Purva Silversands Phase 2

By Pune Projects LLP

RG-MH-19752 · RERA P52100005377 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 7 cases
  • 23 complaints at MahaRERA
  • Completion date moved by 47 months
  • 4 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 47 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
25 of 336Units unsoldnot recorded sold or booked
23Complaints at MahaRERAon this registration
Jump to the 147 documents Report an error

Purva Silversands Phase 2 is a Others project by Pune Projects LLP in Pune, Maharashtra, registered with MahaRERA as P52100005377 on 11 Aug 2017. Possession is promised by 30 Oct 2026. The completion date has moved by 47 months from the original filing. 311 of the 336 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 23 complaints are on record with the regulator.

At a glance

Project

  • NamePurva Silversands Phase 2
  • TypeOthers
  • Location
    • Keshavnagar Road
    • Keshavnagar
    • Mundhawa
    • Haveli
    • Pune
    • 410036
  • Pincode410036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005377
  • ReraGenie IDRG-MH-19752

Builder

  • NamePune Projects LLP
  • Entity typePartnership
  • CompanyPuravankara Limited
  • Other registrations10 more →
  • Completed1 of 11
  • Declared earlier projects8 →

Key dates

this monthRegisteredAug 2017First promiseNov 2022Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion30 Oct 2026
  • Revised completionRevised to 30 Oct 2026 (originally 28 Nov 2022)
  • Buildings1 building record
  • Documents filed147 files

Current status

93%311 of 336 units booked
85.2%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Phase 2 Building 1NA22213360336

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Phase 2 Building 1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Open Space27

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,011 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Dec 2025
LandownerVillageDistrict
Oxford Shelters Private LimitedMundhawaPune
Hritik Technologies & Realty Private LimitedMundhawaPune

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI15788.76
Proposed, not sanctioned15,789 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM G Road Bangalore 560001
Estimated costRs 51.38 cr
Cost incurredRs 43.78 cr
Work done85.21%
BuildingWingEstimatedIncurred
Phase 2 Building 1NARs 46.73 crRs 41.65 cr
-NARs 4.65 crRs 2.12 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRana Ram Ram
ArchitectAbhijit Konde
ArchitectMaster Plan Landscape Architect
EngineerJW Consultants LLP
Chartered AccountantVDSR and CO LLP
Chartered AccountantBhavana Bhat
PartnerRole in project
Pune Projects LLP-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012892Nov 2022 → Nov 2023

Reason as filed by the promoterI state that the completion work of the said project has been delayed due to certain mitigating circumstances. I further state that the promoter of the said project is desirous of completing the balance project completion work at the earliest and has obtained the necessary approvals/sanctions for the same. In view of the facts stated above, I hereby seek an extension of the project registration validity of the said project upto November 28, 2023 under the provisions of section 6 of the Real Estate (Regulation and Development) Act 2016 and the rules and regulations made thereunder.

EXT52100018309Nov 2022 → Nov 2024

Reason as filed by the promoterI state that the completion work of the said project has been delayed due to certain mitigating circumstances. I further state that the promoter of the said project is desirous of completing the balance project completion work at the earliest and has obtained the necessary approvals/sanctions for the same. In view of the facts stated above, I hereby seek an extension of the project registration validity of the said project upto November 28, 2024

EXT52100019826Nov 2022 → Nov 2025

Reason as filed by the promoterWe state that the registration validity of the said project has expired on September 30, 2024, and pursuant to the same we have filed an application seeking further extension till Sept 2025 as provided under Section 7 of the act. We hereby wish to state that the building is standalone building in which the 1st ten floors have already been in the stage of completion and the extension is sought only for 11th floor to 21st floor. The delay to achieve completion of the project is neither wilful or deliberate but due to various factors such as fallout of Covid Pandemic, labour exodus, issues with p

EA23062501712Nov 2022 → Oct 2026

Reason as filed by the promoterI state that the completion work of the said project has been delayed due to certain mitigating circumstances. I further state that the promoter of the said project is desirous of completing the balance project completion work at the earliest and has obtained the necessary approvals/sanctions for the same. In view of the facts stated above, I hereby seek an extension of the project registration validity of the said project upto 30.10.2025 as we have sought extension only to complete the balance floors that is by 11th to 21st floor we also wish to state and submit that we have obtained OC for 1

Litigation declared7

CaseCourtStatus
2033/2011Pune District & Session CourtOngoing
1670/2013Pune District & Session CourtOngoing
1268/2016Pune District & Session CourtOngoing
216/2009Pune District & Session CourtOngoing
332,380,679/2016Bombay High CourtClosed
1263/2006Pune District & Session CourtClosed
897/2008Pune District & Session CourtOngoing

Complaints filed with MahaRERA23

Case no.ComplainantRespondentFiled
CC005000000011242Umed Ramesh KshirsagarOxford Shelters Private Limited23/03/2018
CC005000000106553Pune Projects LLPMahendra Mugutrao Baandal02/02/2022
CC005000000106563Pune Project LLPShripad S Malap02/02/2022
CC005000000106564Pune Project LLPRajiv Agarwal02/02/2022
CC005000000106566Pune Project LLPPote Sunita Santosh02/02/2022
CC005000000106569Pune Project LLPRajesh Singh02/02/2022
CC005000000096290HEMANT MOTISAGAR BHATIAPURAVANKARA PUNE PROJECTS24/11/2021
CC005000000167464Hemant ThardPurva Silversand31/08/2022
CC005000000279767KANCHAN KAKKARPINNI 3 CO OPERATIVE HSG SOCIETY LTD.27/11/2023
CC12501170MAHADEV PANDURANG DANDIPune Projects LLP08/04/2025
CC12502270Avinash Ramesh AbnavePune Projects LLP06/07/2025
CC12503158PRATAP RAJNISH SINGHPune Projects LLP07/09/2025
CC12503580KISHOR SHANKAR KAWLEPune Projects LLP08/10/2025
CC12503687Sachin Pandurang WaghmarePune Projects LLP16/10/2025
CC12503661Rahul Gopalrao BijalpurePune Projects LLP14/10/2025
CC12503670Shrikant Tatyarao SonwanePune Projects LLP15/10/2025
CC12503671Shrikant Tatyarao SonwanePune Projects LLP15/10/2025
CC12503681Madhvi Abhinav ShrivastavaPune Projects LLP16/10/2025
CC12503682Madhvi Abhinav ShrivastavaPune Projects LLP16/10/2025
CC12503683Vitthal Kisan ChavanPune Projects LLP16/10/2025
CC12503688GAURAV VED MALIKPune Projects LLP16/10/2025
CC12504673Pradnya Rahul GadkariPune Projects LLP29/12/2025
CC12602163Ray A KanrarPune Projects LLP13/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2026

Documents filed147

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 147 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 June.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2 June.pdf13 Aug 2026
Withdrawal Update Form 3File: 0202_001.pdf13 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf10 Aug 2026
Withdrawal Update Form 1File: Architect Certificate.pdf2 Apr 2026
Withdrawal Update Form 2File: Building 1.pdf2 Apr 2026
Withdrawal Update Form 3File: Form 3_compressed (1).pdf2 Apr 2026
Withdrawal Update Form 1File: Form 1 (RERA) - Architect Certificate for PSS and B1-30-Sept-25.pdf1 Apr 2026
Withdrawal Update Form 2File: Building 1.pdf1 Apr 2026
Withdrawal Update Form 3File: Silversand 2 Q2 Sept_compressed.pdf1 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect June.pdf24 Mar 2026
Withdrawal Update Form 2File: Form 2 June.pdf24 Mar 2026
Withdrawal Update Form 3File: Form 3 CA June_compressed.pdf24 Mar 2026
Form 1File: Form 1 Architect Certificate.pdf4 Jul 2025
Form 2File: Form 2 Engineer.pdf4 Jul 2025
Form 3File: Form 3 CA_compressed.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold.pdf4 Jul 2025
Form 2A (FY 2024-2025)File: Silver 2A 24-25.pdf24 Jun 2025
Form 5 (FY 2024-2025)File: Silversand 2 Form 5.pdf24 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 A _Silversands_FY-24-25_Q1.pdf7 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Silversans Phase 2.pdf7 Apr 2025
Certificates of CA (Form 3)File: Silversand 2 CA Q3_compressed.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (RERA) - Architect Certificate for PSS and B1-31-Dec-24.pdf5 Apr 2025
Certificates of CA (Form 3)File: Silversand 2 CA.pdf5 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 A _B1_FY-24-25_Q1.pdf5 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg SILEVRSANDS Phase 02.pdf20 May 2024
Certificates of CA (Form 3)File: Silversand Form 3.pdf20 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (RERA) - Architect Certificate.pdf14 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (RERA) - Architect Certificate Phase 1 and 1A _B1 to B9 -Phase- 30-Dec-23.pdf14 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.pdf11 Jan 2024
Certificates of CA (Form 3)File: FORM-3_compressed.pdf11 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (RERA) - Architect Certificate Phase 1 and 1A _B1 to B9 -Phase- 30-Sep-23.pdf3 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf3 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold.pdf3 Jan 2024
Certificates of CA (Form 3)File: Silversand 2 Form 3_compressed.pdf3 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf3 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (RERA) - Architect Certificate Phase 1 and 1A _B1 to B9 -Phase- 30-Jun-23.pdf31 Aug 2023
Certificates of CA (Form 3)File: PURVA_SILVERSAND_1_A_compressed (1).pdf31 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Purva Silversend 2 Form 3.pdf23 May 2023
Certificates of CA (Form 3)File: Purva Silversend 2 Form 3.pdf23 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 221122132222_0001.pdf7 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3.pdf6 Dec 2022
Certificates of CA (Form 3)File: 1.pdf6 Dec 2022
Certificates of CA (Form 3)File: 2.pdf6 Dec 2022
Certificates of CA (Form 3)File: 3.pdf6 Dec 2022
Certificates of CA (Form 3)File: 4.pdf6 Dec 2022
Certificates of CA (Form 3)File: 4.pdf6 Dec 2022
Certificates of CA (Form 3)File: 5.pdf6 Dec 2022
Certificates of CA (Form 3)File: 6.pdf6 Dec 2022
Certificates of CA (Form 3)File: 7.pdf6 Dec 2022
Certificates of CA (Form 3)File: 8.pdf6 Dec 2022
Certificates of CA (Form 3)File: 9.pdf6 Dec 2022
Certificates of CA (Form 3)File: 10.pdf6 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 2017-18.pdf5 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 2018-19.pdf5 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 2018-19.pdf5 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 2018-19.pdf5 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 2018-19.pdf5 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 2019-20.pdf5 Dec 2022

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 47 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Purva Silversands Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Keshavnagar13,700+ in Pune

2 kmPurva Silversands Phase Completed 16Lapsed / revoked 8Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: Pune Projects LLP

Pune Projects LLP has 11 registrations on MahaRERA, including Purva Silversand and Purva Silversands Phase 2. Its filings disclose 8 earlier MahaRERA projects: declares 3 of 8 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Purva Silversands Phase 2 is delayed beyond 30 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Purva Silversands Phase 2?

The registered promoter entity is Pune Projects LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Purva Silversands Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Purva Silversands Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Purva Silversands Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Purva Silversands Phase 2?

The professionals named in the filing: Architect: Rana Ram Ram; Architect: Abhijit Konde; Architect: Master Plan Landscape Architect; Engineer: JW Consultants LLP; Chartered Accountant: VDSR and CO LLP; Chartered Accountant: Bhavana Bhat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Purva Silversands Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Purva Silversands Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Purva Silversands Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.