Home / Browse projects / Thane, Maharashtra / Raj Silverstone

Completed No litigation declared Residential / Group Housing project

Raj Silverstone

By SKYSPACE BUILTEK

RG-MH-28798 · RERA P51700029081 · Last updated on MahaRERA portal: 19 Feb 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
12 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

Raj Silverstone is a Residential / Group Housing project by SKYSPACE BUILTEK in Thane, Maharashtra, registered with MahaRERA as P51700029081 on 26 Apr 2021. The registration is recorded completed; possession was promised by 31 Dec 2022.

At a glance

Project

  • NameRaj Silverstone
  • TypeResidential / Group Housing
  • Location
    • BELAVALI ROAD
    • DATTA CHOWK
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700029081
  • ReraGenie IDRG-MH-28798

Builder

  • NameSKYSPACE BUILTEK
  • Entity typePartnership
  • PartnersNAVEEN RAMESH BANSAL, NISHA CHANDRAKANT DHANAVADE, NACHIKET CHANDRAKANT DHANAVADE, KASHINATH MEENAKSHA NAIK, SUREKHA MALLESH CHALWADI
  • Other registrations1 more →
  • Completed1 of 2
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2021PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Apr 2021
  • Promised completion31 Dec 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA80000
B-WINGNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A WING55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B-WING55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered2
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
A WING156
B-WING156

Land and ownership27

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,150 sq m
Land owned byThe promoter, with other names on the file
Named landowners27
LandownerVillageDistrict
Chandrashekhar Manohar MhaskarBadlapur (M Cl)Thane
Shiv CorporationMumbai CityMumbai City
Santosh Anant BhoirDOMBIVLIThane
Ajit Anant BhoirDOMBIVLIThane
Amit Anant BhoirDOMBIVLIThane
Dhanwanti Praveen SubhedarDOMBIVLIThane
Hemchandra Govind NarkhadeDOMBIVLIThane
Sunita Niranjan BhagundeAndheriMumbai Suburban
Keshav Janardan BhoirDOMBIVLIThane
Kalpana Keshav BhoirDOMBIVLIThane
Anil Janardan BhoirDOMBIVLIThane
Niranjan Sonappa BhagundeAndheriMumbai Suburban
Sujata Kashinath BhagundeGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Sadanand Digamber LonkarPune (CB)Pune
Anil Bhagwan ManeBHILAWADISangli
Pandurang Shamrao JagtapDOMBIVLIThane
Ashok Shamrao JagtapDOMBIVLIThane
Ramesh Shankar ShindeDOMBIVLIThane
Suresh Chandrakant PotnisKalyanThane
Vishwanath Purushottam PradhanThane (M Corp.)Thane
HemlataKrushnakant LadThane (M Corp.)Thane
Suresh Dattatary KhakkayPune (M Corp.)Pune
PREMNARAYAN SHUKLAKalyanThane
Prashant Subhas TeliBadlapur (M Cl)Thane
Manohar Anant ThokeBadlapur (M Cl)Thane
Revathi Prashant TeliBadlapur (M Cl)Thane
Yogesh Kamlakar KulkarniBadlapur (M Cl)Thane

Approvals and building plan

Permissible FSI3423.13
Proposed, not sanctioned3,423 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPANVELKAR PALAZA, STATION ROAD, AMBERNATH EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNISHANT ZUNJARRAO
EngineerATUL KURTADKAR
Chartered AccountantRAKESH KALWANI
PartnerRole in project
SKYSPACE BUILTEK-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700012844Dec 2022 → Jun 2023

Reason as filed by the promoterAs you are aware, the current Covid-19 situation. Due to the Lockdown work that is blocked, we are not able to give possession at 31/12/2022. That’s why we ask to you kindly extend our project until 30/06/2023. So, kindly regenerate RERA certificate till 30th June 2023.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Oct 2023

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: From 4 Raj Silverstone Phase-1 .pdf19 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: From 5 Raj Silverstone Phase-1 FY 2022-23.pdf21 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Raj Silverstone Phase-1 03052023.pdf4 Oct 2023
Details of encumbrancesFile: Encumbrance.pdf27 Dec 2022
Other - FinanceFile: Encumbrance.pdf27 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30112022.pdf7 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30112022.pdf7 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5-Signed SKYSPACE_11zon.pdf21 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Jun-22.pdf21 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun-22_compressed.pdf21 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold 20062022.pdf21 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200240145583_For_Asset_Based_Search_20_06_2022_14_01_25_826.pdf21 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun-22_11zon.pdf21 Jun 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2A.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2A.pdf29 Nov 2021
CERSAI detailsFile: RPM_MCHI_517000_OTH_514.pdf29 Nov 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf29 Nov 2021
Declaration about Commencement CertificateFile: CC Declaration.pdf23 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 30062021.pdf23 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold 30062021.pdf23 Oct 2021
Copy of the legal title reportFile: Title Report of Skyspace New_compressed.pdf22 Apr 2021
Copy of the legal title reportFile: Search Report Skyspace Builtek New_compressed.pdf22 Apr 2021
Declaration in FORM BFile: Form B Ajit Bhoir_compressed.pdf14 Apr 2021
Declaration in FORM BFile: Form B Amit Bhoir_compressed.pdf14 Apr 2021
Declaration in FORM BFile: Form B Dhanvanti Subhedar_compressed.pdf14 Apr 2021
Declaration in FORM BFile: Form B Santosh Bhoir_compressed.pdf14 Apr 2021
Declaration in FORM BFile: Form B Anil Mane_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Bipin Potnis_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Deepak Ashok Jagtap_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Hemchandra Narkhade_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Niranajan Bhagunde_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Pandurang Jagtap_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Ramesh Shinde_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Sunita Bhagunde_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Sushama Lonkar_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Vishwanath Pradhan_compressed.pdf12 Apr 2021
Declaration in FORM BFile: From B Sujata Bhagunde_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Hemlata Lad_compressed.pdf12 Apr 2021
Declaration in FORM BFile: Form B Swapnil Suresh Khadake_compressed.pdf12 Apr 2021
Proforma of Allotment letterFile: allotment letter.pdf12 Apr 2021
Proforma of Allotment letterFile: format-agreement for sale-sky space buildtech.pdf6 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: CC Dt 10032021 Skyspace Builtek Appendix D 1_compressed.pdf27 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Skyspace Dt 22032021.pdf27 Mar 2021
Layout approvalFile: Approved Plan 1-2 Dt 10032021 SPB compressed.pdf23 Mar 2021
Layout approvalFile: Approved Plan 2-2 Dt 10032021 SPB_compressed.pdf23 Mar 2021
Building plan approvalFile: CC Dt 10032021 Skyspace Builtek Appendix D 1_compressed.pdf23 Mar 2021
Copy of Layout Approval (in case of layout)File: Approved Plan 1-2 Dt 10032021 SPB compressed.pdf23 Mar 2021
Copy of Layout Approval (in case of layout)File: Approved Plan 2-2 Dt 10032021 SPB_compressed.pdf23 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: CC Dt 10032021 Skyspace Builtek Appendix D 1_compressed.pdf23 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Skyspace Dt 22032021.pdf23 Mar 2021
PAN CardFile: Pan Card of skyspace builtek.pdf11 Nov 2020
Details of encumbrancesFile: NON ENCUMBRANCE LETTER WITH STAMP_compressed.pdf11 Nov 2020
Declaration in FORM BFile: Form B of Chandrashekhar Mhaskar_compressed.pdf11 Nov 2020
Declaration in FORM BFile: Form B of Tulsi R PAtel_compressed.pdf11 Nov 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Raj Silverstone on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DATTA CHOWK7,600+ in Thane

Builder: SKYSPACE BUILTEK

SKYSPACE BUILTEK has 2 registrations on MahaRERA, including Raj Silverstone and RAJ SILVERSTONE PHASE-2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Raj Silverstone is delayed beyond 31 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Raj Silverstone?

The registered promoter entity is SKYSPACE BUILTEK, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Raj Silverstone?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Raj Silverstone?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Raj Silverstone?

The professionals named in the filing: Architect: NISHANT ZUNJARRAO; Engineer: ATUL KURTADKAR; Chartered Accountant: RAKESH KALWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Raj Silverstone?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Raj Silverstone. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Raj Silverstone to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.