Quba Residency

By QUBA GROUP

RG-MH-22741 · RERA P52100032265 · Last updated on MahaRERA portal: 30 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 36 months from the original
0 of 11Construction stages donefurthest along: Excavation, 95%
47 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

Quba Residency is a Others project by QUBA GROUP in Pune, Maharashtra, registered with MahaRERA as P52100032265 on 22 Dec 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 1 of the 48 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameQuba Residency
  • TypeOthers
  • Location
    • C.t.s.No.148+1081
    • Nana Peth
    • Pune
    • Peth
    • Haveli
    • Pune
    • 411002
  • Pincode411002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032265
  • ReraGenie IDRG-MH-22741

Builder

  • NameQUBA GROUP
  • Entity typePartnership

Key dates

this monthRegisteredDec 2021First promiseDec 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Dec 2021
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed106 files

Current status

2%1 of 48 units booked
30.9%Work done, per cost certificate

Figures as on 30 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Quba ResidencyNA98371148

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.

Quba Residency: 38% average across the applicable activities

ActivityProgress
Excavation95%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor0%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered7
Open Space1

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area571 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Dec 2025
LandownerVillageDistrict
DURRESHAWAR TASLIM SHAIKHPethPune
Gohar Sultana Ebrahim KhanPisoliPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3035.64
Proposed, not sanctioned2,024 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMudaliar Rd, Porwal Metallica, Somwar Peth, Pune, Maharashtra 411011
Estimated costRs 4.13 cr
Cost incurredRs 1.27 cr
Work done30.87%
BuildingWingEstimatedIncurred
Quba ResidencyNARs 3.30 crRs 1.06 cr
-NARs 83.00 lakhRs 21.25 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCONFIDE DESIGNS
EngineerJAMEEL S ANSARI
EngineerJameel Ansari
Chartered AccountantIMRAN MEMON AND ASSOCIATES
Chartered AccountantAnam and Associates
PartnerRole in project
Quba Group-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09022619774Dec 2025 → Dec 2028

Reason as filed by the promoterThe project could not be completed within the approved timeline due to unavoidable delays caused by labour shortages, intermittent disruption in availability of construction materials, and delays in statutory approvals from concerned authorities. These factors were beyond the control of the Promoter and impacted the progress of construction.

Litigation declared3

CaseCourtStatus
CIVIL SUIT/31/2022/2022DISTRICT COURT OF PUNEOngoing
Spl civil suit/120/2023/2023DISTRICT COURT OF PUNEOngoing
Spl civil suit/120/2023/2023DISTRICT COURT OF PUNEOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf30 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf30 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf30 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf21 Apr 2026
Withdrawal Update Form 1File: Architect Certificate.pdf24 Jan 2026
Withdrawal Update Form 2File: form 2 quba.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf24 Jan 2026
Withdrawal Update Form 1File: Architect Certificate.pdf20 Jan 2026
Withdrawal Update Form 2File: form 2 quba.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 - Dec 25.pdf20 Jan 2026
Form 1File: Form 1 - Mar 25.pdf14 Jan 2026
Form 2File: Form 2 - Mar 25.pdf14 Jan 2026
Form 3File: Form 3 Mar 2025.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 25 - Sold Unsold.pdf14 Jan 2026
Form 1File: Form 1 - Dec 24.pdf14 Jan 2026
Form 2File: Form 2 - Dec 24.pdf14 Jan 2026
Form 3File: Form 3 Dec 2024.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Dec 24.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sep 24 - Sold Unsold.pdf14 Jan 2026
Form 3File: Form 3 September 2024.pdf14 Jan 2026
Form 2File: Form 2 - Sep 24.pdf14 Jan 2026
Form 1File: Form 1 - Sep 24.pdf14 Jan 2026
Form 1File: Form 1 - Jun 24.pdf14 Jan 2026
Form 2File: Form 2 - Jun 24.pdf14 Jan 2026
Form 3File: Form 3 Jun 2024.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Jun 24 - Sold Unsold.pdf14 Jan 2026
Form 3File: Form 3 Mar 2024.pdf14 Jan 2026
Form 2File: Form 2 - Mar 24.pdf14 Jan 2026
Form 1File: Form 1 - Mar 24.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 24 - Sold Unsold.pdf14 Jan 2026
Form 1File: Form 1 - Mar 24.pdf14 Jan 2026
Form 2File: Form 2 - Mar 24.pdf14 Jan 2026
Form 3File: Form 3 Mar 2024.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 24 - Sold Unsold.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 24 - Sold Unsold.pdf14 Jan 2026
Form 3File: Form 3 Mar 2024.pdf14 Jan 2026
Form 2File: Form 2 - Mar 24.pdf14 Jan 2026
Form 1File: Form 1 - Mar 24.pdf14 Jan 2026
Form 1File: Form 1 - Mar 24.pdf14 Jan 2026
Form 2File: Form 2 - Mar 24.pdf14 Jan 2026
Form 3File: Form 3 Mar 2024.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 24 - Sold Unsold.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 23 - Sold Unsold.pdf14 Jan 2026
Form 1File: Form 1 - FY 22-23.pdf14 Jan 2026
Form 2File: Form 2 - Mar 23.pdf14 Jan 2026
Form 3File: Form 3 Mar 2023.pdf14 Jan 2026
Form 1File: Form 1 - FY 22-23.pdf14 Jan 2026
Form 2File: Form 2 - Mar 23.pdf14 Jan 2026
Form 3File: Form 3 Mar 2023.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 23 - Sold Unsold.pdf14 Jan 2026
Form 1File: Form 1 - FY 22-23.pdf14 Jan 2026
Form 2File: Form 2 - Mar 23.pdf14 Jan 2026
Form 3File: Form 3 Mar 2023.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 23 - Sold Unsold.pdf14 Jan 2026
Form 1File: Form 1 - FY 22-23.pdf14 Jan 2026
Form 2File: Form 2 - Mar 23.pdf14 Jan 2026
Form 3File: Form 3 Mar 2023.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 23 - Sold Unsold.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 22 - Sold Unsold.pdf14 Jan 2026
Form 1File: Form 1 - FY 21-22.pdf14 Jan 2026
Form 2File: Form 2 - Mar 22.pdf14 Jan 2026
Form 3File: Form 3 Mar 2022.pdf14 Jan 2026
Form 1File: Form 1 - FY 21-22.pdf14 Jan 2026
Form 2File: Form 2 - Mar 22.pdf14 Jan 2026
Form 3File: Form 3 Mar 2022.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Mar 22 - Sold Unsold.pdf14 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - FY 24-25.pdf14 Jan 2026
Form 5 (FY 2021-2022)File: Form 5 FY 21-22.pdf14 Jan 2026
Form 5 (FY 2022-2023)File: Form 5 FY 22-23.pdf14 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 FY 23-24.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 - June 25.pdf13 Jan 2026
Withdrawal Update Form 1File: Form 1 - Sep 25.pdf13 Jan 2026
Withdrawal Update Form 1File: Form 1 - Mar 25.pdf13 Jan 2026
Withdrawal Update Form 2File: Form 2 - June 25 (1).pdf13 Jan 2026
Withdrawal Update Form 2File: Form 2 - Sep 25.pdf13 Jan 2026
Withdrawal Update Form 2File: Form 2 - Mar 25.pdf13 Jan 2026
Withdrawal Update Form 3File: QR - Form 3 - Jun 25.pdf13 Jan 2026
Withdrawal Update Form 3File: Form 3 September 2025.pdf13 Jan 2026

How this compares with Pune

2%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Quba Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nana Peth, Pune13,700+ in Pune

2 kmQuba ResidencyCompleted 169Lapsed / revoked 138Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 448 registered projects within 2 km.

Builder: QUBA GROUP

QUBA GROUP has 1 registration on MahaRERA, including Quba Residency. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Quba Residency is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Quba Residency?

The registered promoter entity is QUBA GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Quba Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Quba Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Quba Residency?

The professionals named in the filing: Architect: CONFIDE DESIGNS; Engineer: JAMEEL S ANSARI; Engineer: Jameel Ansari; Chartered Accountant: IMRAN MEMON AND ASSOCIATES; Chartered Accountant: Anam and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Quba Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Quba Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Quba Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.