RAJESHWARI RESIDENCY PHASE II

By SHREE SIDDHI CONSTRUCTION

RG-MH-28253 · RERA P51700025220 · Last updated on MahaRERA portal: 19 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 33 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 33 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
22 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

RAJESHWARI RESIDENCY PHASE II is a Residential / Group Housing project by SHREE SIDDHI CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700025220 on 23 Mar 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 33 months from the original filing. 20 of the 42 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameRAJESHWARI RESIDENCY PHASE II
  • TypeResidential / Group Housing
  • Location
    • UMBHARANI
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • RERA no.P51700025220
  • ReraGenie IDRG-MH-28253

Builder

  • NameSHREE SIDDHI CONSTRUCTION
  • Entity typePartnership
  • PartnerADITYA CHANDRAKANT BHOIR
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2020First promiseMar 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Mar 2020
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Mar 2025)
  • Buildings1 building record
  • Documents filed80 files

Current status

48%20 of 42 units booked
100.0%Work done, per cost certificate

Figures as on 19 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAJESHWARI RESIDENCYNA8842042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

RAJESHWARI RESIDENCY: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,428 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Dec 2025

Approvals and building plan

Sanctioning authorityADTP KALYAN DOMBIVLI MUNICIPAL COUNCIL KALYAN
Permissible FSI1528.0
Proposed, not sanctioned1,428 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOCULDHAM COMPLEX KALYAN
Estimated costRs 3.99 cr
Cost incurredRs 3.99 cr
Work done100.0%
BuildingWingEstimatedIncurred
RAJESHWARI RESIDENCYNARs 3.24 crRs 3.24 cr
-NARs 75.00 lakhRs 75.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCREATIONS ARCHITECTS & INTERIOR DESIGNERS
ArchitectCREATIONS ARCHITECT AND INTERIOR DESIGNERS
EngineerAARNA STRUCTURAL CONSULTANTS
EngineerRaviprakash Dube
Chartered AccountantMAYUR K JAIN & CO
PartnerRole in project
SHREE SIDDHI CONSTRUCTION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700028359Mar 2025 → Mar 2026

Reason as filed by the promoterAs per submission attached.

EA27022620043Mar 2025 → Dec 2027

Reason as filed by the promoterWe, M/s RAJESHWARI RESIDENCY PHASE II, ("SHREE SIDDHI"), and we are writing you with regards to our application for extension of time till 31st December, 2027; 1. As you are aware that the company is engaged in the constructing a real estate project at Kalyan, Maharashtra on its plot of land comprising of 1 Building Wings having 7 floors.” [hereinafter collectively referred to as "the Proiect"). 2. We say that we obtained the Rera registration number P51700025220 on 23-03-2020 for Project RAJESHWARI RESIDENCY PHASE II at Kalyan, Thane. 3. We say that we have applied for the Part Occupancy Cert

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 (2).pdf19 May 2026
Withdrawal Update Form 2File: Form 2 (2).pdf19 May 2026
Withdrawal Update Form 3File: FORM 3 SIGNED.pdf19 May 2026
Form 2A (FY 2024-2025)File: Signed Form 2A.pdf26 Feb 2026
Form 1File: Form No 1 311225.pdf25 Feb 2026
Form 2File: form 2 eng 31122025.pdf25 Feb 2026
Form 3File: Signed Form-3 Shri Siddhi Construction 311225.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold List 311225.pdf25 Feb 2026
Form 1File: Form 1 30-09-25.pdf6 Dec 2025
Form 2File: Form 2 30-09-25.pdf6 Dec 2025
Form 3File: Form 3 30-09-25 Signed.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-09-25.pdf6 Dec 2025
Form 1File: Form 1 30-06-25.pdf5 Dec 2025
Form 2File: Form 2 30-06-25.pdf5 Dec 2025
Form 3File: Form 3 30-06-25.pdf5 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-06-25.pdf5 Dec 2025
Form 5 (FY 2024-2025)File: Form -5 Fy 2024-2025.pdf1 Oct 2025
Disclosure of sold/ booked inventoryFile: 31-03-2025.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032025.pdf16 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with signature.pdf16 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032025.pdf16 May 2025
Disclosure of sold/ booked inventoryFile: 31-03-2024.pdf16 May 2025
Disclosure of sold/ booked inventoryFile: Q1.pdf16 May 2025
Disclosure of sold/ booked inventoryFile: Q2 sign.pdf16 May 2025
Disclosure of sold/ booked inventoryFile: Q3 sign.pdf16 May 2025
Disclosure of sold/ booked inventoryFile: 31-03-2024.pdf16 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf16 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2024.pdf16 May 2025
Declaration in FORM BFile: Form B.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Rajeshwari Residency 30062023.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Rajeshwari Residency 30092023.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Rajeshwari Residency 31122023.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Q1.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: Q2 sign.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: Q3 sign.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-09-2024.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-12-2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-06-2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-09-2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-2024.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-03-2024 Sign_compressed.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-3 30-03-2024.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form-5 shree siddhi construction Sign Copy.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form- 31-03-2024.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-06-2024.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 --- 30 Dec 23.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 eng.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-06-2023.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2023.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-12-2023.pdf10 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_0001.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Progress Report-dec 23.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ref_77_130_639_ R-3_2023_MS CHANDRAKANT BHOIR_(05-12-2023).pdf14 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 11022023.pdf17 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-211221-signed.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-3132022-signed.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 11022023.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1-compressed.pdf16 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-compressed.pdf16 Aug 2021
Building plan approvalFile: commencement cert.pdf17 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: commencement cert.pdf17 Mar 2020
Declaration in FORM BFile: FORM B.pdf17 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 ISSUED_compressed.pdf17 Mar 2020
Proforma of Allotment letterFile: Allotment Letter Format.pdf17 Mar 2020
Proforma of Allotment letterFile: Agreement for Sale.pdf17 Mar 2020
Layout approvalFile: A_compressed.pdf16 Mar 2020
Layout approvalFile: B_compressed_compressed.pdf16 Mar 2020
PAN CardFile: pan card.pdf16 Mar 2020
Copy of the legal title reportFile: title certificate.pdf16 Mar 2020
Details of encumbrancesFile: no encumbrance cert.pdf16 Mar 2020
Copy of Layout Approval (in case of layout)File: A_compressed.pdf16 Mar 2020
Copy of Layout Approval (in case of layout)File: B_compressed_compressed.pdf16 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: commencement cert.pdf16 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect-form 1.pdf16 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf16 Mar 2020

How this compares with Thane

48%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 33 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAJESHWARI RESIDENCY PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UMBHARANI7,600+ in Thane

Builder: SHREE SIDDHI CONSTRUCTION

SHREE SIDDHI CONSTRUCTION has 2 registrations on MahaRERA, including RAJESHWARI RESIDENCY and RAJESHWARI RESIDENCY PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RAJESHWARI RESIDENCY PHASE II is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJESHWARI RESIDENCY PHASE II?

The registered promoter entity is SHREE SIDDHI CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJESHWARI RESIDENCY PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAJESHWARI RESIDENCY PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAJESHWARI RESIDENCY PHASE II?

The professionals named in the filing: Architect: CREATIONS ARCHITECTS & INTERIOR DESIGNERS; Architect: CREATIONS ARCHITECT AND INTERIOR DESIGNERS; Engineer: AARNA STRUCTURAL CONSULTANTS; Engineer: Raviprakash Dube; Chartered Accountant: MAYUR K JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAJESHWARI RESIDENCY PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJESHWARI RESIDENCY PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJESHWARI RESIDENCY PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.