Raheja Imperia II
By Raheja Universal (Pvt.) Ltd.
RG-MH-62963 · RERA P51900032251 · Last updated on MahaRERA portal: 24 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Raheja Imperia II is a Residential / Group Housing project by Raheja Universal (Pvt.) Ltd. in Lower Parel, 400013, registered with MahaRERA as P51900032251 on 17 Dec 2021. Possession is promised by 31 Dec 2029. 1 of the 1 unit on this registration is recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameRaheja Imperia II
- TypeResidential / Group Housing
- Location
- Shankar Rao Naram Path
- Lower Parel
- 400013
- Pincode400013
- RERA no.P51900032251
- ReraGenie IDRG-MH-62963
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Dec 2021
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed127 files
Current status
Figures as on 24 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Raheja Imperia-II | NA | 77 | 49 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 62%.
Raheja Imperia-II: 20% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 62% |
| Podiums (if any) | 0% |
| Plinth | 62% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 40% |
| Open Parking | No | Not applicable |
Parking filed600
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Prakash Cotton Mills Pvt Ltd | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JP Parekh & Son |
| Architect | Kamal Khemani |
| Engineer | Mahesh Lalla |
| Chartered Accountant | Dinesh Jain |
| Chartered Accountant | Vinit & Associates |
| Chartered Accountant | K. N. Gandhi & Co. |
| Partner | Role in project |
|---|---|
| Raheja Universal (Pvt.) Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Nov 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed127
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Imp II Jun 2025.pdf | 24 Jun 2026 |
| Form 2File: Form 2_Imperia II Jun 2025.pdf | 24 Jun 2026 |
| Form 3File: Form 3_ Imperia II_ June 2025.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - June 2025.pdf | 24 Jun 2026 |
| Form 1File: Form 1 Imp II Sep 2025.pdf | 24 Jun 2026 |
| Form 2File: Form 2_Imperia II_Sep 2025.pdf | 24 Jun 2026 |
| Form 3File: Form 3 _Imperia II_ Sep 2025.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Sep 2025.pdf | 24 Jun 2026 |
| Form 1File: Form 1 Imperia II Dec 2025.pdf | 24 Jun 2026 |
| Form 2File: Form 2_Imperia 2_Dec 2025.pdf | 24 Jun 2026 |
| Form 3File: Form 3 Imperia II Dec 2025.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Dec 2025.pdf | 24 Jun 2026 |
| Form 1File: Form 1 - Imperia II.pdf | 24 Jun 2026 |
| Form 2File: Form 2_imperia 2 _Mar 2026.pdf | 24 Jun 2026 |
| Form 3File: Form 3 Imperia II 31032026.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Mar 2026.pdf | 24 Jun 2026 |
| Form 2A (FY 2025-2026)File: Imperia - II.pdf | 11 Jun 2026 |
| Other - FinanceFile: Declaration stating reason for transfer of bank account .pdf | 17 Jun 2025 |
| Building plan approvalFile: Imperia - II Amended IOD .pdf | 17 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Imp-II CC (170425) .pdf | 17 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Imperia - II Amended IOD .pdf | 17 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Imp II CC .pdf | 10 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Imp II (23-24).pdf | 18 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Imperia II (23-24).pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold inventory details (311224).pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Imp 2 311224.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Imp II 3112224.pdf | 6 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Imp-II Declaration about all RERA Designated Bank Accounts (Format A) .pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Imp II 311224.pdf | 23 Jan 2025 |
| Building plan approvalFile: Pg 1-2.pdf | 31 Dec 2024 |
| Building plan approvalFile: Pg 3-4.pdf | 31 Dec 2024 |
| Building plan approvalFile: Pg 5-6.pdf | 31 Dec 2024 |
| Building plan approvalFile: Pg 7-8.pdf | 31 Dec 2024 |
| Building plan approvalFile: Pg 9-10.pdf | 31 Dec 2024 |
| Building plan approvalFile: Pg 11-12.pdf | 31 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Pg 1-2.pdf | 31 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Pg 3-4.pdf | 31 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Pg 5-6.pdf | 31 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Pg 7-8.pdf | 31 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Pg 9-10.pdf | 31 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Pg 11-12.pdf | 31 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Imp II 300624.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Imp II 300924.pdf | 9 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Imp II 300924.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Imperia II 31032024.pdf | 15 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Imperia ll 30062024.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Imperia II 310324.pdf | 27 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Imp - II Inventory Disclosure 3132024.pdf | 3 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Imp II 30032024.pdf | 29 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Imperia II (22-23).pdf | 9 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Imp II Sold unsold inventory disclosure 311223.pdf | 29 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Imp II 301223.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Imp II 311223.PDF | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Imp II 311223.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Imperia II Form 1 300923.pdf | 12 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Imp 2 Form 2 300923.pdf | 12 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Imp II 300923.pdf | 12 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Imp II CC upto Top of 2nd Basement.pdf | 15 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Imp II 300623.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Imp II 300623.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Imp II 310323.pdf | 25 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Imp 2 310323.pdf | 25 Apr 2023 |
| Building plan approvalFile: Imp-II Amendment IOD Drawing (010323).pdf | 10 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Imp-II Amendment IOD Drawing (010323).pdf | 10 Mar 2023 |
| OtherFile: Imp-II Concessions Plans (170223).pdf | 10 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Imp II 300622.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Imp II 311222.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Imp II 300622.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 Imp II 311222.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 Imp II 300922.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Imperia II 300322.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Imperia II 300622.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 imperia II 300922.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Imperia II 311222.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Imperial II RUPL.pdf | 26 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Imp II _inventory details.pdf | 22 Dec 2022 |
| Building plan approvalFile: IOD.pdf | 30 Aug 2022 |
| Building plan approvalFile: 1.pdf | 30 Aug 2022 |
| Building plan approvalFile: 2.pdf | 30 Aug 2022 |
| Building plan approvalFile: 3.pdf | 30 Aug 2022 |
Promoter's earlier projects13
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Raheja Lunaris-2PR1331012501769 | MIDC Industrial Area, Thane | 760 | Dec 2025 | Ongoing | Dec 2031 | Not due yet |
| Tesla Building No 1 - Formerly known as EDISON | Juinagar - Navi Mumbai | 259 | - | Completed | Apr 2018 | Apr 2018 |
| Raheja Exotica - Sorento 5B | Madh Island - Malad West | 165 | - | Completed | Oct 2017 | Apr 2017 |
| Raheja Exotica - Sorento 5A | Madh Island - Malad West | 211 | - | Completed | Oct 2017 | Apr 2017 |
| Raheja Ridgewood | Goregaon East - Mumbai | 278 | - | Completed | Mar 2017 | Late, Apr 2017 |
| Raheja Reflections - Odyssey | Kandivali East Mumbai | 62 | - | Completed | Jan 2017 | Late, Apr 2017 |
| Raheja Reflections - Eternity | Kandivali East Mumbai | 229 | - | Completed | Mar 2016 | Mar 2016 |
| Raheja Waterfront - Pacific | Kulai - Mangalore | 292 | - | Completed | Dec 2014 | Late, Apr 2017 |
| Raheja Waterfront - Atlantic | Kulai Manglore | 228 | - | Completed | Dec 2014 | Late, Mar 2016 |
| Raheja Reflections - Serenity | Kandivali East | 256 | - | Completed | May 2014 | Late, Oct 2014 |
| Raheja Xion | Byculla - Mumbai | 12 | - | Completed | Apr 2013 | Apr 2013 |
| Raheja Exotica - Amalfi Sicily and Capri - Phase - III | Madh Island - Malad West | 311 | - | Completed | Apr 2013 | Late, Jun 2014 |
| Raheja Reflection Plaza | Kandivali East | 1 | - | Completed | Feb 2012 | Feb 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 16 other registrations, which the RERA portal never shows together
- All 127 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Raheja Imperia II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Lower Parel
Lodha Adrina
LODHA DEVELOPERS LIMITED
7 Mahalaxmi - Tower 3
Runwal Real Estates Private Limited
7 Mahalaxmi - Tower 1
Runwal Real Estates Private Limited
RUNWAL RAAYA - TOWER 2
AETHON DEVELOPERS PRIVATE LIMITED
RUNWAL RAAYA - TOWER 1
AETHON DEVELOPERS PRIVATE LIMITED
PLUS ART
CHINTAMANI CONSTRUCTION COMPANY
Builder: Raheja Universal (Pvt.) Ltd.
Raheja Universal (Pvt.) Ltd. has 17 registrations on MahaRERA, including Raheja Imperia - I and Raheja Exotica Verona. Its filings disclose 13 earlier MahaRERA projects: declares 6 of 12 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if Raheja Imperia II is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Raheja Imperia II?
The registered promoter entity is Raheja Universal (Pvt.) Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Raheja Imperia II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Raheja Imperia II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Raheja Imperia II?
The professionals named in the filing: Architect: JP Parekh & Son; Architect: Kamal Khemani; Engineer: Mahesh Lalla; Chartered Accountant: Dinesh Jain; Chartered Accountant: Vinit & Associates; Chartered Accountant: K. N. Gandhi & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Raheja Imperia II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback