Red flags
- Litigation declared, 3 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAHEJA ASCENCIO is a Residential / Group Housing project by K RAHEJA CORP REAL ESTATE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028506 on 8 Mar 2021. The registration is recorded completed; possession was promised by 30 May 2025.
At a glance
Project
- NameRAHEJA ASCENCIO
- TypeResidential / Group Housing
- Location
- RAHEJA VIHAR CIRCULAR ROAD
- POWAI
- Tungava
- Kurla
- Mumbai Suburban
- 400072
- Pincode400072
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800028506
- ReraGenie IDRG-MH-29430
Builder
- NameK RAHEJA CORP REAL ESTATE PRIVATE LIMITED
- Entity typeCompany
- CINU40300MH2007PTC287012
- GSTIN27AABCF1838M1ZF
- DirectorsSUNIL MADHAV HINGORANI, RAMESH RANGANATHAN, RAVI CHANDRU RAHEJA, NEEL CHANDRU RAHEJA
- Company SecretoryJIGNASHA CHETAN THAKKAR
- Other registrations20 more →
- Completed1 of 21
- No longer live8 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Mar 2021
- Promised completion30 May 2025
- Revised completionNone
- Buildings1 building record
- Documents filed126 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RAHEJA ASCENCIO - WING A AND WING B | NA | 21 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
RAHEJA ASCENCIO - WING A AND WING B:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed309
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| K RAHEJA CORP REAL ESTATE PRIVATE LIMITED | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 143/2013 | Suit | Ongoing |
| 563/2017 | Supreme Court of India | Ongoing |
| 143/2013 | Bombay High Court | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Oct 2024
Documents filed126
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Ascencio Q3 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Ascencio Q3 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Ascencio Q3 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 20 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: 4 Architect Certificate Raheja Ascencio 2024-12-19 KRCREPL UPLOAD.pdf | 17 Jan 2025 |
| Status of ConveyanceFile: Conveyance Self Declaration Raheja Ascencio 2025-01-17 UPLOAD.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2024-12-31 UPLOAD.pdf | 17 Jan 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: Raheja Ascencio - Status of Complaints Q3FY25 UPLOAD.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Ascencio Q2 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Ascencio Q2 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Ascencio Q2 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 18 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Raheja Ascencio 2024-10-10 Full OC Building and Clubhouse UPLOAD.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2024-09-30 UPLOAD.pdf | 17 Oct 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Raheja Ascencio - Status of Complaints Q2FY25 UPLOAD.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 5 Raheja Ascencio FY 2023-24 KRCREPL Report-Annexure1-Annexure2 UPLOAD.pdf | 17 Oct 2024 |
| Form 5 (FY 2023-2024)File: 5 Raheja Ascencio FY 2023-24 KRCREPL Report-Annexure1-Annexure2 UPLOAD.pdf | 29 Sep 2024 |
| Form 5 (FY 2020-2021)File: 5 Raheja Ascencio FY 2020-21 KRCPL UPLOAD.pdf | 25 Sep 2024 |
| Form 5 (FY 2021-2022)File: 5 Raheja Ascencio FY 2021-22 KRCPL Certificate UPLOAD.pdf | 25 Sep 2024 |
| Form 5 (FY 2022-2023)File: 5 Raheja Ascencio FY 2022-23 KRCPL Certificate UPLOAD.pdf | 25 Sep 2024 |
| Copy of the legal title reportFile: Title Supplemental Ascencio 2024-04-23 UPLOAD.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Ascencio Q1 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Ascencio Q1 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2024-06-30 UPLOAD.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Ascencio Q1 FY25 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Jul 2024 |
| Proforma of Agreement for saleFile: Ascencio AFS 2024-04-28 Final AFS post OC - clean UPLOAD.pdf | 17 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Raheja Ascencio - Status of Complaints Q1FY25 UPLOAD.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Engineer's Quality Assurance Certificate FY 23-24 Raheja Ascencio UPLOAD.pdf | 3 Jun 2024 |
| Details of encumbrancesFile: Encumbrance Finance-CERSAI Raheja Ascencio 2024-04-15 UPLOAD.pdf | 19 Apr 2024 |
| CERSAI detailsFile: Encumbrance Finance-CERSAI Raheja Ascencio 2024-04-15 UPLOAD.pdf | 19 Apr 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Raheja Ascencio Society Formation Declaraion and CHSL Reg Cert 2024-04-16 UPLOAD.pdf | 19 Apr 2024 |
| Status of ConveyanceFile: Conveyance Self Declaration Raheja Ascencio 2024-04-19 UPLOAD.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Ascencio Q4 FY24 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Ascencio Q4 FY24 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2024-03-31 UPLOAD.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Ascencio Q4 FY24 Self Declaration Form 1-2-3 UPLOAD.pdf | 17 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Raheja Ascencio - Greivance Redressal Cell with Complaints Status Q4 FY24 UPLOAD.pdf | 17 Apr 2024 |
| Declaration in FORM BFile: Form B - KRCREPL (New Intending Promoter) for Raheja Ascencio compressed UPLOAD.pdf | 28 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate Raheja Ascencio 2024-03-11 (Data Jan 2024) KRCREPL UPLOAD.pdf | 28 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer's Certificate Raheja Ascencio 2024-03-13 (Jan 2024) krcrepl UPLOAD.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate Raheja Ascencio 2024-03-27 (Data Jan 2024) krcrepl UPLOAD.pdf | 28 Mar 2024 |
| Other - LegalFile: NCLT Order dated 20Dec2023 Certified Copy on 04Jan2024 compressed UPLOAD.pdf | 28 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Raheja Ascencio 2024-03-18 Full OC UPLOAD.pdf | 26 Mar 2024 |
| Details of encumbrancesFile: Encumbrance Finance CERSAI Raheja Ascencio 2024-01-18 UPLOAD.pdf | 19 Jan 2024 |
| CERSAI detailsFile: CERSAI Asset Search Report Raheja Ascencio 2024-01-15 UPLOAD.pdf | 19 Jan 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Raheja Ascencio Society Formation Declaraion 2024-01-19 UPLOAD.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2023-12-31 UPLOAD.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate Raheja Ascencio 2023-10-16 (Data Sept 2023) UPLOAD.pdf | 7 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer's Certificate Raheja Ascencio 2023-10-17 (Sept 2023) UPLOAD.pdf | 7 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate Raheja Ascencio 2023-12-06 (Data Sept 2023) UPLOAD.pdf | 7 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2023-09-30 UPLOAD.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 5 Raheja Ascencio FY 2022-23 KRCPL Certificate UPLOAD.pdf | 25 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2387795_FurtherCC_signed 2023-07-27 UPLOAD.pdf | 11 Aug 2023 |
| Declaration about Commencement CertificateFile: Raheja Ascencio Declaration of CC 2023-08-10 UPLOAD.pdf | 11 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate Raheja Ascencio 2023-04-18 (Data Mar 2023) UPLOAD.pdf | 18 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer's Certificate Raheja Ascencio 2023-06-28 (Mar 2023) REVISED UPLOAD.pdf | 18 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2023-06-30 UPLOAD.pdf | 18 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Engineer's Certificate Raheja Ascencio 2023-06-28 (Mar 2023) REVISED UPLOAD.pdf | 18 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate Raheja Ascencio 2023-07-11 (Data Mar 2023) UPLOAD.pdf | 18 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A Engineer's Quality Assurance Certificate FY 22-23 Raheja Ascencio UPLOAD.pdf | 22 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A Engineer's Quality Assurance Certificate FY 22-23 Raheja Ascencio UPLOAD.pdf | 8 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A Engineer's Quality Assurance Certificate 2022-03-31 Raheja Ascencio UPLOAD.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2023-03-31 FINAL UPLOAD.pdf | 19 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Raheja Ascencio Declaration for Society Formation 2023-01-19 UPLOAD.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-12-31 UPLOAD.pdf | 19 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Raheja Ascencio Society Formation Letter 2023-01-18 UPLOAD.pdf | 19 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-11-30 UPLOAD.pdf | 9 Dec 2022 |
| Proforma of Agreement for saleFile: Raheja Ascencio AFS 2022-11-23 UPLOAD.pdf | 6 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-10-31 UPLOAD.pdf | 10 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-09-30 UPLOAD.pdf | 11 Oct 2022 |
| Proforma of Allotment letterFile: Raheja Ascencio AFS 2022-09-15 UPLOAD.pdf | 11 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 5 Raheja Ascencio KRCPL FY 2021-22 Certificate UPLOAD.pdf | 30 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-08-31 UPLOAD.pdf | 16 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-07-31 UPLOAD.pdf | 4 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2335484_FurtherCC_signed 2022-07-04 UPLOAD.pdf | 8 Jul 2022 |
| Declaration about Commencement CertificateFile: Raheja Ascencio Declaration of CC 2022-07-07 UPLOAD.pdf | 8 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-06-30 UPLOAD.pdf | 8 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Engineer's Quality Assurance Certificate 2022-03-31 Raheja Ascencio UPLOAD.pdf | 15 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-05-31 UPLOAD.pdf | 14 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-04-30 BV Modified UPLOAD.pdf | 11 May 2022 |
| Disclosure of sold/ booked inventoryFile: Ascencio Inventory 2022-03-31 UPLOAD1.pdf | 11 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2321317_FurtherCC_signed 2022-03-21 UPLOAD.pdf | 7 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 20 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 126 filed documents as one ZIP, foldered, with a manifest
Keep RAHEJA ASCENCIO on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near POWAI6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 73 registered projects within 2 km.
AMARYLLIS TOWERS AND PLAZA
NAHAR BUILDERS LTD.
JANGID MEADOWS
JANGID HOME PVT LTD
NAHAR'S CHANDI VALLEY - PHASE I
NAHAR BUILDERS LIMITED
KABRA RESIDENCY PARK
AHINSA BUILDTECH PVT LTD
IBIS at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
BARBET at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
See every Mumbai Suburban project, with the district possession charts
Builder: K RAHEJA CORP REAL ESTATE PRIVATE LIMITED
K Raheja Corp Real Estate Private Limited has 21 registrations on MahaRERA, including Estrella, Viva, Pirangut and Orion, Viva, Pirangut. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 16 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if RAHEJA ASCENCIO is delayed beyond 30 May 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAHEJA ASCENCIO?
The registered promoter entity is K RAHEJA CORP REAL ESTATE PRIVATE LIMITED, a company as per the filing. Its CIN U40300MH2007PTC287012 and GSTIN 27AABCF1838M1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAHEJA ASCENCIO?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAHEJA ASCENCIO?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in RAHEJA ASCENCIO?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback