ReraGenieLog inGet a buyer report

Home / Browse projects / RAI s VRUNDAVAN

Completed No litigation declared Others project

RAI s VRUNDAVAN

By RAI RESIDENCY Private Limited

RG-MH-63210 · RERA P51700017255 · Last updated on MahaRERA portal: 25 Mar 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 17 other registrations.

See what the report covers Free either way: .
Dec 2023Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Slabs of Super Structure, 8%
0Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

RAI s VRUNDAVAN is a Others project by RAI RESIDENCY Private Limited in TISGAON, 421306, registered with MahaRERA as P51700017255 on 24 Jul 2018. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameRAI s VRUNDAVAN
  • TypeOthers
  • Location
    • KALYAN E
    • TISGAON
    • 421306
  • Pincode421306
  • RERA no.P51700017255
  • ReraGenie IDRG-MH-63210

Builder

  • NameRAI RESIDENCY Private Limited
  • Entity typeCompany
  • CINU55100MH2000PTC124416
  • GSTIN27AABCR7454F1ZA
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorSAROJ MANOJ RAI
  • Other registrations17 more →
  • Completed10 of 18
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jul 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAI s VRVNDAVANNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Mar 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 8%.

RAI s VRVNDAVAN: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Mar 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,485 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SIKANDER EKNATH GAIKWADTisgaonThane

Approvals and building plan

Permissible FSI1468.0
Proposed, not sanctioned1,468 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHUCHAK CHAMBERS, KALYAN W

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDILIP TAMBDAY ASSOCIATES
EngineerKHASNIS AND ASSOCIATES
PartnerRole in project
RAI RESIDENCY Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Feb 2020

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RAIS VRUNDAVAN.pdf25 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Rai Vrundavan.pdf20 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rai Vrundavan Engineers Certificate.pdf20 Feb 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate R Vrud.pdf20 Feb 2020
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate Rai Vrundavan (After Completion).pdf20 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: RAIS VRUNDAYAN 31 MAR 2019.pdf15 Jan 2020
Layout approvalFile: 02 Revised Plan Copy 7 Floor_compressed.pdf25 Jun 2019
Copy of Layout Approval (in case of layout)File: 02 Revised Plan Copy 7 Floor_compressed.pdf25 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: RAI RUNDAVAN.pdf25 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 Arch Cert R VUD_compressed.pdf25 Jun 2019
Layout approvalFile: PLAN VR.pdf18 Jul 2018
Copy of Layout Approval (in case of layout)File: PLAN VR.pdf18 Jul 2018
Certificates of CA (Form 3)File: RAI vrundavan.pdf18 Jul 2018
Layout approvalFile: PLAN.pdf11 Jul 2018
Copy of Layout Approval (in case of layout)File: PLAN.pdf11 Jul 2018
Building plan approvalFile: COMMENCEMENT.pdf10 Jul 2018
Copy of the legal title reportFile: TITLE.pdf10 Jul 2018
Details of encumbrancesFile: ENCUM.pdf10 Jul 2018
Building Plan Approval (IOD)File: COMMENCEMENT.pdf10 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT.pdf10 Jul 2018
Declaration in FORM BFile: vrundavan B .pdf10 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 VRUNDAVAN.pdf10 Jul 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf10 Jul 2018
Proforma of Allotment letterFile: Agreement for sale-Rais Vrindavan.pdf10 Jul 2018

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PHE IIAdharsh Nagar Tisgoan Kalyan east88CompletedSep 2014Sep 2014
PHE IAdharsh Nagar Tisgoan Kalyan128CompletedMay 2014May 2014
SEAdaresh Nagar Tisgaon Kalyan East81CompletedApr 2014Apr 2014
BALIRAM ENCLAVEAdarsh Nagar Near Gaudevi Mandir Tisgoan Kalyan East101CompletedApr 2014Apr 2014
GOVINDADHARSH NAGAR TISGOAN81CompletedMay 2013May 2013

Keep RAI s VRUNDAVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TISGAON

Builder: RAI RESIDENCY Private Limited

RAI RESIDENCY Private Limited has 18 registrations on MahaRERA, including YASHWANT HEIGHTS C Wing and RAI S HERITAGE D Wing. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if RAI s VRUNDAVAN is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAI s VRUNDAVAN?

The registered promoter entity is RAI RESIDENCY Private Limited, a company as per the filing. Its CIN U55100MH2000PTC124416 and GSTIN 27AABCR7454F1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAI s VRUNDAVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAI s VRUNDAVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAI s VRUNDAVAN?

The professionals named in the filing: Architect: DILIP TAMBDAY ASSOCIATES; Engineer: KHASNIS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAI s VRUNDAVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAI s VRUNDAVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAI s VRUNDAVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.