Completed No litigation declared Others project

RAJ CREST

By JAYBHAVE BUILDERS

RG-MH-65371 · RERA P51600022906 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
23 of 144Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

RAJ CREST is a Others project by JAYBHAVE BUILDERS in Nashik, Maharashtra, registered with MahaRERA as P51600022906 on 1 Nov 2019. The registration is recorded completed; possession was promised by 29 Dec 2025. The completion date has moved by 12 months from the original filing. 121 of the 144 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameRAJ CREST
  • TypeOthers
  • Location
    • KRUSHNAI NAGAR
    • 7 HEAVEN HOTEL
    • NEAR HOTEL JUPITER
    • RANE NAGAR
    • Nashik
    • 422009
  • Pincode422009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600022906
  • ReraGenie IDRG-MH-65371

Builder

  • NameJAYBHAVE BUILDERS
  • Entity typePartnership
  • PartnersSINDHU RAJENDRA JAYBHAVE, RAJENDRA TUKARAM JAYBHAVE
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2019First promiseDec 2024Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Nov 2019
  • Promised completion29 Dec 2025
  • Revised completionRevised to 29 Dec 2025 (originally 30 Dec 2024)
  • Buildings2 building records
  • Documents filed122 files

Current status

84%121 of 144 units booked
97.1%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAJ CREST BUILDING 1 WING A AND BNA19131300130
RAJ CREST BUILDING NO 2 WING CNA11714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

RAJ CREST BUILDING 1 WING A AND B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RAJ CREST BUILDING NO 2 WING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered106
Open Space38
BuildingClosed/CoveredOpen SpaceTotal
RAJ CREST BUILDING 1 WING A AND B10030130
RAJ CREST BUILDING NO 2 WING C6814

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,118 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Oct 2025

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI7791.07
Proposed, not sanctioned7,791 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR E-1 BHADRAPAD ASHWIN NAGAR NEAR SHAMBHAJI STADIUM, NEW CIDCO NASHIK-422009
Estimated costRs 13.89 cr
Cost incurredRs 13.49 cr
Work done97.12%
BuildingWingEstimatedIncurred
RAJ CREST BUILDING 1 WING A AND BNARs 10.14 crRs 10.14 cr
RAJ CREST BUILDING NO 2 WING CNARs 2.25 crRs 2.25 cr
-NARs 1.50 crRs 1.10 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHESH JANGID Jangid
EngineerMILIND RATHI Rathi
EngineerRavindra Shinde
Chartered AccountantCA PARESH SABADRA
Chartered AccountantPratik D Jain
PartnerRole in project
JAYBHAVE BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600027457Dec 2024 → Dec 2025

Reason as filed by the promotera) There are two Buildings in a project i.e., Building No 1-Wing A and Wing B, Building No 2-Wing C. We have already completed the construction for the said Buildings in accordance with the terms and conditions of commencement certificate and have already applied for completion certificate to Nashik Municipal Corporation dated 16th October, 2024 & waiting for completion certificate. b) We are targeting to obtain the occupancy certificate from the local authority by 29.12.2025.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - March 26 .pdf17 Apr 2026
Form 2A (FY 2019-2020)File: Form 2A - March 20 .pdf17 Apr 2026
Form 2A (FY 2020-2021)File: Form 2A - March 21 .pdf17 Apr 2026
Form 2A (FY 2021-2022)File: Form 2A - March 22 .pdf17 Apr 2026
Form 2A (FY 2022-2023)File: Form 2A - March 23 .pdf17 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A - March 24 .pdf17 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A - March 25 .pdf15 Apr 2026
Form 5 (FY 2024-2025)File: Signed RERA audit report 24-25.pdf12 Dec 2025
Form 1File: Architect Certificate-Dec-24.pdf8 Dec 2025
Form 2File: ER Dec.pdf8 Dec 2025
Form 3File: CA Certificate-Dec-24.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Dec 24.pdf8 Dec 2025
Form 1File: Architect Certificate-Sept-24.pdf8 Dec 2025
Form 2File: ER Sept.pdf8 Dec 2025
Form 3File: CA Certificate-Sept-24.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sept 24.pdf8 Dec 2025
Form 1File: Architect Certificate-Jun-24.pdf8 Dec 2025
Form 2File: ER June.pdf8 Dec 2025
Form 3File: CA Certificate-June-24.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: June 24.pdf8 Dec 2025
Form 5 (FY 2023-2024)File: Form 5.pdf8 Dec 2025
Form 1File: AR - March 25.pdf12 Nov 2025
Form 2File: ER - March 25.pdf12 Nov 2025
Form 3File: CA - March 25 final.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - March 25.pdf12 Nov 2025
Withdrawal Update Form 1File: AR - May 25.pdf12 Nov 2025
Withdrawal Update Form 1File: AR - May 25.pdf12 Nov 2025
Withdrawal Update Form 2File: ER -May 25.pdf12 Nov 2025
Withdrawal Update Form 2File: ER -May 25.pdf12 Nov 2025
Withdrawal Update Form 3File: CA - May 25 final.pdf12 Nov 2025
Withdrawal Update Form 3File: CA - May 25 final.pdf12 Nov 2025
Occupational CertificateFile: RAJ CREST COMPLETION CERTIFICATE .pdf12 Nov 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf19 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure-Rajendra Jaybhave.pdf19 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure-Sindhu Jaybhave.pdf19 Feb 2025
Declaration in FORM BFile: FORM B.pdf7 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Plinth Completion Certificate.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: June 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Sept 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Dec 24.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A .pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 23.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Jun-24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Sept-24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Dec-24.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: edited_CA Certificate-June-24_compressed.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: edited_CA Certificate-Sept-24_compressed.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: edited_CA Certificate-Dec-24_compressed.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Dec.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Sept.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER June.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Audit report from client (1).pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 AR Mar 24 Final signed copy.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate Final Signed Copy.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 ER march 24 Final Signed Copy.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 AR Mar 24 Final signed copy.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate Final Signed Copy.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 ER march 24 Final Signed Copy.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 AR Jun 23.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 AR Sep 23.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 AR Dec 23.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer Certificate_June 23.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer Certificate_ Sept 23.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer Certificate_ Dec 23.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer Certificate_ Dec 23.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA JUNE 23.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 CA SEP 23.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 CA DEC 23.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf22 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf22 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit Report-Sign Copy.pdf11 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report-Sign Copy.pdf11 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: jaybhave builders_Signed .pdf9 Dec 2022
Layout approvalFile: Plan 01.pdf14 Sep 2022
Layout approvalFile: Plan 02.pdf14 Sep 2022
Layout approvalFile: Plan 03.pdf14 Sep 2022
Layout approvalFile: Plan 04.pdf14 Sep 2022
Building plan approvalFile: Plan 01.pdf14 Sep 2022
Building plan approvalFile: Plan 02.pdf14 Sep 2022
Building plan approvalFile: Plan 03.pdf14 Sep 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
RAJ TOWERP51600011857RANE NAGAR, NashikAug 2017CompletedDec 2019Registered original: Dec 2018Mar 2019

How this compares with Nashik

84%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 12 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAJ CREST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR HOTEL JUPITER, RANE NAGAR4,100+ in Nashik

2 kmRAJ CRESTCompleted 110Lapsed / revoked 25Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: JAYBHAVE BUILDERS

JAYBHAVE BUILDERS has 2 registrations on MahaRERA, including RAJ TOWER and RAJ CREST. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if RAJ CREST is delayed beyond 29 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJ CREST?

The registered promoter entity is JAYBHAVE BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJ CREST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAJ CREST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAJ CREST?

The professionals named in the filing: Architect: MAHESH JANGID Jangid; Engineer: MILIND RATHI Rathi; Engineer: Ravindra Shinde; Chartered Accountant: CA PARESH SABADRA; Chartered Accountant: Pratik D Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAJ CREST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJ CREST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJ CREST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.