PLUS ART

By CHINTAMANI CONSTRUCTION COMPANY

RG-MH-09567 · RERA P51900003331 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 78 months
  • 2 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2028Possession promisedmoved 78 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 55%
43 of 107Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 156 documents Report an error

PLUS ART is a Others project by CHINTAMANI CONSTRUCTION COMPANY in Lower Parel, 400013, registered with MahaRERA as P51900003331 on 5 Aug 2017. Possession is promised by 30 Jun 2028. The completion date has moved by 78 months from the original filing. 64 of the 107 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePLUS ART
  • TypeOthers
  • Location
    • GIP Store Lane
    • Lower Parel
    • 400013
  • Pincode400013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900003331
  • ReraGenie IDRG-MH-09567

Builder

  • NameCHINTAMANI CONSTRUCTION COMPANY
  • Entity typePartnership
  • PartnerMANGALA SANKPAL

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2017
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 1 Dec 2021)
  • Buildings1 building record
  • Documents filed156 files

Current status

60%64 of 107 units booked
30.9%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PLUS ARTNA19191070107

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 55%.

PLUS ART: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed141

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots141
Closed/Covered141

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,545 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI14233.0
Proposed, not sanctioned7,046 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floorings Point, Plot No 8, Opp Mumbai University, Santacruz East, Mumbai - 400098
Estimated costRs 104.09 cr
Cost incurredRs 32.20 cr
Work done30.93%
BuildingWingEstimatedIncurred
PLUS ARTNARs 102.00 crRs 32.20 cr
-NARs 2.08 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSankpal Kulkarni & Associates
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
CHINTAMANI CONSTRUCTION COMPANY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900009017Dec 2021 → Dec 2025

Reason as filed by the promoterFirstly, we declare that we haven't entered into agreement for sale with any of the prospective buyer. The project have been delayed due to subsequent changes in the planning norms. Since now we do not intend to portray a wrong commitment to the buyers while advertisement, we request you to kindly extend the completion date of the project till 30th November 2024. We hereby confirm to complete the project on the revised deadline.

EA31032620482Dec 2021 → Jun 2028

Reason as filed by the promoterThe delay in completion of the project and submission of the present application has arisen on account of including procurement constraints, financial limitations, and site-related challenges. Despite these impediments, the promoter is taking all necessary and proactive measures to mitigate the issues and is committed to expediting the remaining work to ensure completion at the earliest possible time.

Litigation declared4

CaseCourtStatus
411/2017COURT OF SMALL CAUSES MUMBAIPENDING
730/2017COURT OF SMALL CAUSES MUMBAIPENDING
569/2018CITY CIVIL COURT MUMBAIPending
730/2017Court of Small causes, MumbaiClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000210193Mrs. Banoo Phiroze DordiChintamani Construction Company12/03/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Feb 2024

Documents filed156

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 156 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Plus Art as on june 2026.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2 Plus Art as on june 2026.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3 Plus Art as on june 2026.pdf10 Aug 2026
Withdrawal Update Form 1File: Form 1 Plus Art as on june 2026.pdf23 Jul 2026
Withdrawal Update Form 2File: Form 2 Plus Art as on june 2026.pdf23 Jul 2026
Withdrawal Update Form 3File: Form 3 Plus Art as on june 2026.pdf23 Jul 2026
Withdrawal Update Form 1File: Form 1-Plus ART-Architect Certificate-31st March 2026.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1-Plus ART-Architect Certificate-31st March 2026.pdf28 Apr 2026
Withdrawal Update Form 2File: Certified Form 2 Plus Art as on 31-03-2026.pdf28 Apr 2026
Withdrawal Update Form 2File: Certified Form 2 Plus Art as on 31-03-2026.pdf28 Apr 2026
Withdrawal Update Form 3File: Certified Form 3 Plus Art as on 31-03-2026.pdf28 Apr 2026
Withdrawal Update Form 3File: New Form 3 Plus Art as on 31-03-2026.pdf28 Apr 2026
Form 5 (FY 2024-2025)File: Plus Art Form 5- FY 2024-25.pdf6 Mar 2026
Form 1File: Form 1 - Plus ART as on June 2024.pdf18 Feb 2026
Form 2File: Form-2-Plus ART signed-Engineers certificate.pdf18 Feb 2026
Form 3File: Form 3 Plus Art as on 30-06-2024.pdf18 Feb 2026
OthersFile: Revised further CC-Feb-2026.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Plus Art as on June 2025.pdf18 Feb 2026
Form 1File: Form 1-Architect Letter-Plus Art-till Sept 2024.pdf18 Feb 2026
Form 2File: Form 2 - Plus Art as on Sept 2024 (REVISED).pdf18 Feb 2026
Form 3File: Form 3 - Plus Art as on Sept 2024 (REVISED).pdf18 Feb 2026
OthersFile: IOD-2025_1.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Plus Art as on Sep 2025.pdf18 Feb 2026
Form 1File: Form 1 - Plus Art as on Dec 2025.pdf11 Feb 2026
Form 2File: Form 2 - Plus Art as on Dec 2025.pdf11 Feb 2026
Form 3File: Form 3 - Plus Art as on Dec 2025.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29- Plus ART-Till Dec-2025.pdf11 Feb 2026
Form 1File: Form 1 - Plus Art as on Sep 2025.pdf28 Nov 2025
Form 2File: Form 2 - Plus Art as on Sep 2025.pdf28 Nov 2025
Form 3File: Form 3 - Plus Art as on Sep 2025.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Circular-29-Plus ART-30-09-2025.pdf28 Nov 2025
Form 1File: Form 1 - Plus Art as on Sep 2025.pdf16 Oct 2025
Form 2File: Form 2 - Plus Art as on Sep 2025.pdf16 Oct 2025
Form 3File: Form 3 - Plus Art as on Sep 2025.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Plus Art as on Sep 2025.pdf16 Oct 2025
Form 1File: Form 1 - Plus Art as on June 2025.pdf8 Aug 2025
Form 2File: Form 2 - Plus Art as on June 2025.pdf8 Aug 2025
Form 3File: Form 3 - Plus Art as on June 2025.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Plus Art as on June 2025.pdf8 Aug 2025
Form 1File: Form 1 - Plus Art as on March 2025.pdf8 Aug 2025
Form 2File: Form 2 - Plus Art as on March 2025.pdf8 Aug 2025
Form 3File: Form 3 - Plus Art as on March 2025.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29-Plus Art as on March 2025.pdf8 Aug 2025
Certificates of CA (Form 3)File: Form 3-CA Certificate till March 2025-Plus ART.pdf15 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Plus Art as on Sept 2024 (REVISED).pdf15 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Plus Art as on Dec 2024.pdf15 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Plus Art as on March 2025.pdf15 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Plus Art as on March 2025.pdf8 Apr 2025
Certificates of CA (Form 3)File: Form 3 Plus Art as on 31-12-2024.pdf20 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Plus Art as on Dec 2024.pdf18 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Plus Art as on Sept 2024 (REVISED).pdf7 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Architect Letter-Plus Art-till Sept 2024.pdf15 Oct 2024
Certificates of CA (Form 3)File: Form 3 - Plus Art as on Sept 2024.pdf15 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Plus Art as on Sept 2024.pdf15 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Architect Letter-Plus Art-till Sept 2024.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Plus Art FY 2023-24 Compressed.pdf9 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2-Plus ART signed-Engineers certificate.pdf26 Jul 2024
Certificates of CA (Form 3)File: Form 3-Plus ART-CA certificate-signed.pdf26 Jul 2024
Certificates of CA (Form 3)File: Form 3 Plus Art as on 30-06-2024.pdf19 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Plus ART as on June 2024.pdf10 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Declaration-Plus ART.pdf1 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Plus ART-signed copy.pdf27 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Plus Art as on March 2024.pdf24 May 2024
Certificates of CA (Form 3)File: Form 3 - Plus Art as on March 2024.pdf6 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Plus Art-March 2024.pdf10 Apr 2024
Proforma of Agreement for saleFile: Draft Agreement-Plus ART-2024.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Circular 29-Plus ART-Dec-2023.pdf20 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC - Plus Art.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Plus Art as on Dec 2023.pdf18 Jan 2024
Certificates of CA (Form 3)File: New format- Form 3 Plus Art as on 31st December 2023.pdf18 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Plus ART as on Dec 2023.pdf9 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: New Format Form 5 Plus Art FY 2022-23.pdf28 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Plus Art as on September 2023.pdf2 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Plus Art as on Sep 2023.pdf11 Oct 2023
Certificates of CA (Form 3)File: Form 3- Plus Art as on September 2023.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Plus Art FY 2022-23.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: Plus ART-Circular 29-Aug 2023.pdf26 Aug 2023
Building plan approvalFile: Page 1-3.pdf6 Jul 2023
Building plan approvalFile: Page 4-5.pdf6 Jul 2023

Keep PLUS ART on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lower Parel

2 kmPLUS ARTCompleted 22Lapsed / revoked 12Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: CHINTAMANI CONSTRUCTION COMPANY

CHINTAMANI CONSTRUCTION COMPANY has 1 registration on MahaRERA, including PLUS ART. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if PLUS ART is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PLUS ART?

The registered promoter entity is CHINTAMANI CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PLUS ART?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PLUS ART?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PLUS ART?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PLUS ART?

The professionals named in the filing: Architect: Sankpal Kulkarni & Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PLUS ART?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PLUS ART. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PLUS ART to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.