Home / Browse projects / Thane, Maharashtra / Raj Tattva Phase II Wing C and D
Raj Tattva Phase II Wing C and D
By KOTHARI AUTOPARTS MANUFACTURERS PVT LTD
RG-MH-34059 · RERA P51700011539 · Last updated on MahaRERA portal: 8 Jan 2025
Source: official MahaRERA filing
Red flags
- 14 complaints at MahaRERA
- 3 extensions taken
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Raj Tattva Phase II Wing C and D is a Residential / Group Housing project by KOTHARI AUTOPARTS MANUFACTURERS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700011539 on 31 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. 14 complaints are on record with the regulator.
At a glance
Project
- NameRaj Tattva Phase II Wing C and D
- TypeResidential / Group Housing
- Location
- Ghodbundar Road
- Kapurbawadi
- Thane (M Corp.)
- Thane
- 400601
- Pincode400601
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700011539
- ReraGenie IDRG-MH-34059
Builder
- NameKOTHARI AUTOPARTS MANUFACTURERS PVT LTD
- Entity typeCompany
- DirectorHarish Raghavji Patel
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on31 Aug 2017
- Promised completion31 Dec 2019
- Revised completionNone
- Buildings2 building records
- Documents filed110 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RAJ TATTVA WING C | NA | 33 | 0 | 0 | 0 | 0 |
| RAJ TATTVA WING D | NA | 33 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 8 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
RAJ TATTVA WING C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RAJ TATTVA WING D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 8 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Closing Parking | Yes | 100% |
Parking filed474
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| RAJ TATTVA WING C | 238 | 238 |
| RAJ TATTVA WING D | 236 | 236 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anil Jagwani |
| Engineer | H M Raje Structural Consultant Pvt Ltd |
| Partner | Role in project |
|---|---|
| KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRequest to kindly consider our plea for obtaining an extension for our Project ‘Raj Tattva Phase 2 Thane West, registered with the regulatory authority vide Registration number P51700011539, the term of which shall get over by 30.06.2021 • Due to various reasons like economic slowdown and the ongoing Pandemic and the subsequent lockdowns imposed by the Central Government & the State Government, and due to unavailability of labours due the said lockdowns, the said project work was not completed as per the scheduled date and the revised extended dates. • The Company M/s. Kothari Auto Parts Manuf
Reason as filed by the promoter1. Majority of our customers were seeking 98% Home Loan Finance. The loans were sanctioned and / or under process for sanction majorly by NBFC’s i.e. Indiabulls Housing Finance Limited, Micro Finance Ltd., DHFL etc. Since September 2018 there has been a liquidity crunch at these NBFC’s hence they are not able to disburse funds which in turn affected our construction progress leading to a virtual halt in construction activities. Further to add to the woes: a) The institutions which were earlier funding upto 98% put a cap on funding of upto 90% on cost of house. This lead to delays in receipt of
Reason as filed by the promoterDue to delay in construction initiation and financial constraint.
Complaints filed with MahaRERA14
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000171820 | Raj Tattva Flat Owners Association | Kothari Auto Parts Manufacturers Pvt. Ltd. | 11/12/2019 |
| CC006000000261960 | Hemant Prakash Sanghai | Kothari Autoparts Manufacturers Private Limited | 20/07/2022 |
| CC006000000375391 | Dr. Pushpa Pramod Mohite | Kothari Auto Parts Manufacturers Pvt. Ltd. | 26/04/2023 |
| CC006000000408648 | HT MEDIA LIMITED | M/s Kothari Auto Parts Manufactures Private Limited | 28/12/2023 |
| CC12400376 | Amit Kumar Bhuwania | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 08/10/2024 |
| CC12400375 | Maneet Singh Arora | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 08/10/2024 |
| CC12400574 | Mohansingh Mangalsingh Sodhi | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 25/10/2024 |
| CC12400647 | Vijay Kondiba Narayankar | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 04/11/2024 |
| CC12401001 | Krishnan Nathan | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 03/12/2024 |
| CC12401002 | Aniket Satish Sheth | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 03/12/2024 |
| CC12401045 | Nandkumar Shantaram Tawde | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 05/12/2024 |
| CC12401204 | RUPALI JYOTIRMAI BHONDWALKAR | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 21/12/2024 |
| CC12502327 | Rakesh Dinkar Patil | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 10/07/2025 |
| CC12502692 | Rajendra Laxman Patil | KOTHARI AUTOPARTS MANUFACTURERS PVT LTD | 01/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 May 2024
Documents filed110
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Raj Tattva - Form 4 - Project Closed.pdf | 8 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 - Raj Tatva C D - April 24_compressed.pdf | 30 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Raj Tatva C D - April 24.pdf | 30 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 0400_001.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) (1).pdf | 30 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Raj Tattva - Form 4 - Project Closed.pdf | 10 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Raj Tattva C and D.pdf | 7 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva - Form1 - Project Closed.pdf | 6 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Raj Tattva Wing C D - Full OC - Final.pdf | 6 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva Phase II wing C D - Form1 - Sep23.pdf | 21 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April 2021.pdf | 8 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July 2021.pdf | 8 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct 2021.pdf | 8 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jan 2022.pdf | 8 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April 2022.pdf | 8 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July 2022.pdf | 8 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct 2022.pdf | 8 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jan 2023.pdf | 8 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April 2023.pdf | 8 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Mar 22.pdf | 8 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Sept 21.pdf | 8 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Dec 21.pdf | 8 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Mar 23.pdf | 8 Jun 2023 |
| Certificates of CA (Form 3)File: Raj Tattva2 15062020C.pdf | 24 Dec 2021 |
| Certificates of CA (Form 3)File: Raj Tattva2 10092020C.pdf | 24 Dec 2021 |
| Certificates of CA (Form 3)File: Raj Tattva2 10092020C.pdf | 24 Dec 2021 |
| Certificates of CA (Form 3)File: Raj Tattva2 30112020C.pdf | 24 Dec 2021 |
| OtherFile: NOC Raj Tattva.pdf | 22 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Tattva PH2 Sold Unsold.pdf | 20 Dec 2021 |
| Layout approvalFile: Lay out Tattva 2018.pdf | 6 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: Lay out Tattva 2018.pdf | 6 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC NOC-18-08-2018.pdf | 6 Dec 2021 |
| Declaration about Commencement CertificateFile: Raj Tattva Circular 32.pdf | 6 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 12 Quality Assurance Certificate 10052021.PDF | 4 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 13 Quality Assurance Certificate 31072021.PDF | 4 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 01 Quality Assurance Certificate 05022019.PDF | 22 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 02 Quality Assurance Certificate 30042019.PDF | 22 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 03 Quality Assurance Certificate 25072019.PDF | 22 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 04 Quality Assurance Certificate 20102019.PDF | 22 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 06 Quality Assurance Certificate 15012020.PDF | 22 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 07 Quality Assurance Certificate 10042020.PDF | 22 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 08 Quality Assurance Certificate 15062020.PDF | 22 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 09 Quality Assurance Certificate 10092020.PDF | 22 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 10 Quality Assurance Certificate 30112020.PDF | 22 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 11 Quality Assurance Certificate 15022021.PDF | 22 Oct 2021 |
| Details of encumbrancesFile: RERA Lien Mortgage Certificate RTattva.pdf | 5 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Kothari Form 5 CD Ph2 FY20.pdf | 29 Sep 2021 |
| Certificates of CA (Form 3)File: CA Raj Tattva PH2 CD 25072019 Com.pdf | 14 Sep 2021 |
| Certificates of CA (Form 3)File: CA Raj Tattva PH2 CD 20102019 Com.pdf | 14 Sep 2021 |
| Certificates of CA (Form 3)File: CA Raj Tattva PH2 CD 15012020 Com.pdf | 14 Sep 2021 |
| Certificates of CA (Form 3)File: CA Raj Tattva PH2 CD 10042020 Com.pdf | 14 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 RERA Arc certificate CD wing 15012020.pdf | 7 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02 RERA Arc certificate CD wing 10042020.pdf | 7 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 03 RERA Arc certificate CD wing 15062020.pdf | 7 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 04 RERA Arc certificate CD wing 10092020.pdf | 7 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 RERA Arc certificate CD wing 30112020.pdf | 7 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 RERA Arc certificate CD wing 30112020.pdf | 7 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 06 RERA Arc certificate CD wing 15022021.pdf | 7 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 07 RERA Arc certificate CD wing 10052021.pdf | 7 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tattva Ph2 201019 Compressed.pdf | 7 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 03 Wing C D 15062020.pdf | 7 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 Wing C D 10092020.pdf | 7 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 05 Tattva Eng PH2 Wing CD 30112020.pdf | 7 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 06 Wing C D 15022021 (1) Compressed.pdf | 7 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07 Wing C D 10052021 (1) Compressed.pdf | 7 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 01 Tattva Eng PH2 Wing CD 15012020.pdf | 1 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 Tattva PH2 Wing CD 10042020.pdf | 1 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5 Raj Tattva Ph2 2019 YR KAMPL.pdf | 27 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva CD Wings ARC.pdf | 30 Sep 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE RAJ TATTVA PHASE 2 WING CD 30042019.pdf | 15 Jun 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE RAJ TATTVA PHASE 2 WING CD 05022019.pdf | 30 May 2019 |
| Certificates of CA (Form 3)File: RAJ TATTVA PHASE 2 WING C D 200818.pdf | 28 May 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE RAJ TATTVA PHASE II WING CD 15112018.pdf | 28 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva wing C D RERA 30042019.pdf | 9 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tattva Sale CD 30042019 PH2.pdf | 9 May 2019 |
| Certificates of CA (Form 5)File: CA CERTIFICATE RAJ TATTVA PHASE 2 WING CD 200818.pdf | 8 Mar 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva CD ARC 050219.pdf | 20 Feb 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tattva Sale CD 05022019.pdf | 20 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tattva CD PH 2 310518.pdf | 17 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raj Tattva CD wings PH2 AR 200818.pdf | 17 Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 110 filed documents as one ZIP, foldered, with a manifest
Keep Raj Tattva Phase II Wing C and D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kapurbawadi7,600+ in Thane
Filed coordinates, straight-line distance. 387 registered projects within 2 km.
ASHAR PULSE
Ms ASHAR VENTURES
SHETH ZURI
Sheth Developers Private Limited
Jagdale Edge
JAGDALE INFRASTRUCTURE PVT. LTD.
Bliss
Kapstone Constructions Private Limited
RUSTOMJEE LA VIE Wing D
Kapstone Constructions Private Limited
Thane Project
LODHA DEVELOPERS LIMITED
See every Thane project, with the district possession charts
Builder: KOTHARI AUTOPARTS MANUFACTURERS PVT LTD
KOTHARI AUTOPARTS MANUFACTURERS PVT LTD has 2 registrations on MahaRERA, including RAJ TATTVA PHASE 1 COMMERCIAL and Raj Tattva Phase II Wing C and D. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Raj Tattva Phase II Wing C and D is delayed beyond 31 Dec 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Raj Tattva Phase II Wing C and D?
The registered promoter entity is KOTHARI AUTOPARTS MANUFACTURERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Raj Tattva Phase II Wing C and D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Raj Tattva Phase II Wing C and D?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Raj Tattva Phase II Wing C and D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Raj Tattva Phase II Wing C and D?
The professionals named in the filing: Architect: Anil Jagwani; Engineer: H M Raje Structural Consultant Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Raj Tattva Phase II Wing C and D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.