Rajkamal Park Co-Op Housing Society Ltd

By D & T PROPERTIES

RG-MH-27561 · RERA P52100033719 · Last updated on MahaRERA portal: 6 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Rajkamal Park Co-Op Housing Society Ltd is a Residential / Group Housing project by D & T PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100033719 on 8 Mar 2022. Possession was promised by 31 Dec 2024 and is now 22 months past that date. 2 complaints are on record with the regulator.

At a glance

Project

  • NameRajkamal Park Co-Op Housing Society Ltd
  • TypeResidential / Group Housing
  • Location
    • Sanewadi Road
    • Sanewadi
    • Aundh
    • Aundhe kh.
    • Mawal
    • Pune
    • 411007
  • Pincode411007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033719
  • ReraGenie IDRG-MH-27561

Builder

  • NameD & T PROPERTIES
  • Entity typePartnership
  • PartnersAbhishek Prasad Deshpande, Vishnu Savalaram Tonde
  • Other registrations7 more →
  • Completed2 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

22 months past promisethis monthRegisteredMar 2022PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Mar 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rajkamal Park Co Op Housing Society LtdNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Rajkamal Park Co Op Housing Society Ltd: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area840 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Feb 2026
LandownerVillageDistrict
Rajkamal Park CoOp Housing Society LtdAundhe kh.Pune

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI2733.0
Proposed, not sanctioned1,476 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNew DP Road Aundh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShinde Joshi & Associates
ArchitectRupesh Kishor Jamkhiondikar
EngineerKaran Deepak Tambe
Chartered AccountantMahesh Ankush Ghare
PartnerRole in project
D & T PROPERTIES-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12601078Manish Jayant KulkarniD & T PROPERTIES27/02/2026
CC12600525Siddharth Milind RaskarVISHNU SAVALRAM TONDE (Promoter)30/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Feb 2025

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA Form I 090524.pdf6 Feb 2026
Withdrawal Update Form 1File: RERA Form I 090524.pdf6 Feb 2026
Withdrawal Update Form 2File: EnggCertificate New 31032024.pdf6 Feb 2026
Withdrawal Update Form 2File: EnggCertificate New 31032024.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 30062024.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 30062024.pdf6 Feb 2026
Layout approvalFile: PLan 1.pdf20 Feb 2025
Building plan approvalFile: Plan 2.pdf20 Feb 2025
Building plan approvalFile: Plan 3.pdf20 Feb 2025
Copy of Layout Approval (in case of layout)File: PLan 1.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF20 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf20 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf20 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf20 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4.PDF20 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Circular 29.PDF20 Feb 2025
Declaration about Commencement CertificateFile: CC Declaration 2nd.pdf6 Jul 2024
Declaration about Commencement CertificateFile: CC Declaration 3rd.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 31032023.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 30062023.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 31092023.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 31122023.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 31032024.pdf6 Jul 2024
Layout approvalFile: Plan 01 (3).pdf4 Jul 2024
Building plan approvalFile: Plan 02 (2).pdf4 Jul 2024
Building plan approvalFile: Plan 03 (2).pdf4 Jul 2024
Building plan approvalFile: Plan 03 (2).pdf4 Jul 2024
Building plan approvalFile: Plan 03 (2).pdf4 Jul 2024
Building plan approvalFile: Plan 03 (2).pdf4 Jul 2024
Building plan approvalFile: Plan 03 (2).pdf4 Jul 2024
Layout approvalFile: Plan 01 (3).pdf4 Jul 2024
Building plan approvalFile: Plan 03 (2).pdf4 Jul 2024
Copy of Layout Approval (in case of layout)File: Plan 01 (3).pdf4 Jul 2024
Copy of Layout Approval (in case of layout)File: Plan 01 (3).pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 02 (2).pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 03 (2).pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 03 (2).pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 03 (2).pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 03 (2).pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 03 (2).pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 03 (2).pdf4 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30062023.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30092023.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31122023.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I 090524.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate New 3132023.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate 30062023.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate 30092023.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate New 31122023.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EnggCertificate New 31032024.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EnggCertificate New 31032024.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31032023.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30062023.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30092023.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31122023.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31032024.pdf4 Jul 2024
Building plan approvalFile: Plan 01.pdf23 Feb 2023
Building plan approvalFile: Plan 02.pdf23 Feb 2023
Building plan approvalFile: Plan 03.pdf23 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 01.pdf23 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 02.pdf23 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 03.pdf23 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Rajkamal CC.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rajkamal CC.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_compressed.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rajkamal 31122021.pdf3 Mar 2022
Layout approvalFile: scan01.pdf28 Feb 2022
Layout approvalFile: scan02.pdf28 Feb 2022
Building plan approvalFile: NA Order.pdf28 Feb 2022
PAN CardFile: D T Pan.pdf28 Feb 2022
Copy of the legal title reportFile: Title Search Report.pdf28 Feb 2022
Copy of the legal title reportFile: Title Search Report 1.pdf28 Feb 2022
Details of encumbrancesFile: SELF DECLARATION encumbrances.pdf28 Feb 2022
Copy of Layout Approval (in case of layout)File: scan01.pdf28 Feb 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Gayatri ApartmentPlot No 18 S No 132 Aundh Pune 41100712CompletedApr 2020Feb 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rajkamal Park Co-Op Housing Society Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sanewadi, Aundh13,700+ in Pune

2 kmRajkamal Park Co-Op HousCompleted 43Lapsed / revoked 14Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 139 registered projects within 2 km.

Builder: D & T PROPERTIES

D & T PROPERTIES has 8 registrations on MahaRERA, including GAYTRI APARTMENT and GEETANJALI NAMANA APARTMENT. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Rajkamal Park Co-Op Housing Society Ltd shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Rajkamal Park Co-Op Housing Society Ltd is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rajkamal Park Co-Op Housing Society Ltd?

The registered promoter entity is D & T PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rajkamal Park Co-Op Housing Society Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Rajkamal Park Co-Op Housing Society Ltd?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Rajkamal Park Co-Op Housing Society Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rajkamal Park Co-Op Housing Society Ltd?

The professionals named in the filing: Architect: Shinde Joshi & Associates; Architect: Rupesh Kishor Jamkhiondikar; Engineer: Karan Deepak Tambe; Chartered Accountant: Mahesh Ankush Ghare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rajkamal Park Co-Op Housing Society Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rajkamal Park Co-Op Housing Society Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rajkamal Park Co-Op Housing Society Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.