Completed No litigation declared Residential / Group Housing project

Raj Tattva Phase II Wing C and D

By KOTHARI AUTOPARTS MANUFACTURERS PVT LTD

RG-MH-34059 · RERA P51700011539 · Last updated on MahaRERA portal: 8 Jan 2025

Source: official MahaRERA filing

Red flags

  • 14 complaints at MahaRERA
  • 3 extensions taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
14Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

Raj Tattva Phase II Wing C and D is a Residential / Group Housing project by KOTHARI AUTOPARTS MANUFACTURERS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700011539 on 31 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. 14 complaints are on record with the regulator.

At a glance

Project

  • NameRaj Tattva Phase II Wing C and D
  • TypeResidential / Group Housing
  • Location
    • Ghodbundar Road
    • Kapurbawadi
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700011539
  • ReraGenie IDRG-MH-34059

Builder

  • NameKOTHARI AUTOPARTS MANUFACTURERS PVT LTD
  • Entity typeCompany
  • DirectorHarish Raghavji Patel
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings2 building records
  • Documents filed110 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAJ TATTVA WING CNA330000
RAJ TATTVA WING DNA330000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

RAJ TATTVA WING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAJ TATTVA WING D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 8 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Closing ParkingYes100%

Parking filed474

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots474
Closed/Covered474
BuildingClosed/CoveredTotal
RAJ TATTVA WING C238238
RAJ TATTVA WING D236236

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,350 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI29713.36
Proposed, not sanctioned29,649 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAHURA CENTER MIDC ANDHERI EAST MUMBAI 400093

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnil Jagwani
EngineerH M Raje Structural Consultant Pvt Ltd
PartnerRole in project
KOTHARI AUTOPARTS MANUFACTURERS PVT LTD-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700009994Dec 2019 → Jun 2022

Reason as filed by the promoterRequest to kindly consider our plea for obtaining an extension for our Project ‘Raj Tattva Phase 2 Thane West, registered with the regulatory authority vide Registration number P51700011539, the term of which shall get over by 30.06.2021 • Due to various reasons like economic slowdown and the ongoing Pandemic and the subsequent lockdowns imposed by the Central Government & the State Government, and due to unavailability of labours due the said lockdowns, the said project work was not completed as per the scheduled date and the revised extended dates. • The Company M/s. Kothari Auto Parts Manuf

EXT51700003853Dec 2019 → Dec 2020

Reason as filed by the promoter1. Majority of our customers were seeking 98% Home Loan Finance. The loans were sanctioned and / or under process for sanction majorly by NBFC’s i.e. Indiabulls Housing Finance Limited, Micro Finance Ltd., DHFL etc. Since September 2018 there has been a liquidity crunch at these NBFC’s hence they are not able to disburse funds which in turn affected our construction progress leading to a virtual halt in construction activities. Further to add to the woes: a) The institutions which were earlier funding upto 98% put a cap on funding of upto 90% on cost of house. This lead to delays in receipt of

EXT51700017557Dec 2019 → Apr 2024

Reason as filed by the promoterDue to delay in construction initiation and financial constraint.

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC006000000171820Raj Tattva Flat Owners AssociationKothari Auto Parts Manufacturers Pvt. Ltd.11/12/2019
CC006000000261960Hemant Prakash SanghaiKothari Autoparts Manufacturers Private Limited20/07/2022
CC006000000375391Dr. Pushpa Pramod MohiteKothari Auto Parts Manufacturers Pvt. Ltd.26/04/2023
CC006000000408648HT MEDIA LIMITEDM/s Kothari Auto Parts Manufactures Private Limited28/12/2023
CC12400376Amit Kumar BhuwaniaKOTHARI AUTOPARTS MANUFACTURERS PVT LTD08/10/2024
CC12400375Maneet Singh AroraKOTHARI AUTOPARTS MANUFACTURERS PVT LTD08/10/2024
CC12400574Mohansingh Mangalsingh SodhiKOTHARI AUTOPARTS MANUFACTURERS PVT LTD25/10/2024
CC12400647Vijay Kondiba NarayankarKOTHARI AUTOPARTS MANUFACTURERS PVT LTD04/11/2024
CC12401001Krishnan NathanKOTHARI AUTOPARTS MANUFACTURERS PVT LTD03/12/2024
CC12401002Aniket Satish ShethKOTHARI AUTOPARTS MANUFACTURERS PVT LTD03/12/2024
CC12401045Nandkumar Shantaram TawdeKOTHARI AUTOPARTS MANUFACTURERS PVT LTD05/12/2024
CC12401204RUPALI JYOTIRMAI BHONDWALKARKOTHARI AUTOPARTS MANUFACTURERS PVT LTD21/12/2024
CC12502327Rakesh Dinkar PatilKOTHARI AUTOPARTS MANUFACTURERS PVT LTD10/07/2025
CC12502692Rajendra Laxman PatilKOTHARI AUTOPARTS MANUFACTURERS PVT LTD01/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 May 2024

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Raj Tattva - Form 4 - Project Closed.pdf8 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Raj Tatva C D - April 24_compressed.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Raj Tatva C D - April 24.pdf30 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 0400_001.pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) (1).pdf30 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Raj Tattva - Form 4 - Project Closed.pdf10 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Raj Tattva C and D.pdf7 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva - Form1 - Project Closed.pdf6 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Raj Tattva Wing C D - Full OC - Final.pdf6 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva Phase II wing C D - Form1 - Sep23.pdf21 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April 2021.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July 2021.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct 2021.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jan 2022.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April 2022.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July 2022.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct 2022.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jan 2023.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April 2023.pdf8 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Mar 22.pdf8 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Sept 21.pdf8 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Dec 21.pdf8 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Mar 23.pdf8 Jun 2023
Certificates of CA (Form 3)File: Raj Tattva2 15062020C.pdf24 Dec 2021
Certificates of CA (Form 3)File: Raj Tattva2 10092020C.pdf24 Dec 2021
Certificates of CA (Form 3)File: Raj Tattva2 10092020C.pdf24 Dec 2021
Certificates of CA (Form 3)File: Raj Tattva2 30112020C.pdf24 Dec 2021
OtherFile: NOC Raj Tattva.pdf22 Dec 2021
Disclosure of sold/ booked inventoryFile: Tattva PH2 Sold Unsold.pdf20 Dec 2021
Layout approvalFile: Lay out Tattva 2018.pdf6 Dec 2021
Copy of Layout Approval (in case of layout)File: Lay out Tattva 2018.pdf6 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: CC NOC-18-08-2018.pdf6 Dec 2021
Declaration about Commencement CertificateFile: Raj Tattva Circular 32.pdf6 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 12 Quality Assurance Certificate 10052021.PDF4 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 13 Quality Assurance Certificate 31072021.PDF4 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 01 Quality Assurance Certificate 05022019.PDF22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 02 Quality Assurance Certificate 30042019.PDF22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 03 Quality Assurance Certificate 25072019.PDF22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 04 Quality Assurance Certificate 20102019.PDF22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 06 Quality Assurance Certificate 15012020.PDF22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 07 Quality Assurance Certificate 10042020.PDF22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 08 Quality Assurance Certificate 15062020.PDF22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 09 Quality Assurance Certificate 10092020.PDF22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 10 Quality Assurance Certificate 30112020.PDF22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 11 Quality Assurance Certificate 15022021.PDF22 Oct 2021
Details of encumbrancesFile: RERA Lien Mortgage Certificate RTattva.pdf5 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Kothari Form 5 CD Ph2 FY20.pdf29 Sep 2021
Certificates of CA (Form 3)File: CA Raj Tattva PH2 CD 25072019 Com.pdf14 Sep 2021
Certificates of CA (Form 3)File: CA Raj Tattva PH2 CD 20102019 Com.pdf14 Sep 2021
Certificates of CA (Form 3)File: CA Raj Tattva PH2 CD 15012020 Com.pdf14 Sep 2021
Certificates of CA (Form 3)File: CA Raj Tattva PH2 CD 10042020 Com.pdf14 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 RERA Arc certificate CD wing 15012020.pdf7 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02 RERA Arc certificate CD wing 10042020.pdf7 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 03 RERA Arc certificate CD wing 15062020.pdf7 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 04 RERA Arc certificate CD wing 10092020.pdf7 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 RERA Arc certificate CD wing 30112020.pdf7 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 RERA Arc certificate CD wing 30112020.pdf7 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 06 RERA Arc certificate CD wing 15022021.pdf7 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 07 RERA Arc certificate CD wing 10052021.pdf7 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tattva Ph2 201019 Compressed.pdf7 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 03 Wing C D 15062020.pdf7 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 Wing C D 10092020.pdf7 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 05 Tattva Eng PH2 Wing CD 30112020.pdf7 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 06 Wing C D 15022021 (1) Compressed.pdf7 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07 Wing C D 10052021 (1) Compressed.pdf7 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 01 Tattva Eng PH2 Wing CD 15012020.pdf1 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 Tattva PH2 Wing CD 10042020.pdf1 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5 Raj Tattva Ph2 2019 YR KAMPL.pdf27 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva CD Wings ARC.pdf30 Sep 2019
Certificates of CA (Form 3)File: CA CERTIFICATE RAJ TATTVA PHASE 2 WING CD 30042019.pdf15 Jun 2019
Certificates of CA (Form 3)File: CA CERTIFICATE RAJ TATTVA PHASE 2 WING CD 05022019.pdf30 May 2019
Certificates of CA (Form 3)File: RAJ TATTVA PHASE 2 WING C D 200818.pdf28 May 2019
Certificates of CA (Form 3)File: CA CERTIFICATE RAJ TATTVA PHASE II WING CD 15112018.pdf28 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva wing C D RERA 30042019.pdf9 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tattva Sale CD 30042019 PH2.pdf9 May 2019
Certificates of CA (Form 5)File: CA CERTIFICATE RAJ TATTVA PHASE 2 WING CD 200818.pdf8 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva CD ARC 050219.pdf20 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tattva Sale CD 05022019.pdf20 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tattva CD PH 2 310518.pdf17 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva CD wings PH2 AR 200818.pdf17 Dec 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Raj Tattva Phase II Wing C and D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kapurbawadi7,600+ in Thane

2 kmRaj Tattva Phase II WingCompleted 173Lapsed / revoked 60Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 387 registered projects within 2 km.

Builder: KOTHARI AUTOPARTS MANUFACTURERS PVT LTD

KOTHARI AUTOPARTS MANUFACTURERS PVT LTD has 2 registrations on MahaRERA, including RAJ TATTVA PHASE 1 COMMERCIAL and Raj Tattva Phase II Wing C and D. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Raj Tattva Phase II Wing C and D is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Raj Tattva Phase II Wing C and D?

The registered promoter entity is KOTHARI AUTOPARTS MANUFACTURERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Raj Tattva Phase II Wing C and D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Raj Tattva Phase II Wing C and D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Raj Tattva Phase II Wing C and D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Raj Tattva Phase II Wing C and D?

The professionals named in the filing: Architect: Anil Jagwani; Engineer: H M Raje Structural Consultant Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Raj Tattva Phase II Wing C and D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Raj Tattva Phase II Wing C and D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Raj Tattva Phase II Wing C and D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.