ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / Pushpendra City - Sector 9

Completed No litigation declared Residential / Group Housing project

Pushpendra City - Sector 9

By Pushpendra Real Construction Private Limited

RG-MH-12589 · RERA P52800001505 · Last updated on MahaRERA portal: 27 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedregistration recorded completed
72 of 99Construction stages doneacross 9 buildings; furthest along: Podiums (if any), 0%
0 of 11Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

Pushpendra City - Sector 9 is a Residential / Group Housing project by Pushpendra Real Construction Private Limited in Ratnagiri, Maharashtra, registered with MahaRERA as P52800001505 on 28 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2028. 11 of the 11 units on this registration are recorded sold or booked, and 72 of 99 construction stages are filed complete.

At a glance

Project

  • NamePushpendra City - Sector 9
  • TypeResidential / Group Housing
  • Location
    • RATNAGIRI
    • Khedshi
    • 415639
  • Pincode415639
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800001505
  • ReraGenie IDRG-MH-12589

Builder

  • NamePushpendra Real Construction Private Limited
  • Entity typeCompany
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2017PromisedJun 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jul 2017
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings9 building records
  • Documents filed52 files

Current status

100%11 of 11 units booked
100.0%Work done, per cost certificate

Figures as on 27 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bunglow 51 and 52NA21202
Bunglow S 15NA22101
Bunglow S 09NA22101
Bunglow S 12NA20101
Bunglow S 16NA22101
Bunglow TW 61 and 62NA20000
Bunglow TW 57 and 58NA22202
Bunglow TW 59 and 60NA22202
Bunglow S 10NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 27 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

72 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Podiums (if any), at 0%.

Bunglow 51 and 5282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bunglow S 1582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bunglow S 0982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bunglow S 1282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bunglow S 1682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bunglow TW 61 and 620%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bunglow TW 57 and 5882%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bunglow TW 59 and 6082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bunglow S 1082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area30 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityTOWN PLANNING RATNAGIRI
Permissible FSI1403.83
Proposed, not sanctioned1,404 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRatnagiri
Estimated costRs 2.73 cr
Cost incurredRs 2.73 cr
Work done100.0%
BuildingWingEstimatedIncurred
Bunglow 51 and 52NARs 42.48 lakhRs 42.48 lakh
Bunglow TW 57 and 58NARs 40.00 lakhRs 40.00 lakh
Bunglow TW 59 and 60NARs 40.00 lakhRs 40.00 lakh
Bunglow S 10NARs 35.42 lakhRs 35.42 lakh
Bunglow S 15NARs 28.97 lakhRs 28.97 lakh
Bunglow S 16NARs 28.59 lakhRs 28.59 lakh
Bunglow S 09NARs 20.00 lakhRs 20.00 lakh
Bunglow S 12NARs 20.00 lakhRs 20.00 lakh
-NARs 17.81 lakhRs 17.81 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetanjali Ghorpade
EngineerManoj Joshi
Chartered AccountantA S K A &CO
Chartered AccountantJOSHI CHHADVA & CO LLP
Chartered AccountantKirtane & Pandit LLP
PartnerRole in project
Pushpendra Real Construction Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Feb 2023

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Signed Form 1_Dec 25.pdf27 Mar 2026
Withdrawal Update Form 2File: Signed Form 2-Dec 25.pdf27 Mar 2026
Withdrawal Update Form 3File: Signed Form 3_December 2025.pdf27 Mar 2026
Withdrawal Update Form 1File: Signed form 1_September 25.pdf26 Mar 2026
Withdrawal Update Form 2File: Signed form 2_September 25.pdf26 Mar 2026
Withdrawal Update Form 3File: Signed form 3_September 2025.pdf26 Mar 2026
Withdrawal Update Form 1File: Form 1 mar 23.pdf29 Jul 2025
Withdrawal Update Form 2File: Form 2 mar 23.pdf29 Jul 2025
Withdrawal Update Form 3File: FORM 3-SECTOR 9 _MARCH 2023.pdf29 Jul 2025
Form 1File: Form 1 mar 23.pdf23 Jul 2025
Form 2File: Form 2 mar 23.pdf23 Jul 2025
Form 3File: FORM 3-SECTOR 9 _MARCH 2023.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf23 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration mar 23.pdf23 Jul 2025
Details of encumbrancesFile: ABL loan no dues certificate.pdf28 Jan 2025
Status of ConveyanceFile: खेडशी_152_क_2_Satbara.pdf3 Apr 2023
Status of ConveyanceFile: खेडशी_152_क_9_Satbara (1).pdf3 Apr 2023
Status of ConveyanceFile: खेडशी_152_क_3_Satbara.pdf3 Apr 2023
Status of ConveyanceFile: खेडशी_152_क_10_Satbara.pdf3 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SINGLE BUNGALOW NOS12.pdf27 Feb 2023
Certificates of CA (Form 3)File: Form 3 Sector 9 31122021 signed.pdf25 Feb 2023
Certificates of CA (Form 3)File: Form 3 Sector 9 31032022 signed.pdf25 Feb 2023
Certificates of CA (Form 3)File: Form 3 Sector 9 30062022 signed.pdf25 Feb 2023
Certificates of CA (Form 3)File: Form 3 Sector 9 30092022 signed.pdf25 Feb 2023
Certificates of CA (Form 3)File: Form 3 Sector 9 31122022 signed.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Sector 9 21-22.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Sector 9 17-18.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Sector 9 18-19.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Sector 9 19-20.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Sector 9 20-21.pdf18 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sec 9 architect.pdf17 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: sec 9 engineer.pdf17 Jan 2023
Building plan approvalFile: Shetye plan.pdf2 Nov 2021
Building plan approvalFile: plan.pdf2 Nov 2021
Building Plan Approval (IOD)File: Shetye plan.pdf2 Nov 2021
Building Plan Approval (IOD)File: plan.pdf2 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Nerurkar NA Order.pdf2 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Shetye NA Order.pdf2 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SECTOR NO 09.pdf5 Dec 2018
Building plan approvalFile: Plan Sec 9.pdf21 Jul 2017
Layout approvalFile: Layout Sector 09.PDF21 Jul 2017
PAN CardFile: PAN Card.pdf21 Jul 2017
Copy of the legal title reportFile: TITLE CERT SEC 09.pdf21 Jul 2017
Details of encumbrancesFile: 3 ENCUMBRANCES sec 9.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Sector 09.PDF21 Jul 2017
Building Plan Approval (IOD)File: Plan Sec 9.pdf21 Jul 2017
Declaration in FORM BFile: Form B Sec 9.PDF21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect report sec 9.pdf21 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate sec 9.PDF21 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Sec 9.PDF21 Jul 2017
Proforma of Allotment letterFile: Allotment and agr to sale sector 9.pdf21 Jul 2017
OtherFile: Agr to sale Single Bung Sec 9.pdf21 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Pushpendra City - Mahalakshmi RoyalMahalakshmi Royal Survey No 152B6 Khedshi Ratnagiri99CompletedMay 2015May 2015
Pushpendra City- Mahalakshmi TowerMahalakshmi Tower Survey No 152B2 Khedshi Ratnagiri76CompletedNov 2014Nov 2014
Mahalakshmi ClassicMahalakshmi Classic Survey No 152B7 Khedshi Ratnagiri120CompletedOct 2013Oct 2013

How this compares with Ratnagiri

100%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Pushpendra City - Sector 9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RATNAGIRI1,100+ in Ratnagiri

2 kmPushpendra City - SectorCompleted 7Lapsed / revoked 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: Pushpendra Real Construction Private Limited

Pushpendra Real Construction Private Limited has 7 registrations on MahaRERA, including Pushpendra City- Mahalakshmi Presidency and Pushpendra City- Mahalakshmi Enclave. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Pushpendra City - Sector 9 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pushpendra City - Sector 9?

The registered promoter entity is Pushpendra Real Construction Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pushpendra City - Sector 9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pushpendra City - Sector 9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pushpendra City - Sector 9?

The professionals named in the filing: Architect: Geetanjali Ghorpade; Engineer: Manoj Joshi; Chartered Accountant: A S K A &CO; Chartered Accountant: JOSHI CHHADVA & CO LLP; Chartered Accountant: Kirtane & Pandit LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pushpendra City - Sector 9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pushpendra City - Sector 9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pushpendra City - Sector 9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.