RADIANT 59

By VEER JALARAM DEVELOPERS

RG-MH-29312 · RERA P51800030749 · Last updated on MahaRERA portal: 2 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
25 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
0 of 87Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

RADIANT 59 is a Others project by VEER JALARAM DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030749 on 13 Sep 2021. Possession is promised by 31 Dec 2026. 87 of the 87 units on this registration are recorded sold or booked, and 25 of 33 construction stages are filed complete.

At a glance

Project

  • NameRADIANT 59
  • TypeOthers
  • Location
    • MAROL MAROSHI ROAD
    • NEAR A J HOUSE
    • MAROL NAKA
    • MAROL
    • ANDHERI EAST
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800030749
  • ReraGenie IDRG-MH-29312

Builder

  • NameVEER JALARAM DEVELOPERS
  • Entity typePartnership
  • GSTIN27AALFV8133G1ZU

Key dates

this monthRegisteredSep 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Sep 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed89 files

Current status

100%87 of 87 units booked

Figures as on 2 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA202042042
B WINGNA202045045
C WINGNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 2 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

A WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes80%
Street LightingYes0%
Community BuildingsYes60%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,846 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2026
LandownerVillageDistrict
METAL TUBES AND ROLLING MILLSMumbai CityMumbai City
METAL TUBES & ROLLING MILLS-Mumbai City

Approvals and building plan

Permissible FSI9896.57
Proposed, not sanctioned5,395 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchREIS MAGOS,RAMDAS SUTRALE MARG, BORIVALI WEST MUMBAI 400092

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTWIASKAR & ASSOCIATES
EngineerMAYUR DINESH PANDYA
Chartered AccountantNEHALI AND CO
PartnerRole in project
VEER JALARAM DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 23-24.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Clint - Final Certificate sign.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Tiwaskarsir (architect certificate)sign.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Ascent (engineer certificate)sign.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Nehali (CA) sign.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Tiwaskar FORM 1.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Ascent Form 2.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Oct-Dec-2023 Final.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Tiwaskar - Form 1 Signed.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Ascent - Form B signed.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Ca Certificate Veer Jalaram sep'23-12.pdf14 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech - Tiwaskar 1st Qtr.pdf14 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Mayur Pandya Form 2 - 1st Qtr.pdf14 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer - Clint Form 2A - 1st Qtr.pdf14 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - Certificate 1st Qtrs.pdf14 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed Ca Certificate Veer Jalaram Mar23.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf14 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engiener form 2.pdf14 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf14 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA form 5 21-22.pdf14 Oct 2022
Layout approvalFile: Drawing_1-1.pdf27 Jul 2022
Layout approvalFile: Drawing_2-3.pdf27 Jul 2022
Layout approvalFile: Drawing_4-5.pdf27 Jul 2022
Layout approvalFile: Drawing_6-7.pdf27 Jul 2022
Layout approvalFile: Drawing_8-end.pdf27 Jul 2022
Building plan approvalFile: IOD.pdf27 Jul 2022
Copy of Layout Approval (in case of layout)File: Drawing_1-1.pdf27 Jul 2022
Copy of Layout Approval (in case of layout)File: Drawing_2-3.pdf27 Jul 2022
Copy of Layout Approval (in case of layout)File: Drawing_4-5.pdf27 Jul 2022
Copy of Layout Approval (in case of layout)File: Drawing_6-7.pdf27 Jul 2022
Copy of Layout Approval (in case of layout)File: Drawing_8-end.pdf27 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf27 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf18 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Clint (Engineer's Certificate For Quality Assurance).pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf7 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf7 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: 2318015_FurtherCC_signed.pdf3 Jun 2022
Proforma of Allotment letterFile: Agreement For Sale flat revised.pdf24 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER FORM 2A.pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 FINAL.pdf28 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2.pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect Certificate form 1.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Ca Certificate form 3.pdf7 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate form 1.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate form 2.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: engineer certificate form 2A.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate form 3.pdf6 Oct 2021
Proforma of Allotment letterFile: For RERA Agreement For Sale - Phase 1 ALL PREMISES Radiant 59-converted-converted (1).pdf18 Sep 2021
Building plan approvalFile: Building Plan Approval _ NA Order for plotted development.pdf7 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval _ NA Order for plotted development.pdf7 Sep 2021
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf6 Sep 2021
Layout approvalFile: Drawing 1-3.pdf14 Aug 2021
Layout approvalFile: Drawing 4-6.pdf14 Aug 2021
Layout approvalFile: Drawing 7-9.pdf14 Aug 2021
Copy of the legal title reportFile: TITLE REPORT FINAL CTS 521,522,525,526,532-1-2.pdf14 Aug 2021
Copy of the legal title reportFile: TITLE REPORT FINAL CTS NO 523-524.pdf14 Aug 2021
Copy of the legal title reportFile: TITLE REPORT FINAL CTS NO 447C-1.pdf14 Aug 2021
Copy of Layout Approval (in case of layout)File: Drawing 1-3.pdf14 Aug 2021
Copy of Layout Approval (in case of layout)File: Drawing 4-6.pdf14 Aug 2021

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RADIANT 59 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI EAST6,700+ in Mumbai Suburban

2 kmRADIANT 59Completed 108Lapsed / revoked 56Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 232 registered projects within 2 km.

Builder: VEER JALARAM DEVELOPERS

VEER JALARAM DEVELOPERS has 1 registration on MahaRERA, including RADIANT 59. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RADIANT 59 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RADIANT 59?

The registered promoter entity is VEER JALARAM DEVELOPERS, a partnership as per the filing. Its GSTIN 27AALFV8133G1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RADIANT 59?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RADIANT 59?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RADIANT 59?

The professionals named in the filing: Architect: TWIASKAR & ASSOCIATES; Engineer: MAYUR DINESH PANDYA; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RADIANT 59?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RADIANT 59. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RADIANT 59 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.