ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Ramchandra residency bldg no.1

Completed No litigation declared Residential / Group Housing project

Ramchandra residency bldg no.1

By Himali Construction

RG-MH-25538 · RERA P99000010975 · Last updated on MahaRERA portal: 6 Apr 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 50 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Sep 2022Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 33 documents Report an error

Ramchandra residency bldg no.1 is a Residential / Group Housing project by Himali Construction in Palghar, Maharashtra, registered with MahaRERA as P99000010975 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2022. The completion date has moved by 50 months from the original filing.

At a glance

Project

  • NameRamchandra residency bldg no.1
  • TypeResidential / Group Housing
  • Location
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000010975
  • ReraGenie IDRG-MH-25538

Builder

  • NameHimali Construction
  • Entity typePartnership
  • GSTIN27AAEFH2859Q1ZP
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersViraj Bharat Makwana, NIHIR JITENDRA MAKWANA, ANKIT BHARAT MAKWANA
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseJul 2018Revised toSep 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Sep 2022
  • Revised completionRevised to 30 Sep 2022 (originally 31 Jul 2018)
  • Buildings1 building record
  • Documents filed33 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ramchandra recideny bldg 1NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Ramchandra recideny bldg 1: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities16

As on 6 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
LIFTYes80%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Open Space35

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,350 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Pandurang Ramchandra PatilVasai-Virar City (M Corp)Palghar
Vishwanath Ramchnadra PatilVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI2301.11
Proposed, not sanctioned2,230 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround floor , Makwana complex veer Savarkar rd Virar East

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE & ASSOCIATES
EngineerSURESHKUMAR M PANICKER
PartnerRole in project
Himali Construction-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000000624Jul 2018 → May 2020

Reason as filed by the promoterPut up for Amendment of 2 Flats pending for approval .

EXT99000002535Jul 2018 → May 2020

Reason as filed by the promoterwe got approval of amendment of two flats on dated 27/09/2019 in the said building and want time for FIRE noc and OCCUPATION CERTIFICATE of the said building.

EXT99000010003Jul 2018 → Mar 2022

Reason as filed by the promoterThe Residential Building No.1, Wing - A & B of Ramchandra Residency has been completed in all aspects with modifications in plans and is fit for occupancy. ducts shown in the approved plans are enclosed at site & as per as built plans the case is now submitting for amendment. After this amendment the building no.1, wing-A & B will be submitted for occupancy certificate as per as built amended plan and will be granted OC Soon. Also due to COVID-19 situation, everything was closed and the Municipal Authorities were understaffed and have recently begun operations. Kindly grant Extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Mar 2022

Documents filed33

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf6 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf13 Mar 2022
Layout approvalFile: LAYOUT PLAN.pdf28 Jul 2021
Building plan approvalFile: FLOOR PLAN A WING.pdf28 Jul 2021
Building plan approvalFile: FLOOR PLAN B WING.pdf28 Jul 2021
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf28 Jul 2021
Building Plan Approval (IOD)File: FLOOR PLAN A WING.pdf28 Jul 2021
Building Plan Approval (IOD)File: FLOOR PLAN B WING.pdf28 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Amended CC.pdf28 Jul 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf28 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer CErtificate.pdf23 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21.pdf23 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf21 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 FY-19-20.pdf21 Jul 2021
Disclosure of sold/ booked inventoryFile: List of Sold Inventories-till 24-06-2021.pdf24 Jun 2021
OtherFile: Himali Construction Booking Details.pdf30 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 FY- 17-18.pdf24 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 FY 18-19.pdf24 Dec 2019
OtherFile: MCHI MEMBERSHIP CERTIFICATE.pdf24 Dec 2019
Layout approvalFile: Copy of Lay Out.pdf28 Jul 2017
Building plan approvalFile: Plan copy.pdf28 Jul 2017
PAN CardFile: Plan copy.pdf28 Jul 2017
Copy of the legal title reportFile: title clearance Report.pdf28 Jul 2017
Copy of the legal title reportFile: search report.pdf28 Jul 2017
Details of encumbrancesFile: Details of Encamburance.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy of Lay Out.pdf28 Jul 2017
Building Plan Approval (IOD)File: Plan copy.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Jul 2017
Declaration in FORM BFile: Declaration Affidavit Form B.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archit certificate.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA certificate.pdf28 Jul 2017
Proforma of Allotment letterFile: draft Sales Agreement with Allotment.pdf28 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 50 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ramchandra residency bldg no.1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai-Virar City (M Corp)3,200+ in Palghar

2 kmRamchandra residency bldCompleted 77Lapsed / revoked 47Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 205 registered projects within 2 km.

Builder: Himali Construction

Himali Construction has 2 registrations on MahaRERA, including Ramchandra residency bldg no.1 and Ramchandra Residency Building No. 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Ramchandra residency bldg no.1 is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ramchandra residency bldg no.1?

The registered promoter entity is Himali Construction, a partnership as per the filing. Its GSTIN 27AAEFH2859Q1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ramchandra residency bldg no.1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ramchandra residency bldg no.1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ramchandra residency bldg no.1?

The professionals named in the filing: Architect: AJAY WADE & ASSOCIATES; Engineer: SURESHKUMAR M PANICKER. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ramchandra residency bldg no.1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ramchandra residency bldg no.1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ramchandra residency bldg no.1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.