RAJIBAI VILLAGE

By PIPASA CONSTRUCTION

RG-MH-38812 · RERA P99000015875 · Last updated on MahaRERA portal: 12 Nov 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 70%
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

RAJIBAI VILLAGE is a Residential / Group Housing project by PIPASA CONSTRUCTION in Palghar, Maharashtra, registered with MahaRERA as P99000015875 on 28 Mar 2018. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 27 months from the original filing.

At a glance

Project

  • NameRAJIBAI VILLAGE
  • TypeResidential / Group Housing
  • Location
    • CHANDANSAR ROAD
    • CHANDANSAR
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000015875
  • ReraGenie IDRG-MH-38812

Builder

  • NamePIPASA CONSTRUCTION
  • Entity typePartnership
  • PartnersPRAKASH MOHAN PATIL, HARESHWAR KAMALAKAR PATIL
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredMar 2018First promiseSep 2021Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Mar 2018
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 5 Sep 2021)
  • Buildings2 building records
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA50000
Building No 2NA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 70%.

BUILDING NO 179%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Building No 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 12 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
LiftYes100%

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area955 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
JANARDAN JAU PATILVasai-Virar City (M Corp)Palghar
SHAKUNTALA DATTATREY PATILVasai-Virar City (M Corp)Palghar
SANDHYA M PATILVasai-Virar City (M Corp)Palghar
SWAPNA A PATILVasai-Virar City (M Corp)Palghar
SWAPNA PATILVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI2876.21
Proposed, not sanctioned955 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1 ST FLOOR PRATHAMESH PLAZA OPP PREMIUM PARK BOLINJ VIRAR WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY GURAV & ASSOCIATES
EngineerVIJAY GURAV & ASSOCIATES
Chartered AccountantRAJESH P KOTAK
PartnerRole in project
PIPASA CONSTRUCTION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000010833Sep 2021 → Mar 2022

Reason as filed by the promoterTo MahaRERA, I Mr. Kishor Patil partner of M/s. Pipasa Construction do hereby apply for extension of project expiry date upto 31st March, 2022 as I was not able to complete the before the expiry date i.e. 05th September, 2021 due to lockdown imposed by government because of Covid-19 pandemic. Kindly request to grant me an extension so that I can finish the project at the earliest.

EXT99000012739Sep 2021 → Dec 2023

Reason as filed by the promoterSir/Madam, We have applied for extension as we have got permission to construct additional premises due to revised CC & Layout Plan which is under process and the same will be uploaded as it is received. Kindly grant the extension so that I can continue with the registration of remaining constructed flats. Thanking You in advance.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf12 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate for Quality Assurance Form 2A Dummy.pdf12 Nov 2022
Certificates of CA (Form 3)File: CA Certificate Form 3 Dummy.pdf12 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) Dummy.pdf12 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Nov 2022
PAN CardFile: PAN.pdf3 Nov 2022
Details of encumbrances concerned to FinanceFile: Architect Certificate.pdf3 Nov 2022
Details of encumbrances concerned to LegalFile: Architect Certificate.pdf3 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Edited and Uploaded.pdf3 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200251244239_For_Asset_Based_Search_03_11_2022_12_38_43_837.pdf3 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf27 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: PIPASA RERA 19-20.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PIPASA RERA 20-21.pdf30 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate_11zon.pdf17 Sep 2021
Layout approvalFile: Building Layout Plan Revised.pdf1 Sep 2021
Building plan approvalFile: Building Floor Plan Revised.pdf1 Sep 2021
Copy of Layout Approval (in case of layout)File: Building Layout Plan Revised.pdf1 Sep 2021
Building Plan Approval (IOD)File: Building Floor Plan Revised.pdf1 Sep 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf29 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf29 Aug 2021
Certificates of CA (Form 3)File: ca Certificate for rera 02 compressed.pdf14 Apr 2021
Certificates of CA (Form 3)File: Pipasa.pdf25 Mar 2018
Building plan approvalFile: plan 2.pdf24 Mar 2018
Details of encumbrancesFile: Pipasa Con Certify Letter.pdf24 Mar 2018
Building Plan Approval (IOD)File: plan 2.pdf24 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ilovepdf_jpg_to_pdf.pdf24 Mar 2018
Layout approvalFile: plan 1.pdf23 Mar 2018
Layout approvalFile: plan 2.pdf23 Mar 2018
Copy of Layout Approval (in case of layout)File: plan 1.pdf23 Mar 2018
Copy of Layout Approval (in case of layout)File: plan 2.pdf23 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Revised CC 2-min-ilovepdf-compressed.pdf23 Mar 2018
Declaration in FORM BFile: Pipasa Con Declaration.pdf23 Mar 2018
Proforma of Allotment letterFile: Allotment Letter.pdf23 Mar 2018
Proforma of Allotment letterFile: Agreement.pdf23 Mar 2018
Copy of the legal title reportFile: title 18 guntha.pdf13 Mar 2018

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 27 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAJIBAI VILLAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHANDANSAR3,200+ in Palghar

2 kmRAJIBAI VILLAGECompleted 7Lapsed / revoked 8Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: PIPASA CONSTRUCTION

PIPASA CONSTRUCTION has 2 registrations on MahaRERA, including RAJIBAI VILLAGE and RAJIBAI VILLAGE BUILDING NO.2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that RAJIBAI VILLAGE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RAJIBAI VILLAGE is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJIBAI VILLAGE?

The registered promoter entity is PIPASA CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJIBAI VILLAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAJIBAI VILLAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAJIBAI VILLAGE?

The professionals named in the filing: Architect: VIJAY GURAV & ASSOCIATES; Engineer: VIJAY GURAV & ASSOCIATES; Chartered Accountant: RAJESH P KOTAK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAJIBAI VILLAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJIBAI VILLAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJIBAI VILLAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.