Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2030Possession promisedno revision filed
3 of 16Construction stages donefurthest along: RCC or MS Framed structure, 85%
7 of 16Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 69 documents Report an error

RAMA RANGA is a Residential/Group Housing project by V.P BUILDERS in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/150526/008661 on 15 May 2026. Possession is promised by 31 Dec 2030. 9 of the 16 units on this registration are recorded sold or booked, and 3 of 16 construction stages are filed complete.

At a glance

Project

  • NameRAMA RANGA
  • TypeResidential/Group Housing
  • Location
    • Udupi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1273/318/PR/150526/008661
  • ReraGenie IDRG-KA-71902

Builder

  • NameV.P BUILDERS
  • Entity typeProprietorship
  • GSTIN29AJJPA6711G1ZD
  • Authorized SignatoryK PRASAD ACHARYA
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 May 2026
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

56%9 of 16 units booked
40.1%Of the estimated cost spent so far

Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAMA RANGA---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 16 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 85%.

Building: 39% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)35%
Retaining wall (All types)25%
RCC or MS Framed structure85%
Masonry Construction70%
Plastering inside , outside & Ceiling55%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification25%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing25%
Painting0%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes50%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes50%
TerraceYes30%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
P RAMARAYA SHENOY & RANGANATH SHENOY--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.02 cr
Cost incurredRs 1.61 cr
Spent of the estimate40.06%
BuildingWingEstimatedIncurred
-NARs 4.02 crRs 1.61 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHALINI SURESH
EngineerBHARATH BHUSHAN
Chartered AccountantT PRASHANTHA HOLLA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed69

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/150526/008661 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: form 4 300926 CA.pdf13 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: architect certificate.pdf13 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate.pdf13 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: form 4 300626 signed.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architect.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: engineer.pdf15 Jul 2026
WATER NOCFile: water noc.pdf14 May 2026
CLARIFICATIONFile: clarification.pdf14 May 2026
RTC, survey 93/46,93/49,93/55-
Mutation, survey 93/46,93/49,93/55-
Encumbrance Certificate, survey 93/46,93/49,93/55-
Conversion/Alienation Order, survey 93/46,93/49,93/55-
JDA, survey 93/46,93/49,93/55-
Khatha, survey 93/46,93/49,93/55-
GST CertificateFile: GST.pdf-
Certificate issued by CA Form 1File: From - 1 CA report.pdf-
Certificate issued by Architect Form 2File: Architect's Certificate form 2.pdf-
Certificate issued by Engineer Form 3File: Form - 3, Engineer (PR).pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Balance Sheet 2024 - 2025File: BS AY 2025-26.pdf-
Balance Sheet 2023 - 2024File: BS AY 2024-25.pdf-
Balance Sheet 2022 - 2023File: BS AY 2023-24.pdf-
Audited Profit and Loss Statement 2024 - 2025File: PL AY 2025-26.pdf-
Audited Profit and Loss Statement 2023 - 2024File: PL AY 2024-25.pdf-
Audited Profit and Loss Statement 2022 - 2023File: PL AY 2023-24.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: ITR AY 2025-26.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR AY 2024-25.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR AY 2023-24.pdf-
Building licence-
approved plan-
Single Layout-
stability certificate with stractural engineer licence-
specification-
Brochure-
Relinguishment deed-
proforma AOS-
proforma allottment letter-
form b-
affidavit 3(1)-
jda affidavit-
search report-
Mescom noc-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Estimation cost-
title deed p ramray shenoy_compressed-
GPA PPC-
Architect's Certificate form 5-
Form -6, Engineer-
Mescom fee receipt-
declaration on borewell-
land cost sheet with guidance value-
Location map with boundary point-
carpet area statement-
CDP plan-
Village map-
STP drawing-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
RED STONE ENCLAVEPROPOSED PLAN OF RESIDENTIAL APARTMENT AT , S. NO.55/1A1 & PID No -27-5-564-7A OF MOODANIDAMBOOR VILLAGE,UDUPICompleted-Not delivered

How this compares with Udupi

56%of this project is bookeddistrict median 0%
22%of Udupi projects moved their completion datethis one has not
0%of Udupi registrations have lapsed or been cancelledthis one is on the register

Computed across the 260+ Udupi projects on ReraGenie, from their own filings.

Keep RAMA RANGA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Udupi260+ in Udupi

Builder: V.P BUILDERS

V.P BUILDERS has 2 registrations on RERA Karnataka, including RAMA RANGA and RED STONE ENCLAVE. Its filings disclose 2 earlier RERA Karnataka projects, none completed yet. Read the full track record. See more projects on the Udupi district page.

Frequently asked questions

What are my rights if RAMA RANGA is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of RAMA RANGA?

The registered promoter entity is V.P BUILDERS, a proprietorship as per the filing. Its GSTIN 29AJJPA6711G1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in RAMA RANGA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at RAMA RANGA?

The professionals named in the filing: Architect: SHALINI SURESH; Engineer: BHARATH BHUSHAN; Chartered Accountant: T PRASHANTHA HOLLA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAMA RANGA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAMA RANGA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAMA RANGA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.