter_A1R.pdf12 Apr 2025
Details of encumbrances concerned to LegalFile: No Encumbrances Finance updated_A1.pdf12 Apr 2025
Other - TechnicalFile: Annexure A_Declaration cum undertaking_A1 Final.pdf12 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations_Final.pdf12 Apr 2025
Declaration in FORM BFile: FORM_B_Notary.pdf26 Mar 2025
Other - TechnicalFile: SRO Certificate_RPM_MCHI_517000_TNA_2626.pdf26 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance signed_A1.pdf26 Mar 2025
Layout approvalFile: TMC Approved Layout and Building Plan.pdf22 Mar 2025
Building plan approvalFile: TMC Approved Layout and Building Plan.pdf22 Mar 2025
PAN CardFile: RBD PAN CARD.pdf22 Mar 2025
Copy of Layout Approval (in case of layout)File: TMC Approved Layout and Building Plan.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1_A1 A2.pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_A1 and A2_MANOJ.pdf22 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Building Permission.pdf22 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: TMC Approved Layout and Building Plan.pdf22 Mar 2025

How this compares with Thane

49%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAMESHWAR PARK - A1 AND A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sector-11, Mouje-Dawale,7,600+ in Thane

2 kmRAMESHWAR PARK - A1 AND Completed 37Lapsed / revoked 17Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 106 registered projects within 2 km.

Builder: RAMESHAWAR BUILDERS & DEVELOPERS

RAMESHAWAR BUILDERS & DEVELOPERS has 6 registrations on MahaRERA, including RAMESHWAR PARK (ORCHID, IRIS & ROSE) and RAMESHWAR PARK - DAFFODIL A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RAMESHWAR PARK - A1 AND A2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAMESHWAR PARK - A1 AND A2?

The registered promoter entity is RAMESHAWAR BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAMESHWAR PARK - A1 AND A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAMESHWAR PARK - A1 AND A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAMESHWAR PARK - A1 AND A2?

The professionals named in the filing: Architect: SAMEER S LOTKE AND ASSOCIATES; Engineer: PANKAJ KUMAR GUPTA; Chartered Accountant: Mehta Mihir and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAMESHWAR PARK - A1 AND A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAMESHWAR PARK - A1 AND A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAMESHWAR PARK - A1 AND A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.