Home / Browse projects / Mumbai Suburban, Maharashtra / RAKYAN IMPERIA

Registered No litigation declared Residential / Group Housing project

RAKYAN IMPERIA

By RR BRICKCON LLP

RG-MH-19017 · RERA P51800077985 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
39 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

RAKYAN IMPERIA is a Residential / Group Housing project by RR BRICKCON LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077985 on 14 Nov 2024. Possession is promised by 30 Sep 2027. 13 of the 52 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameRAKYAN IMPERIA
  • TypeResidential / Group Housing
  • Location
    • P M ROAD
    • VILE PARLE EAST
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800077985
  • ReraGenie IDRG-MH-19017

Builder

  • NameRR BRICKCON LLP
  • Entity typePartnership
  • GSTIN27AAUFR4184J1ZF
  • PartnersSAMKIT RAJIV RAKYAN, VIJAY CHHOTALAL VAJANI
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2024PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Nov 2024
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed69 files

Current status

25%13 of 52 units booked
55.8%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA9926026
B WINGNA9926026

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

A WING61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed71

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots71
Closed/Covered57
Open Space14
BuildingClosed/CoveredOpen SpaceTotal
A WING24428
B WING331043

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,411 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
SAMKIT RAJIV RAKYANAndheriMumbai Suburban
RAKYAN INFRA LLPAndheriMumbai Suburban
Bank of Baroda bombay employees co-op hou soc ltdVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4185.2
Proposed, not sanctioned4,185 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchunit no 9 10 sagar tech plaza a wing andheri kurla road, sakinaka mumbai 400072
Estimated costRs 23.52 cr
Cost incurredRs 13.11 cr
Work done55.75%
BuildingWingEstimatedIncurred
A WINGNARs 11.76 crRs 6.56 cr
B WINGNARs 11.76 crRs 6.56 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKEY-ARCH
EngineerUNISTEPS CONSULTING
Chartered AccountantSACHIN H CHORDIYA & CO
Chartered AccountantA K ANAND & CO
Chartered AccountantPATEL PARTH D & ASSOCIATES
Chartered Accountantrajnikant sahu
PartnerRole in project
RR BRICKCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form - 2a.pdf21 Apr 2026
Form 5 (FY 2025-2026)File: form - 5 25-26.pdf21 Apr 2026
Withdrawal Update Form 1File: form - 1.pdf15 Apr 2026
Withdrawal Update Form 2File: form - 2.pdf15 Apr 2026
Withdrawal Update Form 3File: form - 3.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM - 1 Q3.pdf13 Apr 2026
Withdrawal Update Form 2File: FORM - 2 Q3.pdf13 Apr 2026
Withdrawal Update Form 3File: form -3 Q3.pdf13 Apr 2026
Withdrawal Update Form 1File: form - 1.pdf16 Jan 2026
Withdrawal Update Form 1File: FORM - 1 Q3.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM - 2.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM - 2 Q3.pdf16 Jan 2026
Withdrawal Update Form 3File: form -3 Q3.pdf16 Jan 2026
Withdrawal Update Form 3File: form -3 Q3.pdf16 Jan 2026
Form 5 (FY 2024-2025)File: form - 5.pdf15 Oct 2025
Commencement certificateFile: FULL CC.pdf11 Oct 2025
Withdrawal Update Form 1File: form - 1.pdf11 Oct 2025
Withdrawal Update Form 2File: FORM - 2.pdf11 Oct 2025
Withdrawal Update Form 3File: FORM -3.pdf11 Oct 2025
Form 1File: architect certificate April to June.pdf15 Jul 2025
Form 2File: form - 2 June-2025..pdf15 Jul 2025
Form 3File: Scan FORM_-3_FINAL april to june.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Scan disclosure of flats sold unsold.pdf15 Jul 2025
Form 2A (FY 2024-2025)File: Form - 2A quality assurance certificate.pdf15 Jul 2025
Form 1File: rera certificate Rakyan Imperia March 25.pdf7 Jul 2025
Form 2File: Form 2 March-2025.pdf7 Jul 2025
Form 3File: Scan FORM -3 mar 2025.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Scan disclosure of flats.pdf7 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera certificate Rakyan Imperia March.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan FORM -3.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF FLATS.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF FLATS.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan CA Certificate RERA_compressed.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan CA Certificate RERA_compressed.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Other - Legal.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form3 - 26-10-2024.pdf28 Oct 2024
Other - LegalFile: Scan declaration from developer.pdf28 Oct 2024
Other - FinanceFile: Scan INVENTORY WORKING ON LETTERHEAD R.pdf28 Oct 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES DECLARATION.pdf24 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT - A bank letter.pdf24 Oct 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES DECLARATION.pdf24 Oct 2024
Proforma of Allotment letterFile: Scan Model Allotment Letter_11zon.pdf15 Oct 2024
Deviation Report with respect to Allotment letterFile: Scan No Deviation.pdf15 Oct 2024
Other - TechnicalFile: Scan Declaration-Cum-Undertaking.pdf14 Oct 2024
Proforma of Agreement for saleFile: Model Draft Agreement_11zon.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF FLATS.pdf8 Oct 2024
CERSAI detailsFile: Scan Letter Of Undertaking - CRESAI.pdf7 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT - B.pdf7 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: 20240923-131856.pdf7 Oct 2024
Declaration about Commencement CertificateFile: 8 DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf2 Aug 2024
PAN CardFile: PAN RR Brick Con LLP.pdf9 Jul 2024
Details of encumbrances concerned to FinanceFile: No Encrumbrance Certificate.pdf26 Jun 2024
Details of encumbrances concerned to LegalFile: No Encrumbrance Certificate.pdf26 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: othe disclosure .pdf26 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for sale Model.pdf19 Jun 2024
Copy of the legal title reportFile: Title Certificate New.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Annexure A.pdf14 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate on letter head .pdf14 Jun 2024
Layout approvalFile: IOD Drawing.pdf30 May 2024
Copy of Layout Approval (in case of layout)File: IOD Drawing.pdf30 May 2024
Building plan approvalFile: IOD Drawing.pdf29 May 2024
Declaration in FORM BFile: 9 Affidavit cum Declaration BOB SCAN.pdf29 May 2024
Commencement Certificates / NA Order for plotted developmentFile: form A Commencement certificate .pdf29 May 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing.pdf29 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
AUDUMBAR NIWAS CHSPARLA EAST P.M ROAD30CompletedDec 2022Dec 2022

How this compares with Mumbai Suburban

25%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAKYAN IMPERIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILE PARLE EAST6,700+ in Mumbai Suburban

2 kmRAKYAN IMPERIACompleted 141Lapsed / revoked 75Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 349 registered projects within 2 km.

Builder: RR BRICKCON LLP

RR BRICKCON LLP has 1 registration on MahaRERA, including RAKYAN IMPERIA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RAKYAN IMPERIA is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAKYAN IMPERIA?

The registered promoter entity is RR BRICKCON LLP, a partnership as per the filing. Its GSTIN 27AAUFR4184J1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAKYAN IMPERIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAKYAN IMPERIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAKYAN IMPERIA?

The professionals named in the filing: Architect: KEY-ARCH; Engineer: UNISTEPS CONSULTING; Chartered Accountant: SACHIN H CHORDIYA & CO; Chartered Accountant: A K ANAND & CO; Chartered Accountant: PATEL PARTH D & ASSOCIATES; Chartered Accountant: rajnikant sahu. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAKYAN IMPERIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAKYAN IMPERIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAKYAN IMPERIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.