Home / Browse projects / Pune, Maharashtra / Rahul Aston - I

Completed No litigation declared Residential / Group Housing project

Rahul Aston - I

By Rahul Construction

RG-MH-16784 · RERA P52100026878 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA
  • Completion date moved by 1 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2025Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 95%
5Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Rahul Aston - I is a Residential / Group Housing project by Rahul Construction in Pune, Maharashtra, registered with MahaRERA as P52100026878 on 3 Nov 2020. The registration is recorded completed; possession was promised by 30 Apr 2025. The completion date has moved by 1 months from the original filing. 5 complaints are on record with the regulator.

At a glance

Project

  • NameRahul Aston - I
  • TypeResidential / Group Housing
  • Location
    • Main Hinjevadi Road
    • Hinjewadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100026878
  • ReraGenie IDRG-MH-16784

Builder

  • NameRahul Construction
  • Entity typePartnership
  • GSTIN27AAPFR1488N1ZB
  • PartnerMr Siddharth Raichand Kunkulol
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredNov 2020First promiseMar 2025Revised toApr 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Nov 2020
  • Promised completion30 Apr 2025
  • Revised completionRevised to 30 Apr 2025 (originally 15 Mar 2025)
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A2 - Wing A and Wing BNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Building A2 - Wing A and Wing B: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Open Space56

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,750 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI15402.66
Proposed, not sanctioned10,502 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFP No 195 CTS No 853, Signature Bhamburda, Shivaji Nagar, Bhandarkar Road Pune 411004

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Rahul Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027709Mar 2025 → Apr 2025

Reason as filed by the promoterNOTE : We have received the Occupancy Certificate by PMRDA for Rahul Aston - I (Bldg A2). We have uploaded Occupancy Certificate and Form 4 for your reference. Please accept this OC and issue the revised RERA Certificate till date of OC i.e. 30/04/2025 and open the Tab to upload Form 4. We have uploaded all QPR and we have submitted the form B on 500 Stamp Paper till completion Date till OC As per your scrutiny mail Dt. 12/05/2025 we have sent request mail for revised RERA certificate till date of OC on given mail id on 12/05/2025, , 13/05/2025 and on 04/06/2025 and 06/06/2025 from our registe

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC12501483Ankit RichhariyaRahul Construction02/05/2025
CC12504066BHarat DeshmukhRahul Construction18/11/2025
CC12504254Prasad SuryawanshiRahul Construction02/12/2025
SM12600067Ram GawaliRahul Construction22/01/2026
CC12600641Nikhil Prabhakar DeshmukhRahul Construction03/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 May 2025

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC.pdf15 May 2026
Occupational CertificateFile: Declaration on OC Rejection.pdf15 May 2026
Occupational CertificateFile: Revised RERA - Rahul Aston - I.pdf15 May 2026
Occupational CertificateFile: Lay out Plan-compressed.pdf15 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2 - 17-04-24.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Rahul Aston I.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aston I.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Aston I.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rahul Aston I.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aston I.pdf26 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 17-04-24.pdf26 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aston I.pdf26 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aston I.pdf26 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aston Phase I.pdf26 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aston I.pdf26 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aston I.pdf26 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory 17-4-24.pdf26 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory Aston I.pdf26 Jun 2025
Disclosure of sold/ booked inventoryFile: Aston I - Disclosure of sold unsold.pdf26 Jun 2025
Disclosure of sold/ booked inventoryFile: Aston I - Disclosure of sold.pdf26 Jun 2025
Disclosure of sold/ booked inventoryFile: Rahul Aston I.pdf26 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Aston I - Occupancy Certificate.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Phase I.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Phase I.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Rahul Aston I.pdf31 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rahul Aston I.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aston I.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aston I.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Aston I.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Aston I - Disclosure of sold.pdf6 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Rahul Aston I.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: Aston I - Disclosure of sold unsold.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aston I.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aston I.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aston I.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory Aston I.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aston I.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Rahul Aston I.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aston II.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A - FY 23-24.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 17-04-24.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory 17-4-24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 17-04-24.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aston I.pdf19 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Declaration.pdf28 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 2020.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 2021.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 9-22.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 12-22.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 3-2023.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 06- 2023.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf6 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3.pdf6 Mar 2024
PAN CardFile: PAN Card.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf27 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 19-20.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 20-21.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 21-22.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 22-23.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf27 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Detail.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 22.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - september 22.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Dec 22.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 March 23.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 23.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - September 23.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -December 23.pdf7 Feb 2024
Layout approvalFile: Building Layout.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Building Layout.pdf8 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rahul ASTON I From 5.pdf5 Dec 2023
Proforma of Agreement for saleFile: Agreement Draft.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 RERA.pdf8 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 22-23.pdf13 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- FY 22-23.pdf13 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf16 May 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 1 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rahul Aston - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi13,700+ in Pune

Builder: Rahul Construction

Rahul Construction has 2 registrations on MahaRERA, including Rahul Aston - I and Rahul Aston - II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Rahul Aston - I is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rahul Aston - I?

The registered promoter entity is Rahul Construction, a partnership as per the filing. Its GSTIN 27AAPFR1488N1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rahul Aston - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Rahul Aston - I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Rahul Aston - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Rahul Aston - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rahul Aston - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rahul Aston - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.